Skip to main content
WireAndSun
Calculators
CEC PV Module

Heliene 72P285 — CEC Solar Module Specifications

Manufacturer: Heliene Registry: CEC Verified Engineering Specification

Heliene 72P285 is a 285.0 W STC (253.2 W PTC) Multi-c-Si solar module ranking #17,598 of 21,677 CEC listings (below all-CEC median; higher than 17.3% of peers). It delivers 15.51% efficiency, 44.79 V Voc at 25 C, and 50.06 V cold Voc at -10 C (11 panels max per 600 V string).

STC Wattage
285.0 W
PTC Wattage
253.2 W
Voc @ 25C
44.79 V
Efficiency
15.51%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Heliene 72P285 Compare Against Peer CEC Listings?

Solar engineering breakdown for Heliene 72P285: PTC thermal retention, roof footprint, and cold Voc string bounds. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Across 1,407 Multi-c-Si listings from Heliene and peers, Heliene 72P285 stands 6.2 W above the 278.8 W Multi-c-Si median and typical 88.8% PTC-to-STC thermal output (253.2 W real-world rating). Sizing 6 kW (22 panels) to 10 kW (36 panels) yields $1,569-$2,568/yr in baseline US bill offset. Mid-range 44.79 V open-circuit voltage allows up to 11 panels per 600 V string at 14 F.

Where Does Heliene 72P285 Fall Across Listed CEC Models?

Distribution marker showing Heliene 72P285 (285.0 W) relative to the 385.0 W all-CEC solar panel median. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

STC Power Distribution Across 21,677 CEC Solar ModulesMarks where Heliene 72P285 (285.0 W STC) stands relative to CEC photovoltaic modules. 18-79 W STC: 68 entries1879-140 W STC: 170 entries140-202 W STC: 413 entries202-263 W STC: 1,883 entries202263-325 W STC: 4,202 entries325-386 W STC: 4,219 entries386-448 W STC: 4,695 entries386448-509 W STC: 1,584 entries509-571 W STC: 2,290 entries571-632 W STC: 1,371 entries571632-694 W STC: 534 entries694-755 W STC: 248 entries694Median 385 W STCHeliene 72P285: 285.0 W

What Dataset Percentiles Define Heliene 72P285?

Dataset percentiles tracking Heliene 72P285 power output, thermal retention ratio, and aperture efficiency against 21,677 models. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Heliene 72P285 Engineering BenchmarksPercentile comparison of Heliene 72P285 wattage, thermal retention, and efficiency. 0% (Low)50% Median100% (Top)STC Wattage285.0 WPTC/STC Retention88.8%Module Efficiency15.51%

What Do the Dataset Ranks Show for Heliene 72P285?

Benchmark highlights for Heliene 72P285 covering STC output, efficiency, 8 kW footprint, and OCPD breaker size. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Rank #17,598 / 21,677

285.0 W STC · Higher Than 17.3%

285.0 W STC (-100.0 W vs all-CEC median) vs 278.8 W Multi-c-Si median.

Eff #18,904

15.51% Aperture Efficiency

Power density 155.1 W/m2 (4.40 percentage points below 19.91% CEC median). PTC/STC ratio: 88.8% (rank #20,967).

NEC 690.7 Limit

11 Panels Max @ -10 C (600 V)

Cold Voc reaches 50.06 V at -10 C (550.7 V string) and 51.56 V at -20 C (11 max).

8 kW Reference Array

29 Panels = 8,265 W STC

Occupies 53.3 m2 (574 sq ft) producing 7,343 W PTC; NEC 690.8 OCPD floor is 13.12 A (15 A breaker).

NEC 690.7(A) Cold-Temperature Voc & 690.8 OCPD Formula

Voc_cold = 44.79 * (1 + (-0.336/100) * (-10 - 25)) = 50.06 V | OCPD = 1.56 * 8.41 = 13.12 A

Inputs from CEC Modules.csv for Heliene 72P285: Voc=44.79 V, beta_Voc=-0.336%/C, Isc=8.41 A, STC=285.0 W, Area=1.838 m2.

Result: 11 panels max on 600 V (550.7 V); 29 panels for 8 kW (574 sq ft).

What Are the Published CEC Specifications for Heliene 72P285?

Official CEC datasheet figures for Heliene 72P285 (Multi-c-Si) used in utility interconnection and permit reviews. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Official California Energy Commission (NREL SAM) test parameters for Heliene 72P285.
ParameterMeasured / Listed ValueEngineering Significance
Nameplate Power (STC) 285.0 W Rated DC output under Standard Test Conditions (1000 W/m2, 25C cell)
Real-World Output (PTC) 253.2 W (88.8% STC) PVUSA Test Conditions rating used for utility interconnection
Open-Circuit Voltage (Voc) 44.79 V Primary cold-weather string sizing limit under NEC 690.7
Short-Circuit Current (Isc) 8.41 A Determines 156% (1.25x1.25) OCPD fuse/breaker sizing under NEC 690.8
Max Power Voltage / Current 38.61 V / 7.82 A Inverter MPPT operating window alignment
Voc Temp Coefficient (beta_Voc) -0.336 %/C Negative slope governing voltage rise below 25C
Module Efficiency & Area 15.51% (1.838 m2) Array roof footprint density
Cell Count & Technology 72 cells (Multi-c-Si) Monofacial backsheet

How Many Heliene 72P285 Panels Build a 6 kW, 8 kW, or 10 kW Array?

