ABB: PVS-166-TL-POWER-MODULE-2-US {800V} outputs 165,954 W AC at 800 V, 3-phase (119.8 A continuous, 150 A OCPD), ranking #210 of 2,343 CEC inverters at 98.26% efficiency with a 850-1,200 V MPPT window and 1,200 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- AC Output (Paco)
- 165,954 W
- AC Voltage
- 800 V, 3-phase
- Min PV Breaker
- 150 A (1/0 AWG Cu)
- CEC Efficiency
- 98.26%
How Does ABB: PVS-166-TL-POWER-MODULE-2-US {800V} Compare Against Peer CEC Listings?
Breaker sizing (150 A), 1/0 AWG Cu wire rules, and DC input limits for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}.
Classified as a grid-tied PV inverter (listed since 2020-09-01), ABB: PVS-166-TL-POWER-MODULE-2-US {800V} requires 149.8 A design capacity -> 150 A breaker using 1/0 AWG Cu copper at 75 C terminals. Weighted efficiency sits at 98.26% (+1.44 pts vs overall CEC median) across 2,343 CEC models, while commercial 800 v, 3-phase switchgear interconnection uses 1,200a bus / 1,200a main (800v) or nec 705.11 supply-side tap.
Where Does ABB: PVS-166-TL-POWER-MODULE-2-US {800V} Fall Across Listed CEC Models?
Output power comparison showing where ABB: PVS-166-TL-POWER-MODULE-2-US {800V} sits among all 2,343 CEC-listed grid-support inverters. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
What Dataset Percentiles Define ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Relative ranking of ABB: PVS-166-TL-POWER-MODULE-2-US {800V} on continuous AC power, CEC weighted efficiency, and OCPD breaker current. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
What Do the Dataset Ranks Show for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Snapshot of ABB: PVS-166-TL-POWER-MODULE-2-US {800V} efficiency rank (#210), OCPD breaker size, MPPT span, and busbar verdict. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
98.26% CEC Weighted Efficiency
-0.04 pts vs the 98.3% 800 V median; overall power rank #265 (165,954 W, top 11.4%; higher than 88.6% of peers).
150 A Required Backfeed OCPD
125% x 119.8 A = 149.8 A -> 150 A standard OCPD using 1/0 AWG Cu (75 C).
850 V - 1,200 V (Max 1,200 V DC)
Tracking span of 350.0 V; listed since 2020-09-01 (grid-tied PV inverter).
Supply-Side Tap (705.11) / Dedicated Switchboard
Evaluated for 800 V, 3-phase switchgear (200A Bus / 200A Main (800V) to 1,200A Bus / 1,200A Main (800V)) under NEC 705.12 / 705.11.
NEC 705.12 Backfeed OCPD & 120% Busbar Formula
I_cont = 165954.0W / 800 V 3-phase -> 119.8 A | Breaker >= 1.25 * 119.8 = 149.8 A -> 150 A
CEC Inverters.csv for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}: Paco=165954.0 W, Vac=800 V, Vdcmax=1200.0 V, Eff=98.26%.
Result: Min 150 A breaker & 1/0 AWG Cu (75 C); 1,200A Bus / 1,200A Main (800V): PASS (120% Commercial Busbar).
What Are the Published CEC Specifications for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Complete California Energy Commission grid-support inverter ratings and hybrid battery capabilities for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
| Parameter | Measured / Listed Value | Engineering Significance |
|---|---|---|
| Max Continuous AC Power (Paco) | 165,954 W | Determines required backfeed OCPD size via 125% continuous rule |
| Nominal AC Voltage (Vac) | 800 V, 3-phase | 240V split-phase residential vs. 208V/480V/MV commercial |
| Max DC Input Voltage (Vdcmax) | 1,200 V | Hard ceiling for cold-weather PV string Voc under NEC 690.7 |
| MPPT Operating Range | 850 V - 1,200 V | Optimal DC string Vmp window for full power harvest |
| Max Input DC Current (Idcmax) | 153.534 A | Used to verify parallel string combiner limits |
| CEC Weighted Efficiency | 98.26% | Calculated AC/DC conversion ratio from CEC test protocol |
| CEC Listing Date & Hybrid | 2020-09-01 / Hybrid: No (Grid-Tied PV) | Utility interconnection approval metadata |
What Switchgear Limits Apply to ABB: PVS-166-TL-POWER-MODULE-2-US {800V} (800 V, 3-phase)?
