PEIMAR SE485M is a 485.0 W STC (455.4 W PTC) Mono-c-Si solar module ranking #4,730 of 21,677 CEC listings (top 22.2%; higher than 77.8% of peers). It delivers 21.09% efficiency, 45.2 V Voc at 25 C, and 49.34 V cold Voc at -10 C (12 panels max per 600 V string).
- STC Wattage
- 485.0 W
- PTC Wattage
- 455.4 W
- Voc @ 25C
- 45.2 V
- Efficiency
- 21.09%
How Does PEIMAR SE485M Compare Against Peer CEC Listings?
How PEIMAR PEIMAR SE485M handles rooftop heat (455.4 W PTC), 8 kW sizing, and cold winter string voltage.
PEIMAR builds the PEIMAR SE485M (Mono-c-Si) as a modern high-density residential and light-commercial module delivering 210.9 W/m2 (1.18 percentage points above 19.91% CEC median). Compared against Heliene 132HC-485 M10 SL (485.0 W), this model holds strong 93.9% PTC-to-STC heat retention (#5,210 of 21,677). Mid-range 45.2 V open-circuit voltage allows up to 12 panels per 600 V string at 14 F, while NEC 690.8 sets a 21.17 A overcurrent floor served by a 25 A breaker.
Where Does PEIMAR SE485M Fall Across Listed CEC Models?
Where PEIMAR SE485M (485.0 W) sits inside the 21,677-panel CEC STC wattage curve relative to the 385.0 W median.
What Dataset Percentiles Define PEIMAR SE485M?
Percentile placement of PEIMAR SE485M across power density (210.9 W/m2), thermal retention, and nameplate STC wattage. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
What Do the Dataset Ranks Show for PEIMAR SE485M?
Four critical engineering numbers homeowners and solar installers check first when reviewing PEIMAR SE485M specifications. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
Top 22.2% STC Output
485.0 W STC (+100.0 W vs all-CEC median) vs 410.0 W Mono-c-Si median.
21.09% Aperture Efficiency
Power density 210.9 W/m2 (1.18 percentage points above 19.91% CEC median). PTC/STC ratio: 93.9% (rank #5,210).
12 Panels Max @ -10 C (600 V)
Cold Voc reaches 49.34 V at -10 C (592.1 V string) and 50.53 V at -20 C (11 max).
17 Panels = 8,245 W STC
Occupies 39.1 m2 (421 sq ft) producing 7,742 W PTC; NEC 690.8 OCPD floor is 21.17 A (25 A breaker).
NEC 690.7(A) Cold-Temperature Voc & 690.8 OCPD Formula
Voc_cold = 45.2 * (1 + (-0.262/100) * (-10 - 25)) = 49.34 V | OCPD = 1.56 * 13.57 = 21.17 A
Inputs from CEC Modules.csv for PEIMAR SE485M: Voc=45.2 V, beta_Voc=-0.262%/C, Isc=13.57 A, STC=485.0 W, Area=2.3 m2.
Result: 12 panels max on 600 V (592.1 V); 17 panels for 8 kW (421 sq ft).
What Are the Published CEC Specifications for PEIMAR SE485M?
Verified electrical STC and PTC ratings, open-circuit voltage, short-circuit current, and physical area published for PEIMAR SE485M. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
| Parameter | Measured / Listed Value | Engineering Significance |
|---|---|---|
| Nameplate Power (STC) | 485.0 W | Rated DC output under Standard Test Conditions (1000 W/m2, 25C cell) |
| Real-World Output (PTC) | 455.4 W (93.9% STC) | PVUSA Test Conditions rating used for utility interconnection |
| Open-Circuit Voltage (Voc) | 45.2 V | Primary cold-weather string sizing limit under NEC 690.7 |
| Short-Circuit Current (Isc) | 13.57 A | Determines 156% (1.25x1.25) OCPD fuse/breaker sizing under NEC 690.8 |
| Max Power Voltage / Current | 38.24 V / 12.69 A | Inverter MPPT operating window alignment |
| Voc Temp Coefficient (beta_Voc) | -0.262 %/C | Negative slope governing voltage rise below 25C |
| Module Efficiency & Area | 21.09% (2.3 m2) | Array roof footprint density |
| Cell Count & Technology | 66 cells (Mono-c-Si) | Monofacial backsheet |
How Many PEIMAR SE485M Panels Build a 6 kW, 8 kW, or 10 kW Array?
Compare 6 kW, 8 kW, and 10 kW array footprints and Year-1 utility savings using PEIMAR SE485M (485.0 W).
| Target Array | Panels | Actual DC | Roof Area | US Avg ($/yr) | CA High ($/yr) |
|---|---|---|---|---|---|
| 6 kW Class | 13 | 6.3 kW | 322 sq ft | $1,577 | $2,666 |
| 8 kW Class | 17 | 8.24 kW | 421 sq ft | $2,062 | $3,487 |
| 10 kW Class | 21 | 10.19 kW | 520 sq ft | $2,550 | $4,313 |
Which Sibling Wattage & Trim Variants Belong to This PEIMAR Series?
