Advance Power holds 13 verified California Energy Commission (CEC) certifications including 13 module series (215–360W PV). Advance Power carries 13 module series ranging from 215 W to 360 W STC (median 270 W vs 385 W CEC fleet median; 14.6% median aperture efficiency, cell architecture Mono-c-Si, Multi-c-Si). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- Manufacturer
- Advance Power
- PV Module Series
- 13
- Listed Inverters
- 0
- Output Range
- 215–360W PV
How Do Advance Power Solar Specifications Compare Across the CEC Catalog?
Engineering benchmark profile summarizing how Advance Power photovoltaic panels and grid-support inverters compare against CEC industry medians and NEC 690 safety margins.
Homeowners evaluating Advance Power hardware for residential interconnection can verify exact DC and AC test data across 13 CEC records. Advance Power carries 13 module series ranging from 215 W to 360 W STC (median 270 W vs 385 W CEC fleet median; 14.6% median aperture efficiency, cell architecture Mono-c-Si, Multi-c-Si). Before finalizing string sizing, installers must adjust 25C Voc downward for regional record winter cold under NEC 690.7. No active CPSC electrical recalls match Advance Power in our federal recall archive as of 2026.
Which Advance Power PV Module Series Are CEC Certified? (13)
Filter certified Advance Power solar panels by series name, nameplate STC capacity, PTC output, open-circuit voltage, or conversion efficiency.
| Module Series | STC (W) | PTC (W) | Voc (V) | Eff (%) | Variants |
|---|---|---|---|---|---|
| Advance Power API-M360 | 360.0 | 330.2 | 47.56 | 18.56 | 5 |
| Advance Power API-M340 | 340.0 | 311.8 | 47.18 | 17.53 | 4 |
| Advance Power API-P330 | 330.0 | 298.0 | 46.08 | 17.01 | 3 |
| Advance Power API-P310 | 310.0 | 277.3 | 45.22 | 15.89 | 5 |
| Advance Power API-M285 | 285.0 | 254.0 | 44.21 | 14.61 | 4 |
| Advance Power API-P285 | 285.0 | 256.9 | 44.21 | 14.61 | 5 |
| Advance Power API-M270 | 270.0 | 240.3 | 44.64 | 13.84 | 2 |
| Advance Power API-P265 | 265.0 | 236.0 | 43.27 | 13.58 | 2 |
| Advance Power API-M255 | 255.0 | 228.2 | 37.68 | 15.57 | 3 |
| Advance Power API-P255 | 255.0 | 228.0 | 37.5 | 15.57 | 2 |
| Advance Power API-M235 | 235.0 | 209.8 | 37.5 | 14.35 | 5 |
| Advance Power API-P235 | 235.0 | 209.6 | 36.72 | 14.35 | 5 |
| Advance Power API-P215 | 215.0 | 191.3 | 36.0 | 13.13 | 3 |
What Are the Design Limits and Best-Fit Uses for Advance Power Solar Hardware?
Evaluate Advance Power CEC certifications (215–360W PV), winter voltage limits, and main panel 120% backfeed constraints before finalizing your equipment contract.
- Advance Power certifies only photovoltaic modules on this CEC list; installers must pair them with a separate UL 1741 SA/SB grid-support inverter verified for NEC 690.7 winter Voc.
- Constrained roofs: Advance Power's median module aperture efficiency (14.6%) sits below the 19.91% CEC fleet median, requiring slightly more square feet per kilowatt.
Advance Power Module + Third-Party Inverter
Pair Advance Power modules (215–360W PV) with microinverters or string inverters rated above local cold-weather Voc.
Unshaded Roofs & Ground Mounts
Focus on dollar-per-watt cash bids below $2.95/W since Section 25D residential tax credits expired after 2025.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Key verification checks for homeowners reviewing contractor quotes featuring Advance Power solar modules or inverters. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
How many Advance Power solar models are verified on the CEC list?
Our CEC archive indexes 13 Advance Power equipment records (13 module series and 0 inverter models) spanning 215–360W PV. Check local building department permit requirements for Advance Power before finalizing component orders.
What should homeowners check before approving Advance Power equipment on a solar quote?
Verify the exact CEC model string on your utility interconnection form, confirm cold-weather NEC 690.7 string Voc stays below inverter Vdcmax, and verify NEC 705.12 120% busbar capacity on your main breaker panel.
How efficient are Advance Power solar panels compared to CEC averages?
Across listed series, Advance Power modules show a median aperture efficiency of 14.6% versus 19.91% across all certified CEC photovoltaic panels. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Advance Power.
Sources
- CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- CPSC SaferProducts Recall Database (Panels, Breakers, Generators, Solar) — U.S. Consumer Product Safety Commission (CPSC), 2026-11 (retrieved 2026-11-23)