Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

Altenergy Power System Inc: ELS-114 {240V} — CEC Inverter Specifications

Manufacturer: Altenergy Power System Inc Registry: CEC Verified Engineering Specification

Altenergy Power System Inc: ELS-114 {240V} outputs 11,415 W AC at 240 V (47.6 A continuous, 60 A OCPD), ranking #2,328 of 2,343 CEC inverters at 93.08% efficiency with a 51-60 V MPPT window and 60 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
11,415 W
AC Voltage
240 V
Min PV Breaker
60 A (6 AWG Cu)
CEC Efficiency
93.08%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Altenergy Power System Inc: ELS-114 {240V} Compare Against Peer CEC Listings?

CEC efficiency rank (#2,328), 51-60 V MPPT tracking, and panel fit for Altenergy Power System Inc: ELS-114 {240V}.

Operating at 240 V, Altenergy Power System Inc: ELS-114 {240V} converts DC array energy at 93.08% CEC weighted efficiency (below overall CEC median; higher than 0.6% of peers) with a 60 V max DC input and 218.991 A max input current for NEC 690.7 string safety. Compare this 11,415 W grid-tied PV inverter directly with Chint Power Systems America: CPS ECH114KTL/US {240V} (11,360 W). Its 60 A backfeed breaker exceeds a 200A/200A panel's 40 A ceiling, requiring a 175 A main derate, 225 A busbar, or NEC 705.11 tap.

Where Does Altenergy Power System Inc: ELS-114 {240V} Fall Across Listed CEC Models?

CEC inverter wattage histogram highlighting Altenergy Power System Inc: ELS-114 {240V} at 11,415 W continuous AC output. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where Altenergy Power System Inc: ELS-114 {240V} (11,415 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACAltenergy Power Sy: 11,415 W

What Dataset Percentiles Define Altenergy Power System Inc: ELS-114 {240V}?

Dataset percentiles comparing Altenergy Power System Inc: ELS-114 {240V} against 2,343 certified grid-support inverters nationwide. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Altenergy Power System Inc: ELS-114 {240V} Technical ThresholdsPercentile comparison for Altenergy Power System Inc: ELS-114 {240V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output11,415 WCEC Efficiency93.08%Backfeed Breaker60 A

What Do the Dataset Ranks Show for Altenergy Power System Inc: ELS-114 {240V}?

Engineering highlights for Altenergy Power System Inc: ELS-114 {240V} covering efficiency, 6 AWG Cu feeder, and panel compatibility.

Eff #2,328 / 2,343

93.08% CEC Weighted Efficiency

-3.60 pts vs the 96.68% 240 V median; overall power rank #775 (11,415 W, top 33.1%; higher than 66.9% of peers).

NEC 705.12 Check

60 A Required Backfeed OCPD

125% x 47.6 A = 59.5 A -> 60 A standard OCPD using 6 AWG Cu (75 C).

MPPT Window

51 V - 60 V (Max 60 V DC)

Tracking span of 9.0 V; listed since 2025-01-13 (grid-tied PV inverter).

Panel Fit (240V)

Needs Derate / Tap 705.11

200A/200A panel allows 40A PV backfeed; 200A/175A derate allows 65A; 225A/200A allows 70A.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 11415.0W / 240 V -> 47.6 A | Breaker >= 1.25 * 47.6 = 59.5 A -> 60 A

CEC Inverters.csv for Altenergy Power System Inc: ELS-114 {240V}: Paco=11415.0 W, Vac=240 V, Vdcmax=60.0 V, Eff=93.08%.

Result: Min 60 A breaker & 6 AWG Cu (75 C); 200A Bus / 200A Main: Needs Derate / Tap 705.11.

What Are the Published CEC Specifications for Altenergy Power System Inc: ELS-114 {240V}?

California Energy Commission Solar Equipment List parameters for Altenergy Power System Inc: ELS-114 {240V} (grid-tied PV inverter) interconnection.

Official California Energy Commission (NREL SAM) test parameters for Altenergy Power System Inc: ELS-114 {240V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 11,415 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 240 V 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 60 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 51 V - 60 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 218.991 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 93.08% Calculated AC/DC conversion ratio from CEC test protocol
CEC Listing Date & Hybrid 2025-01-13 / Hybrid: No (Grid-Tied PV) Utility interconnection approval metadata

Can a Residential Panel Meet 120% Busbar Limits for Altenergy Power System Inc: ELS-114 {240V}?

