Skip to main content
WireAndSun
Calculators
CEC PV Module

Advance Power API-M270 — CEC Solar Module Specifications

Manufacturer: Advance Power Registry: CEC Verified Engineering Specification

Advance Power API-M270 is a 270.0 W STC (240.3 W PTC) Mono-c-Si solar module ranking #18,572 of 21,677 CEC listings (below all-CEC median; higher than 12.9% of peers). It delivers 13.84% efficiency, 44.64 V Voc at 25 C, and 49.7 V cold Voc at -10 C (12 panels max per 600 V string).

STC Wattage
270.0 W
PTC Wattage
240.3 W
Voc @ 25C
44.64 V
Efficiency
13.84%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Advance Power API-M270 Compare Against Peer CEC Listings?

CEC rank, roof space requirements, and NEC 690.7/690.8 limits for Advance Power API-M270 (Mono-c-Si) residential solar systems.

Advance Power API-M270 delivers 138.4 W/m2 (6.07 percentage points below 19.91% CEC median) and typical 89.0% PTC-to-STC thermal output (240.3 W real-world rating), placing it as a compact residential or specialty off-grid module useful on tight dormer roofs or battery cabins, though 8 kW requires 30 panels (630 sq ft). At -4 F (-20 C), string voltage climbs to 51.15 V per unit, capping 600 V circuits at 11 panels. Compare specs directly with Auxin Solar AXN6M612T270 (270.0 W).

Where Does Advance Power API-M270 Fall Across Listed CEC Models?

Comparison of Advance Power API-M270 (270.0 W STC) against all 21,677 California Energy Commission certified photovoltaic modules. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

STC Power Distribution Across 21,677 CEC Solar ModulesMarks where Advance Power API-M270 (270.0 W STC) stands relative to CEC photovoltaic modules. 18-79 W STC: 68 entries1879-140 W STC: 170 entries140-202 W STC: 413 entries202-263 W STC: 1,883 entries202263-325 W STC: 4,202 entries325-386 W STC: 4,219 entries386-448 W STC: 4,695 entries386448-509 W STC: 1,584 entries509-571 W STC: 2,290 entries571-632 W STC: 1,371 entries571632-694 W STC: 534 entries694-755 W STC: 248 entries694Median 385 W STCAdvance Power API-: 270.0 W

What Dataset Percentiles Define Advance Power API-M270?

Relative ranking of Advance Power API-M270 across nameplate watts, 89.0% PTC thermal ratio, and module aperture efficiency. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Advance Power API-M270 Engineering BenchmarksPercentile comparison of Advance Power API-M270 wattage, thermal retention, and efficiency. 0% (Low)50% Median100% (Top)STC Wattage270.0 WPTC/STC Retention89.0%Module Efficiency13.84%

What Do the Dataset Ranks Show for Advance Power API-M270?

Summary of Advance Power API-M270 output rank, 8 kW array size (30 panels), efficiency rating, and 600 V string limit.

Rank #18,572 / 21,677

270.0 W STC · Higher Than 12.9%

270.0 W STC (-115.0 W vs all-CEC median) vs 410.0 W Mono-c-Si median.

Eff #21,017

13.84% Aperture Efficiency

Power density 138.4 W/m2 (6.07 percentage points below 19.91% CEC median). PTC/STC ratio: 89.0% (rank #20,637).

NEC 690.7 Limit

12 Panels Max @ -10 C (600 V)

Cold Voc reaches 49.7 V at -10 C (596.4 V string) and 51.15 V at -20 C (11 max).

8 kW Reference Array

30 Panels = 8,100 W STC

Occupies 58.5 m2 (630 sq ft) producing 7,209 W PTC; NEC 690.8 OCPD floor is 12.7 A (15 A breaker).

NEC 690.7(A) Cold-Temperature Voc & 690.8 OCPD Formula

Voc_cold = 44.64 * (1 + (-0.324/100) * (-10 - 25)) = 49.7 V | OCPD = 1.56 * 8.14 = 12.7 A

Inputs from CEC Modules.csv for Advance Power API-M270: Voc=44.64 V, beta_Voc=-0.324%/C, Isc=8.14 A, STC=270.0 W, Area=1.951 m2.

Result: 12 panels max on 600 V (596.4 V); 30 panels for 8 kW (630 sq ft).

What Are the Published CEC Specifications for Advance Power API-M270?

Complete CEC test sheet for Advance Power API-M270 including Isc (8.14 A), Voc (44.64 V), and thermal temperature coefficients.

Official California Energy Commission (NREL SAM) test parameters for Advance Power API-M270.
ParameterMeasured / Listed ValueEngineering Significance
Nameplate Power (STC) 270.0 W Rated DC output under Standard Test Conditions (1000 W/m2, 25C cell)
Real-World Output (PTC) 240.3 W (89.0% STC) PVUSA Test Conditions rating used for utility interconnection
Open-Circuit Voltage (Voc) 44.64 V Primary cold-weather string sizing limit under NEC 690.7
Short-Circuit Current (Isc) 8.14 A Determines 156% (1.25x1.25) OCPD fuse/breaker sizing under NEC 690.8
Max Power Voltage / Current 36.21 V / 7.44 A Inverter MPPT operating window alignment
Voc Temp Coefficient (beta_Voc) -0.324 %/C Negative slope governing voltage rise below 25C
Module Efficiency & Area 13.84% (1.951 m2) Array roof footprint density
Cell Count & Technology 72 cells (Mono-c-Si) Monofacial backsheet

How Many Advance Power API-M270 Panels Build a 6 kW, 8 kW, or 10 kW Array?

