Skip to main content
WireAndSun
Calculators
CEC Brand Hub

PEIMAR — CEC Certified Solar Equipment Catalog

Registry: California Energy Commission (CEC) Verified: 2026-11-26

PEIMAR holds 53 verified California Energy Commission (CEC) certifications including 53 module series (165–550W PV). PEIMAR carries 53 module series ranging from 165 W to 550 W STC (median 360 W vs 385 W CEC fleet median; 19.9% median aperture efficiency, cell architecture Mono-c-Si, Multi-c-Si). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Manufacturer
PEIMAR
PV Module Series
53
Listed Inverters
0
Output Range
165–550W PV
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Do PEIMAR Solar Specifications Compare Across the CEC Catalog?

How PEIMAR residential and commercial solar models stack up on aperture efficiency, winter voltage margin, and grid-interconnection readiness.

When specifying PEIMAR for older US residential panels, engineers balance nameplate wattage against main busbar 120% backfeed ceilings (NEC 705.12). PEIMAR carries 53 module series ranging from 165 W to 550 W STC (median 360 W vs 385 W CEC fleet median; 19.9% median aperture efficiency, cell architecture Mono-c-Si, Multi-c-Si). No active CPSC electrical recalls match PEIMAR in our federal recall archive as of 2026.

Which PEIMAR PV Module Series Are CEC Certified? (53)

Every deduplicated PEIMAR solar module series listed below links to its full PTC/STC rating table, cold-weather Voc curve, and roof area calculator.

Deduplicated CEC photovoltaic module series for PEIMAR.
Module Series STC (W) PTC (W) Voc (V) Eff (%) Variants
PEIMAR DR10H550M 550.0 515.7 49.6 21.48 1
PEIMAR SE550M 550.0 516.9 49.8 21.83 1
PEIMAR DR10H540M 540.0 506.1 49.4 21.09 4
PEIMAR SE535M 535.0 502.5 49.5 21.23 5
PEIMAR SE520M 520.0 488.0 49.2 20.63 1
PEIMAR SE505M 505.0 474.7 45.6 21.96 2
PEIMAR SE485M 485.0 455.4 45.2 21.09 5
PEIMAR DR10H455M 455.0 426.5 41.3 21.26 3
PEIMAR SE455M 455.0 427.6 41.3 21.67 3
PEIMAR SL455M 455.0 426.9 50.36 21.06 3
PEIMAR DR10H445M 445.0 416.9 41.1 20.79 2
PEIMAR SE440M 440.0 413.1 41.0 20.95 4
PEIMAR SF435M 435.0 406.8 50.5 20.71 4
PEIMAR SL435M 435.0 407.6 49.5 20.14 5
PEIMAR SF420M 420.0 392.4 48.96 20.0 2
PEIMAR DR10H410M 410.0 384.3 37.1 21.13 4
PEIMAR SE410M 410.0 385.3 37.2 21.69 4
PEIMAR SF405M 405.0 378.9 45.84 20.98 2
PEIMAR SM400M 400.0 371.5 50.39 20.62 1
PEIMAR DR10H395M 395.0 369.9 36.9 20.36 1
PEIMAR SE390M 390.0 366.0 36.8 20.63 3
PEIMAR SF390M 390.0 364.5 45.12 20.21 4
PEIMAR SM385M 385.0 357.2 49.66 19.85 5
PEIMAR SL380M 380.0 356.5 42.11 20.99 3
PEIMAR SL365M 365.0 342.1 41.4 20.17 4
PEIMAR SM365M 365.0 338.2 48.68 18.81 4
PEIMAR SF360M 360.0 336.6 41.2 20.57 4
PEIMAR SG360M 360.0 328.1 48.44 18.56 5
PEIMAR SF345M 345.0 322.2 40.5 19.71 1
PEIMAR SG335M 335.0 304.6 46.85 17.26 5
PEIMAR SG330P 330.0 299.7 46.24 17.01 2
PEIMAR SM330M (BF) 330.0 305.8 41.91 20.25 2
PEIMAR SM325M (FB) 325.0 300.0 41.67 19.94 1
PEIMAR SG320M 320.0 288.2 44.9 16.49 1
PEIMAR SG310M 310.0 280.5 40.81 19.02 4
PEIMAR SG310P 310.0 281.0 44.65 15.98 5
PEIMAR SM310M (BF) 310.0 286.8 40.94 19.02 5
PEIMAR SM310M (FB) 310.0 285.8 40.94 19.02 5
PEIMAR SG295P 295.0 263.7 43.3 15.2 1
PEIMAR SM295M (BF) 295.0 272.5 40.21 18.1 1
PEIMAR SM295M (FB) 295.0 271.6 40.21 18.1 1
PEIMAR SG290M 290.0 260.5 44.16 14.95 4
PEIMAR SG285P 285.0 255.9 39.02 17.48 4
PEIMAR SG275M 275.0 248.5 37.88 16.9 1
PEIMAR SG260M 260.0 234.5 37.39 15.98 5
PEIMAR SG260P 260.0 235.7 37.81 15.95 5
PEIMAR SG235M 235.0 211.4 36.65 14.44 5
PEIMAR SG235P 235.0 209.8 36.1 14.44 5
PEIMAR SG220M 220.0 197.6 36.29 13.52 1
PEIMAR SG215P 215.0 191.5 35.4 13.22 4
PEIMAR SG200M 200.0 178.0 45.7 15.67 1
PEIMAR SG185M 185.0 164.2 43.4 14.49 5
PEIMAR SG165M 165.0 146.0 42.5 12.92 3
What to Check & Best-Fit Scenarios

What Are the Design Limits and Best-Fit Uses for PEIMAR Solar Hardware?

Evaluate PEIMAR CEC certifications (165–550W PV), winter voltage limits, and main panel 120% backfeed constraints before finalizing your equipment contract.

  • PEIMAR certifies only photovoltaic modules on this CEC list; installers must pair them with a separate UL 1741 SA/SB grid-support inverter verified for NEC 690.7 winter Voc.
  • Constrained roofs: PEIMAR's median module aperture efficiency (19.9%) sits below the 19.91% CEC fleet median, requiring slightly more square feet per kilowatt.

PEIMAR Module + Third-Party Inverter

Pair PEIMAR modules (165–550W PV) with microinverters or string inverters rated above local cold-weather Voc.

Unshaded Roofs & Ground Mounts

Focus on dollar-per-watt cash bids below $2.95/W since Section 25D residential tax credits expired after 2025.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Practical answers covering PEIMAR CEC certifications, winter voltage headroom, and panel-busbar interconnection checks. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

How many PEIMAR solar models are verified on the CEC list?

Our CEC archive indexes 53 PEIMAR equipment records (53 module series and 0 inverter models) spanning 165–550W PV. Check local building department permit requirements for Peimar before finalizing component orders.

What should homeowners check before approving PEIMAR equipment on a solar quote?

Verify the exact CEC model string on your utility interconnection form, confirm cold-weather NEC 690.7 string Voc stays below inverter Vdcmax, and verify NEC 705.12 120% busbar capacity on your main breaker panel.

How efficient are PEIMAR solar panels compared to CEC averages?

Across listed series, PEIMAR modules show a median aperture efficiency of 19.9% versus 19.91% across all certified CEC photovoltaic panels. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Peimar.

Sources

  1. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  4. CPSC SaferProducts Recall Database (Panels, Breakers, Generators, Solar) — U.S. Consumer Product Safety Commission (CPSC), 2026-11 (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.