Panelboard and switchgear backfeed allowances for Altenergy Power System Inc: ELS-114 {240V} (60 A OCPD). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Evaluates Altenergy Power System Inc: ELS-114 {240V} (60 A required OCPD at 240 V) across standard distribution busbars.
Panel Configuration120% Max BackfeedRequired PV OCPDCompliance Verdict
100A Bus / 100A Main 20 A 60 A Needs Derate / Tap 705.11
150A Bus / 150A Main 30 A 60 A Needs Derate / Tap 705.11
200A Bus / 200A Main 40 A 60 A Needs Derate / Tap 705.11
200A Bus / 175A Main 65 A 60 A PASS (120% Rule)
225A Bus / 200A Main 70 A 60 A PASS (120% Rule)

Which CEC PV Module Strings Pair With Altenergy Power System Inc: ELS-114 {240V}?

Representative PV panel pairings verified under NEC 690.7 cold Voc for Altenergy Power System Inc: ELS-114 {240V}. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Sampled CEC PV modules aligned within 51.0-60.0 V MPPT and 60.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
AXITEC AC-590TGB/144TS 590.0 W 56.24 V 1 panel (micro/module) 0.59 kW
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 1 panel (micro/module) 0.44 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 1 panel (micro/module) 0.42 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 1 panel (micro/module) 0.2 kW

Which Competing Grid-Support Inverters Compare to Altenergy Power System Inc: ELS-114 {240V}?

Four alternative CEC inverters matched to Altenergy Power System Inc: ELS-114 {240V} (11,415 W AC), led by Chint Power Systems America: CPS ECH114KTL/US {240V}.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Chint Power Systems America: CPS ECH114KTL/US {240V}
Chint Power Systems America
11,360 W -55 W 240.0 V 480.0 V 96.53%
Dyness Digital Energy Technology Co LTD: TX114K-HM {240V}
Dyness Digital Energy Technology Co LTD
11,498 W +83 W 240.0 V 500.0 V 96.41%
Dyness Digital Energy Technology Co LTD: TX114K-AM {240V}
Dyness Digital Energy Technology Co LTD
11,519 W +104 W 240.0 V 490.0 V 96.21%
Base Power Inc: MIN 11400TL-XH-US {240V}
Base Power Inc
11,520 W +105 W 240.0 V 480.0 V 97.76%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for Altenergy Power System Inc: ELS-114 {240V}?

Check Altenergy Power System Inc: ELS-114 {240V} (11,415 W AC, 60 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Its 60 A backfeed breaker exceeds a 200A/200A panel's 40 A ceiling, requiring a 175 A main derate, 225 A busbar, or NEC 705.11 tap.
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 60 V DC on Altenergy Power System Inc: ELS-114 {240V}.

Altenergy Power System Inc: ELS-114 {240V} Panel & Wire Spec

Size 75 C copper conductors at 6 AWG Cu on a 60 A OCPD breaker (47.6 A continuous).

Alternative Inverter Comparison

Compare efficiency (93.08%) and MPPT window (51-60 V) directly against Chint Power Systems America: CPS ECH114KTL/US {240V} (11,360 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Altenergy Power System Inc: ELS-114 {240V} by Altenergy Power System Inc covering breaker sizing, MPPT limits, and 240 V interconnection.

What breaker and wire size does Altenergy Power System Inc: ELS-114 {240V} require?

At 11,415 W continuous AC (240 V), continuous current is 47.6 A; 125% NEC 690.8/705.12 sizing requires a 60 A breaker and 6 AWG Cu (75 C) wire.

Does Altenergy Power System Inc: ELS-114 {240V} fit a 200 A main panel under the 120% busbar rule?

A 200 A busbar with a 200 A main allows 40 A of solar backfeed. Requiring 60 A at 240 V means Needs Derate / Tap 705.11.

How does Altenergy Power System Inc: ELS-114 {240V} compare to Chint Power Systems America: CPS ECH114KTL/US {240V}?

Altenergy Power System Inc: ELS-114 {240V} delivers 11,415 W AC at 93.08% CEC efficiency with a 60 V DC ceiling, while Chint Power Systems America: CPS ECH114KTL/US {240V} outputs 11,360 W at 240 V.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.