Residential array count and annual electric bill savings at 18.54 c/kWh US avg vs. California tariffs using Advance Power API-M270.

Estimated panel count, roof square footage, and Year-1 bill offset across low, average, and high US utility tariffs (0% 25D).
Target ArrayPanelsActual DCRoof AreaUS Avg ($/yr)CA High ($/yr)
6 kW Class 23 6.21 kW 483 sq ft $1,554 $2,628
8 kW Class 30 8.1 kW 630 sq ft $2,027 $3,428
10 kW Class 38 10.26 kW 798 sq ft $2,568 $4,342

Which Sibling Wattage & Trim Variants Belong to This Advance Power Series?

Related Advance Power power steps and black/silver trims consolidated into this Advance Power API-M270 series guide. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Sibling CEC listings grouped into the Advance Power API-M270 wattage tier to avoid duplicate 5W/trim datasheets.
Model VariantSTC (W)PTC (W)Voc (V)Vmp (V)Eff (%)
Advance Power API-M265 265.0 W 235.7 W 44.42 V 36.0 V 13.58%
Advance Power API-M270 270.0 W 240.3 W 44.64 V 36.21 V 13.84%

How Many Advance Power API-M270 Modules Fit in a Cold-Weather String?

Verify freezing-morning voltage rise for Advance Power API-M270 (44.64 V STC) before wiring 600 V or 1,000 V strings.

Computed from Voc=44.64V and beta_Voc=-0.324%/C across design ambient temperatures.
Ambient Min TempCold Voc / PanelMax Panels (600 V)600 V String VocMax Panels (1000 V)
-20 C (-4 F) 51.15 V 11 panels 562.6 V 19 panels
-10 C (14 F) 49.7 V 12 panels 596.4 V 20 panels
0 C (32 F) 48.26 V 12 panels 579.1 V 20 panels
25 C (77 F STC) 44.64 V 13 panels 580.3 V 22 panels

Which Cross-Brand Solar Modules Compare Closest to Advance Power API-M270?

Four comparable CEC modules such as Auxin Solar AXN6M612T270 (270.0 W) for side-by-side solar quote checks. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Nearest CEC-listed competing brands by STC power and open-circuit voltage.
Alternative ModuleSTC (W)Delta vs ThisVoc (V)Eff (%)PTC/STC
Auxin Solar AXN6M612T270
Auxin Solar
270.0 W Tie (0 W) 44.64 V 13.84% 89.0%
AXITEC AC-270P/156-72S
AXITEC
270.0 W Tie (0 W) 44.18 V 13.94% 89.9%
Centrosolar America DP72 270
Centrosolar America
270.0 W Tie (0 W) 43.85 V 13.89% 88.4%
Anhui Rinengzhongtian Semiconductor Development QJM270-72
Anhui Rinengzhongtian Semiconductor Development
270.0 W Tie (0 W) 43.67 V 13.92% 89.6%
What to Check & Best-Fit Scenarios

What Are the Design Limits and Best-Fit Uses for Advance Power API-M270?

Evaluate Advance Power API-M270 (270.0 W STC, 44.64 V Voc) against your roof geometry, winter climate, and inverter voltage ceiling before finalizing bids.

  • Winter overvoltage boundary: at -20 C (-4 F), Advance Power API-M270 reaches 51.15 V per panel—exceeding 11 panels in series voids 600 V inverter warranties.
  • Footprint constraint: 30 panels for an 8 kW build require 630 sq ft of unshaded roof plane — useful on tight dormer roofs or battery cabins, though 8 kW requires 30 panels (630 sq ft).
  • 2026 tax credit baseline: cash residential installs of Advance Power API-M270 carry 0% federal 25D credit after 2025-12-31, making 18.54 c/kWh+ utility avoidance key.

Advance Power API-M270 8 kW Residential Fit

Needs 30 modules (630 sq ft) with a 15 A string OCPD, offsetting ~$2,027/yr at US average tariffs.

Cold-Climate String Design (-10 C / -20 C)

Cap 600 V series strings at 12 panels (-10 C) or 11 panels (-20 C), or compare Auxin Solar AXN6M612T270.

Bifacial / High-Heat Roof Check

Monofacial backsheet sealing targets flush dark shingle rooftop mounts. Real-world output tracks 240.3 W PTC.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Technical answers for Advance Power API-M270 by Advance Power grounded in CEC test data and NEC 690.7/690.8 limits.

How many Advance Power API-M270 panels fit on a 600 V winter solar string?

At -10 C (14 F), Advance Power API-M270 cold Voc rises from 44.64 V to 49.7 V (beta_Voc -0.324%/C), capping a 600 V string at 12 panels (596.4 V).

How much roof area does an 8 kW array of Advance Power API-M270 need?

An 8 kW DC system uses 30 Advance Power API-M270 modules (8,100 W STC / 7,209 W PTC), covering roughly 630 sq ft and saving ~$2,027/yr at 18.54 c/kWh.

How does Advance Power API-M270 compare against Auxin Solar AXN6M612T270?

Advance Power API-M270 outputs 270.0 W STC (44.64 V Voc, rank #18,572 of 21,677), while Auxin Solar AXN6M612T270 delivers 270.0 W STC; both comply with 2026 NEC 690.7 string sizing rules.

Sources

  1. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.