Skip to main content
WireAndSun
Calculators
Federal County Index

US County Electrical Grid, Wiring Age & Outage Directory (3,144 Counties)

Coverage: 3,144 US Counties (50 States + DC) Verified: 2026-11-26

WireAndSun combines Census ACS 2023 housing vintage, FEMA National Risk Index severe-weather scores, OpenFEMA electrical grid disasters (2015–2026), DOE IECC climate zones, and Form EIA-861 utility service territories for all 3,144 counties across 50 US states and DC. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Counties Indexed
3,144
States + DC
51
Housing Vintage
Census ACS 2023
Hazard Benchmark
FEMA NRI + OpenFEMA
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

Which State County Electrical Indexes Are Available? (51 Jurisdictions)

Select any US state below to browse every local county's pre-1980 wiring risk, FEMA power-grid disaster count, IECC zone, and serving electric utilities.

Click column headers to sort states by county count, average pre-1980 housing share, or state electricity rate.
State Directory Counties Pre-1980 Share Avg Rate (c/kWh) State NEC
Alabama Counties 67 43.3% 16.09 2020 NEC
Alaska Counties 30 39.0% 26.11 2023 NEC
Arizona Counties 15 32.7% 15.26 Local Adoption
Arkansas Counties 75 46.4% 12.87 2020 NEC
California Counties 58 51.1% 31.35 2022 CEC (2020 NEC base)
Colorado Counties 64 47.5% 15.69 2023 NEC
Connecticut Counties 9 66.8% 29.31 2020 NEC
Delaware Counties 3 38.7% 17.15 2023 NEC
District of Columbia Counties 1 70.3% 21.92 2017/2020 DC Code
Florida Counties 67 31.1% 15.21 2020 NEC (FBC 8th Ed.)
Georgia Counties 159 37.3% 14.74 2023 NEC
Hawaii Counties 5 53.5% 40.4 2020 NEC
Idaho Counties 44 49.9% 11.83 2023 NEC
Illinois Counties 102 64.8% 17.67 Local Adoption
Indiana Counties 92 58.4% 15.96 2020/2009 local
Iowa Counties 99 71.0% 13.62 2023 NEC
Kansas Counties 105 70.7% 14.44 Local Adoption
Kentucky Counties 120 45.2% 13.13 2023 NEC
Louisiana Counties 64 45.6% 12.52 2020 NEC
Maine Counties 16 55.4% 27.69 2023 NEC
Maryland Counties 24 46.8% 19.53 2023 NEC
Massachusetts Counties 14 65.4% 30.41 2023 NEC (MA Amendments)
Michigan Counties 83 59.3% 20.03 2023 NEC (MI Part 8)
Minnesota Counties 87 58.7% 15.83 2023 NEC
Mississippi Counties 82 45.0% 14.03 Local Adoption
Missouri Counties 115 53.6% 13.3 Local Adoption
Montana Counties 56 58.7% 12.99 2023 NEC
Nebraska Counties 93 72.1% 12.05 2023 NEC
Nevada Counties 17 37.0% 13.26 2023/2020 local
New Hampshire Counties 10 54.1% 24.53 2023 NEC
New Jersey Counties 21 62.4% 22.48 2023 NEC (NJ Rehab Subcode)
New Mexico Counties 33 49.4% 14.85 2023 NEC
New York Counties 62 68.3% 26.39 2020/2025 NY Code
North Carolina Counties 100 40.4% 14.0 2020 NEC (NC Amendments)
North Dakota Counties 53 63.7% 11.82 2023 NEC
Ohio Counties 88 61.1% 16.9 2023 NEC (Commercial) / 2019 Res.
Oklahoma Counties 77 55.9% 13.21 2023 NEC
Oregon Counties 36 53.2% 15.46 2023 OR Electrical Code
Pennsylvania Counties 67 65.5% 19.29 2017/2020 UCC
Rhode Island Counties 5 69.4% 29.48 2023 NEC
South Carolina Counties 46 39.1% 15.12 2020 NEC
South Dakota Counties 66 62.2% 13.32 2023 NEC
Tennessee Counties 95 42.1% 13.22 2017 NEC (Statewide)
Texas Counties 254 49.7% 15.4 2023 NEC
Utah Counties 29 41.4% 13.02 2023 NEC
Vermont Counties 14 56.4% 22.79 2023 NEC
Virginia Counties 133 48.9% 15.28 2021 USBC (2020 NEC)
Washington Counties 39 48.1% 13.17 2023 NEC (WAC 296-46B)
West Virginia Counties 55 56.1% 15.39 2020 NEC
Wisconsin Counties 72 55.4% 18.08 2017 NEC (SPS 316)
Wyoming Counties 23 52.2% 13.37 2023 NEC
What to Check & Best-Fit Scenarios

What Are the Limitations of Reference Data and Who Should Not Rely on It Alone?

Published government datasets and CEC lab ratings establish baseline electrical and solar bounds, subject to field verification at your specific property.

  • Tariffs change mid-year: verify your electric utility's current net-billing export tariff and transformer capacity before signing contracts.
  • NEC edition lags: state and city building departments enforce varying NEC editions (2017, 2020, 2023, or 2026) with local amendments.
  • Not a substitute for on-site inspection: busbar pitting, ungrounded circuits, or loose neutral lugs require in-person testing by a licensed electrician.

Grid-Outage Resilience Priority

Focus on high-SAIDI utilities (>180 min/yr) and verify 120% busbar capacity for a 60 A hybrid battery or 200 A transfer switch.

Post-25D Cash Solar Payback Focus

With 0% federal 25D in 2026, prioritize higher-tariff markets above 18 c/kWh and avoid 20%-35% loan dealer fees.

EV Charging & Circuit Safety

Hardwire 48 A chargers on 6 AWG Cu THHN (75 C) rather than 6/2 NM-B, or step down to 32 A (40 A breaker) on tight 100 A panels.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers below rely on Census ACS 2023 housing age, Form EIA-861 reliability data, FEMA NRI hazard scores, and NFPA 70 NEC.

Why does pre-1980 county housing age matter for electrical upgrades?

Homes built before 1980 (and especially 1965–1973 aluminum branch wiring or pre-1960 ungrounded knob-and-tube homes) frequently hold 60 A or 100 A fuse/breaker panels that require NEC load calculations, AFCI/GFCI protection, or 200 A upgrades before EV charger or solar installation.

How do FEMA NRI hazard scores guide standby generator and surge decisions?

Counties scoring above 75 in FEMA Wind, Winter, Hurricane, or Lightning percentiles face materially higher multi-day blackout risk and surge transients, raising the value of NEC 230.67 Type 1/2 surge protectors and generator interlock/transfer switches.

Sources

  1. American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
  2. FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
  3. OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
  4. Building America & IECC Climate Zone County Classifications — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
  5. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  6. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.