All closely matched PEIMAR wattages and cosmetic trims sharing the PEIMAR SE485M architecture. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| Model Variant | STC (W) | PTC (W) | Voc (V) | Vmp (V) | Eff (%) |
|---|---|---|---|---|---|
| PEIMAR SE475M | 475.0 W | 445.8 W | 45.0 V | 38.07 V | 20.65% |
| PEIMAR SE480M | 480.0 W | 450.6 W | 45.1 V | 38.15 V | 20.87% |
| PEIMAR SE485M | 485.0 W | 455.4 W | 45.2 V | 38.24 V | 21.09% |
| PEIMAR SE490M | 490.0 W | 460.3 W | 45.3 V | 38.33 V | 21.3% |
| PEIMAR SE495M | 495.0 W | 465.1 W | 45.4 V | 38.41 V | 21.52% |
How Many PEIMAR SE485M Modules Fit in a Cold-Weather String?
Maximum series module counts for PEIMAR SE485M from 25 C down to -20 C (-4 F) under NEC 690.7.
| Ambient Min Temp | Cold Voc / Panel | Max Panels (600 V) | 600 V String Voc | Max Panels (1000 V) |
|---|---|---|---|---|
| -20 C (-4 F) | 50.53 V | 11 panels | 555.8 V | 19 panels |
| -10 C (14 F) | 49.34 V | 12 panels | 592.1 V | 20 panels |
| 0 C (32 F) | 48.16 V | 12 panels | 577.9 V | 20 panels |
| 25 C (77 F STC) | 45.2 V | 13 panels | 587.6 V | 22 panels |
Which Cross-Brand Solar Modules Compare Closest to PEIMAR SE485M?
Alternative CEC solar modules from competing brands near PEIMAR SE485M (485.0 W), including Heliene 132HC-485 M10 SL. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
| Alternative Module | STC (W) | Delta vs This | Voc (V) | Eff (%) | PTC/STC |
|---|---|---|---|---|---|
| Heliene 132HC-485 M10 SL Heliene |
485.0 W | Tie (0 W) | 45.77 V | 21.18% | 94.3% |
| Auxin Solar AXN10M485B Auxin Solar |
485.0 W | Tie (0 W) | 43.98 V | 22.56% | 92.0% |
| Auxin Solar AXN10M485W Auxin Solar |
485.0 W | Tie (0 W) | 43.98 V | 22.56% | 91.8% |
| Hanersun Energy Co Ltd HN18N-60HT485W Hanersun Energy Co Ltd |
485.0 W | Tie (0 W) | 43.0 V | 22.99% | 94.9% |
What Are the Design Limits and Best-Fit Uses for PEIMAR SE485M?
Evaluate PEIMAR SE485M (485.0 W STC, 45.2 V Voc) against your roof geometry, winter climate, and inverter voltage ceiling before finalizing bids.
- Winter overvoltage boundary: at -20 C (-4 F), PEIMAR SE485M reaches 50.53 V per panel—exceeding 11 panels in series voids 600 V inverter warranties.
- Footprint constraint: 17 panels for an 8 kW build require 421 sq ft of unshaded roof plane — well-proportioned for residential pitched roofs needing 17 panels (421 sq ft) for an 8 kW array.
- 2026 tax credit baseline: cash residential installs of PEIMAR SE485M carry 0% federal 25D credit after 2025-12-31, making 18.54 c/kWh+ utility avoidance key.
PEIMAR SE485M 8 kW Residential Fit
Needs 17 modules (421 sq ft) with a 25 A string OCPD, offsetting ~$2,062/yr at US average tariffs.
Cold-Climate String Design (-10 C / -20 C)
Cap 600 V series strings at 12 panels (-10 C) or 11 panels (-20 C), or compare Heliene 132HC-485 M10 SL.
Bifacial / High-Heat Roof Check
Monofacial backsheet sealing targets flush dark shingle rooftop mounts. Real-world output tracks 455.4 W PTC.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Technical answers for PEIMAR SE485M by PEIMAR grounded in CEC test data and NEC 690.7/690.8 limits. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
What fuse or breaker size does NEC 690.8 require for PEIMAR SE485M?
Multiplying PEIMAR SE485M's 13.57 A short-circuit current by 1.56 equals 21.17 A minimum ampacity, requiring at least a 25 A overcurrent fuse or breaker. Check local building department permit requirements for PEIMAR SE485M before finalizing component orders.
Can PEIMAR SE485M pair with microinverters instead of a 600 V string inverter?
Yes—if the microinverter DC input ceiling exceeds 49.34 V cold Voc at 14 F and handles 13.57 A Isc; string inverters cap PEIMAR SE485M at 12 panels on 600 V.
Is PEIMAR SE485M eligible for the 30% federal 25D solar credit in 2026?
No. Federal Section 25D expired December 31, 2025 under Public Law 119-21, so 2026 cash installs of PEIMAR SE485M rely on utility bill offset (~$2,062/yr at 8 kW) rather than 25D.
Sources
- CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)