NEC 705.12(B)(3)(2) backfeed compliance table for ABB: PVS-166-TL-POWER-MODULE-2-US {800V} at 800 V, 3-phase. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
| Switchboard / Interconnect | 120% Max Backfeed | Required PV OCPD | Compliance Verdict |
|---|---|---|---|
| 200A Bus / 200A Main (800V) | 40 A | 150 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 400A Bus / 400A Main (800V) | 80 A | 150 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 600A Bus / 600A Main (800V) | 120 A | 150 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 800A Bus / 800A Main (800V) | 160 A | 150 A | PASS (120% Commercial Busbar) |
| 1,200A Bus / 1,200A Main (800V) | 240 A | 150 A | PASS (120% Commercial Busbar) |
Which CEC PV Module Strings Pair With ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Minimum and maximum series solar module strings fitting ABB: PVS-166-TL-POWER-MODULE-2-US {800V} MPPT and 1,200 V limits. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
| CEC Module | STC (W) | -10 C Voc | Valid String Range | Max String DC |
|---|---|---|---|---|
| AXITEC AC-590TGB/144TS | 590.0 W | 56.24 V | 20 to 21 panels | 12.39 kW |
| Aptos Solar Technology LLC DNA-108-MFN10-440W | 440.0 W | 42.15 V | 26 to 28 panels | 12.32 kW |
| Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF | 425.0 W | 44.75 V | 25 to 26 panels | 11.05 kW |
| Chint New Energy Technology Co Ltd CHSM72M(DG)/F-BH-515 | 515.0 W | 53.76 V | 21 to 22 panels | 11.33 kW |
Which Competing Grid-Support Inverters Compare to ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Peer 800 V, 3-phase CEC inverters near 165,954 W AC output such as Chint Power Systems America: CPS ECB200KTL/US-800 {800V}.
| Alternative Inverter | AC Output | Delta | Vac | Max DC | CEC Eff |
|---|---|---|---|---|---|
| Chint Power Systems America: CPS ECB200KTL/US-800 {800V} Chint Power Systems America |
200,000 W | +34046 W | 800.0 V | 1500.0 V | 97.55% |
| Sungrow Power Supply Co Ltd: SG250HX-US {800V} Sungrow Power Supply Co Ltd |
226,997 W | +61043 W | 800.0 V | 1300.0 V | 98.52% |
| Huawei Technologies Co Ltd: SUN2000-100KTL-USH0 {800V} Huawei Technologies Co Ltd |
100,000 W | -65954 W | 800.0 V | 1200.0 V | 98.57% |
| Ginlong Technologies Co Ltd: Solis-255K-EHV-5G-US-PLUS {800V} Ginlong Technologies Co Ltd |
238,706 W | +72752 W | 800.0 V | 1300.0 V | 98.26% |
What Are the Interconnection Limits and Best-Fit Uses for ABB: PVS-166-TL-POWER-MODULE-2-US {800V}?
Check ABB: PVS-166-TL-POWER-MODULE-2-US {800V} (165,954 W AC, 150 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.
- Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
- Busbar 120% limit: Commercial 800 V, 3-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (800V) or NEC 705.11 supply-side tap.
- Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 1,200 V DC on ABB: PVS-166-TL-POWER-MODULE-2-US {800V}.
ABB: PVS-166-TL-POWER-MODULE-2-US {800V} Panel & Wire Spec
Size 75 C copper conductors at 1/0 AWG Cu on a 150 A OCPD breaker (119.8 A continuous).
Alternative Inverter Comparison
Compare efficiency (98.26%) and MPPT window (850-1,200 V) directly against Chint Power Systems America: CPS ECB200KTL/US-800 {800V} (200,000 W).
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for ABB: PVS-166-TL-POWER-MODULE-2-US {800V} by ABB covering breaker sizing, MPPT limits, and 800 V, 3-phase interconnection. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
What breaker and wire size does ABB: PVS-166-TL-POWER-MODULE-2-US {800V} require?
At 165,954 W continuous AC (800 V, 3-phase), continuous current is 119.8 A; 125% NEC 690.8/705.12 sizing requires a 150 A breaker and 1/0 AWG Cu (75 C) wire.
What commercial switchgear or feeder sizing does ABB: PVS-166-TL-POWER-MODULE-2-US {800V} require?
At 165,954 W AC and 800 V, 3-phase, continuous line current is 119.8 A, requiring a 150 A OCPD and 1,200A Bus / 1,200A Main (800V) or NEC 705.11 interconnection.
How does ABB: PVS-166-TL-POWER-MODULE-2-US {800V} compare to Chint Power Systems America: CPS ECB200KTL/US-800 {800V}?
ABB: PVS-166-TL-POWER-MODULE-2-US {800V} delivers 165,954 W AC at 98.26% CEC efficiency with a 1,200 V DC ceiling, while Chint Power Systems America: CPS ECB200KTL/US-800 {800V} outputs 200,000 W at 800 V, 3-phase.
Sources
- CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)