How many Heliene 72P285 modules and square feet are required for 6 kW, 8 kW, and 10 kW home solar arrays.

Estimated panel count, roof square footage, and Year-1 bill offset across low, average, and high US utility tariffs (0% 25D).
Target ArrayPanelsActual DCRoof AreaUS Avg ($/yr)CA High ($/yr)
6 kW Class 22 6.27 kW 435 sq ft $1,569 $2,654
8 kW Class 29 8.27 kW 574 sq ft $2,070 $3,500
10 kW Class 36 10.26 kW 712 sq ft $2,568 $4,342

Which Sibling Wattage & Trim Variants Belong to This Heliene Series?

Consolidated Heliene wattage variants sharing the Heliene 72P285 mechanical and cell layout. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Sibling CEC listings grouped into the Heliene 72P285 wattage tier to avoid duplicate 5W/trim datasheets.
Model VariantSTC (W)PTC (W)Voc (V)Vmp (V)Eff (%)
Heliene 72P275 275.0 W 243.2 W 43.36 V 35.25 V 14.09%
Heliene 72P285 285.0 W 253.2 W 44.79 V 38.61 V 15.51%
Heliene 72P290 290.0 W 257.8 W 44.92 V 38.73 V 15.78%

How Many Heliene 72P285 Modules Fit in a Cold-Weather String?

NEC 690.7(A) winter string table preventing overvoltage trips on Heliene 72P285 (50.06 V at 14 F). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Computed from Voc=44.79V and beta_Voc=-0.336%/C across design ambient temperatures.
Ambient Min TempCold Voc / PanelMax Panels (600 V)600 V String VocMax Panels (1000 V)
-20 C (-4 F) 51.56 V 11 panels 567.2 V 19 panels
-10 C (14 F) 50.06 V 11 panels 550.7 V 19 panels
0 C (32 F) 48.55 V 12 panels 582.6 V 20 panels
25 C (77 F STC) 44.79 V 13 panels 582.3 V 22 panels

Which Cross-Brand Solar Modules Compare Closest to Heliene 72P285?

Competing CEC solar panels closest to Heliene 72P285 in nameplate wattage and Voc, starting with Gintung Energy ASEC-285G6S.

Nearest CEC-listed competing brands by STC power and open-circuit voltage.
Alternative ModuleSTC (W)Delta vs ThisVoc (V)Eff (%)PTC/STC
Gintung Energy ASEC-285G6S
Gintung Energy
285.0 W Tie (0 W) 44.69 V 14.57% 89.7%
Gintung Energy ASEC-285G6M
Gintung Energy
285.0 W Tie (0 W) 44.53 V 14.57% 89.5%
AXITEC AC-285P/156-72S
AXITEC
285.0 W Tie (0 W) 44.51 V 14.72% 90.0%
Centrosolar America DP72 285
Centrosolar America
285.0 W Tie (0 W) 44.32 V 14.66% 88.5%
What to Check & Best-Fit Scenarios

What Are the Design Limits and Best-Fit Uses for Heliene 72P285?

Evaluate Heliene 72P285 (285.0 W STC, 44.79 V Voc) against your roof geometry, winter climate, and inverter voltage ceiling before finalizing bids.

  • Winter overvoltage boundary: at -20 C (-4 F), Heliene 72P285 reaches 51.56 V per panel—exceeding 11 panels in series voids 600 V inverter warranties.
  • Footprint constraint: 29 panels for an 8 kW build require 574 sq ft of unshaded roof plane — useful on tight dormer roofs or battery cabins, though 8 kW requires 29 panels (574 sq ft).
  • 2026 tax credit baseline: cash residential installs of Heliene 72P285 carry 0% federal 25D credit after 2025-12-31, making 18.54 c/kWh+ utility avoidance key.

Heliene 72P285 8 kW Residential Fit

Needs 29 modules (574 sq ft) with a 15 A string OCPD, offsetting ~$2,070/yr at US average tariffs.

Cold-Climate String Design (-10 C / -20 C)

Cap 600 V series strings at 11 panels (-10 C) or 11 panels (-20 C), or compare Gintung Energy ASEC-285G6S.

Bifacial / High-Heat Roof Check

Monofacial backsheet sealing targets flush dark shingle rooftop mounts. Real-world output tracks 253.2 W PTC.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Technical answers for Heliene 72P285 by Heliene grounded in CEC test data and NEC 690.7/690.8 limits. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

What fuse or breaker size does NEC 690.8 require for Heliene 72P285?

Multiplying Heliene 72P285's 8.41 A short-circuit current by 1.56 equals 13.12 A minimum ampacity, requiring at least a 15 A overcurrent fuse or breaker. Check local building department permit requirements for Heliene 72P285 before finalizing component orders.

Can Heliene 72P285 pair with microinverters instead of a 600 V string inverter?

Yes—if the microinverter DC input ceiling exceeds 50.06 V cold Voc at 14 F and handles 8.41 A Isc; string inverters cap Heliene 72P285 at 11 panels on 600 V.

Is Heliene 72P285 eligible for the 30% federal 25D solar credit in 2026?

No. Federal Section 25D expired December 31, 2025 under Public Law 119-21, so 2026 cash installs of Heliene 72P285 rely on utility bill offset (~$2,070/yr at 8 kW) rather than 25D.

Sources

  1. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.