WireAndSun combines Census ACS 2023 housing vintage, FEMA National Risk Index severe-weather scores, OpenFEMA electrical grid disasters (2015–2026), DOE IECC climate zones, and Form EIA-861 utility service territories for all 3,144 counties across 50 US states and DC. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- Counties Indexed
- 3,144
- States + DC
- 51
- Housing Vintage
- Census ACS 2023
- Hazard Benchmark
- FEMA NRI + OpenFEMA
Which State County Electrical Indexes Are Available? (51 Jurisdictions)
Select any US state below to browse every local county's pre-1980 wiring risk, FEMA power-grid disaster count, IECC zone, and serving electric utilities.
| State Directory | Counties | Pre-1980 Share | Avg Rate (c/kWh) | State NEC |
|---|---|---|---|---|
| Alabama Counties | 67 | 43.3% | 16.09 | 2020 NEC |
| Alaska Counties | 30 | 39.0% | 26.11 | 2023 NEC |
| Arizona Counties | 15 | 32.7% | 15.26 | Local Adoption |
| Arkansas Counties | 75 | 46.4% | 12.87 | 2020 NEC |
| California Counties | 58 | 51.1% | 31.35 | 2022 CEC (2020 NEC base) |
| Colorado Counties | 64 | 47.5% | 15.69 | 2023 NEC |
| Connecticut Counties | 9 | 66.8% | 29.31 | 2020 NEC |
| Delaware Counties | 3 | 38.7% | 17.15 | 2023 NEC |
| District of Columbia Counties | 1 | 70.3% | 21.92 | 2017/2020 DC Code |
| Florida Counties | 67 | 31.1% | 15.21 | 2020 NEC (FBC 8th Ed.) |
| Georgia Counties | 159 | 37.3% | 14.74 | 2023 NEC |
| Hawaii Counties | 5 | 53.5% | 40.4 | 2020 NEC |
| Idaho Counties | 44 | 49.9% | 11.83 | 2023 NEC |
| Illinois Counties | 102 | 64.8% | 17.67 | Local Adoption |
| Indiana Counties | 92 | 58.4% | 15.96 | 2020/2009 local |
| Iowa Counties | 99 | 71.0% | 13.62 | 2023 NEC |
| Kansas Counties | 105 | 70.7% | 14.44 | Local Adoption |
| Kentucky Counties | 120 | 45.2% | 13.13 | 2023 NEC |
| Louisiana Counties | 64 | 45.6% | 12.52 | 2020 NEC |
| Maine Counties | 16 | 55.4% | 27.69 | 2023 NEC |
| Maryland Counties | 24 | 46.8% | 19.53 | 2023 NEC |
| Massachusetts Counties | 14 | 65.4% | 30.41 | 2023 NEC (MA Amendments) |
| Michigan Counties | 83 | 59.3% | 20.03 | 2023 NEC (MI Part 8) |
| Minnesota Counties | 87 | 58.7% | 15.83 | 2023 NEC |
| Mississippi Counties | 82 | 45.0% | 14.03 | Local Adoption |
| Missouri Counties | 115 | 53.6% | 13.3 | Local Adoption |
| Montana Counties | 56 | 58.7% | 12.99 | 2023 NEC |
| Nebraska Counties | 93 | 72.1% | 12.05 | 2023 NEC |
| Nevada Counties | 17 | 37.0% | 13.26 | 2023/2020 local |
| New Hampshire Counties | 10 | 54.1% | 24.53 | 2023 NEC |
| New Jersey Counties | 21 | 62.4% | 22.48 | 2023 NEC (NJ Rehab Subcode) |
| New Mexico Counties | 33 | 49.4% | 14.85 | 2023 NEC |
| New York Counties | 62 | 68.3% | 26.39 | 2020/2025 NY Code |
| North Carolina Counties | 100 | 40.4% | 14.0 | 2020 NEC (NC Amendments) |
| North Dakota Counties | 53 | 63.7% | 11.82 | 2023 NEC |
| Ohio Counties | 88 | 61.1% | 16.9 | 2023 NEC (Commercial) / 2019 Res. |
| Oklahoma Counties | 77 | 55.9% | 13.21 | 2023 NEC |
| Oregon Counties | 36 | 53.2% | 15.46 | 2023 OR Electrical Code |
| Pennsylvania Counties | 67 | 65.5% | 19.29 | 2017/2020 UCC |
| Rhode Island Counties | 5 | 69.4% | 29.48 | 2023 NEC |
| South Carolina Counties | 46 | 39.1% | 15.12 | 2020 NEC |
| South Dakota Counties | 66 | 62.2% | 13.32 | 2023 NEC |
| Tennessee Counties | 95 | 42.1% | 13.22 | 2017 NEC (Statewide) |
| Texas Counties | 254 | 49.7% | 15.4 | 2023 NEC |
| Utah Counties | 29 | 41.4% | 13.02 | 2023 NEC |
| Vermont Counties | 14 | 56.4% | 22.79 | 2023 NEC |
| Virginia Counties | 133 | 48.9% | 15.28 | 2021 USBC (2020 NEC) |
| Washington Counties | 39 | 48.1% | 13.17 | 2023 NEC (WAC 296-46B) |
| West Virginia Counties | 55 | 56.1% | 15.39 | 2020 NEC |
| Wisconsin Counties | 72 | 55.4% | 18.08 | 2017 NEC (SPS 316) |
| Wyoming Counties | 23 | 52.2% | 13.37 | 2023 NEC |
What Are the Limitations of Reference Data and Who Should Not Rely on It Alone?
Published government datasets and CEC lab ratings establish baseline electrical and solar bounds, subject to field verification at your specific property.
- Tariffs change mid-year: verify your electric utility's current net-billing export tariff and transformer capacity before signing contracts.
- NEC edition lags: state and city building departments enforce varying NEC editions (2017, 2020, 2023, or 2026) with local amendments.
- Not a substitute for on-site inspection: busbar pitting, ungrounded circuits, or loose neutral lugs require in-person testing by a licensed electrician.
Grid-Outage Resilience Priority
Focus on high-SAIDI utilities (>180 min/yr) and verify 120% busbar capacity for a 60 A hybrid battery or 200 A transfer switch.
Post-25D Cash Solar Payback Focus
With 0% federal 25D in 2026, prioritize higher-tariff markets above 18 c/kWh and avoid 20%-35% loan dealer fees.
EV Charging & Circuit Safety
Hardwire 48 A chargers on 6 AWG Cu THHN (75 C) rather than 6/2 NM-B, or step down to 32 A (40 A breaker) on tight 100 A panels.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers below rely on Census ACS 2023 housing age, Form EIA-861 reliability data, FEMA NRI hazard scores, and NFPA 70 NEC.
Why does pre-1980 county housing age matter for electrical upgrades?
Homes built before 1980 (and especially 1965–1973 aluminum branch wiring or pre-1960 ungrounded knob-and-tube homes) frequently hold 60 A or 100 A fuse/breaker panels that require NEC load calculations, AFCI/GFCI protection, or 200 A upgrades before EV charger or solar installation.
How do FEMA NRI hazard scores guide standby generator and surge decisions?
Counties scoring above 75 in FEMA Wind, Winter, Hurricane, or Lightning percentiles face materially higher multi-day blackout risk and surge transients, raising the value of NEC 230.67 Type 1/2 surge protectors and generator interlock/transfer switches.
Sources
- American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
- FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
- OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
- Building America & IECC Climate Zone County Classifications — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)