Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} — CEC Inverter Specifications

Manufacturer: SPITZER ENERGY COMPANY Registry: CEC Verified Engineering Specification

SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} outputs 5,020 W AC at 208 V, commercial single-phase (24.1 A continuous, 35 A OCPD), ranking #1,333 of 2,343 CEC inverters at 96.62% efficiency with a 200-480 V MPPT window and 480 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
5,020 W
AC Voltage
208 V, commercial single-phase
Min PV Breaker
35 A (8 AWG Cu)
CEC Efficiency
96.62%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} Compare Against Peer CEC Listings?

How SPITZER ENERGY COMPANY SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} compares on 96.62% efficiency, MPPT span, and 120% busbar interconnection.

With a 200-480 V MPPT tracking band and 480 V DC ceiling, SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} handles 5,020 W continuous AC (20 W above the 5,000 W 208 V median). Commercial 208 V, commercial single-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (208V) or NEC 705.11 supply-side tap. Installers comparing SPITZER ENERGY COMPANY against Delta Electronics: E6_BDI {208V} (5,025 W) should verify whether listed since 2025-01-13 grid-support firmware meets local IEEE 1547 utility rules.

Where Does SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} Fall Across Listed CEC Models?

Position of SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (5,020 W AC) relative to the 7,680 W CEC median inverter.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (5,020 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACSPITZER ENERGY COM: 5,020 W

What Dataset Percentiles Define SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Percentile placement of SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} across AC power class, conversion efficiency, and backfeed breaker size.

SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} Technical ThresholdsPercentile comparison for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output5,020 WCEC Efficiency96.62%Backfeed Breaker35 A

What Do the Dataset Ranks Show for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Primary electrical sizing limits, efficiency ranks, and NEC 705.12 / 690.7 thresholds for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}.

Eff #1,333 / 2,343

96.62% CEC Weighted Efficiency

+0.21 pts vs the 96.41% 208 V median; overall power rank #1,497 (5,020 W, below CEC median; higher than 35.9% of peers).

NEC 705.12 Check

35 A Required Backfeed OCPD

125% x 24.1 A = 30.1 A -> 35 A standard OCPD using 8 AWG Cu (75 C).

MPPT Window

200 V - 480 V (Max 480 V DC)

Tracking span of 280.0 V; listed since 2025-01-13 (hybrid battery-capable inverter).

Commercial / 3-Phase Fit

PASS (120% Commercial Busbar)

Evaluated for 208 V, commercial single-phase switchgear (200A Bus / 200A Main (208V) to 1,200A Bus / 1,200A Main (208V)) under NEC 705.12 / 705.11.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 5020.0W / 208 V -> 24.1 A | Breaker >= 1.25 * 24.1 = 30.1 A -> 35 A

CEC Inverters.csv for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}: Paco=5020.0 W, Vac=208 V, Vdcmax=480.0 V, Eff=96.62%.

Result: Min 35 A breaker & 8 AWG Cu (75 C); 1,200A Bus / 1,200A Main (208V): PASS (120% Commercial Busbar).

What Are the Published CEC Specifications for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Official California Energy Commission electrical test parameters, AC voltage, and DC limits for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}.

Official California Energy Commission (NREL SAM) test parameters for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 5,020 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 208 V, commercial single-phase 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 480 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 200 V - 480 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 14.4317 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 96.62% Calculated AC/DC conversion ratio from CEC test protocol
CEC Listing Date & Hybrid 2025-01-13 / Hybrid: Yes (Battery Capable) Utility interconnection approval metadata

What Switchgear Limits Apply to SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (208 V, commercial single-phase)?

Check whether SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (35 A breaker) fits without main breaker derate or supply-side taps.

Evaluates SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (35 A required OCPD at 208 V, commercial single-phase) across standard distribution busbars.
Switchboard / Interconnect120% Max BackfeedRequired PV OCPDCompliance Verdict
200A Bus / 200A Main (208V) 40 A 35 A PASS (120% Commercial Busbar)
400A Bus / 400A Main (208V) 80 A 35 A PASS (120% Commercial Busbar)
600A Bus / 600A Main (208V) 120 A 35 A PASS (120% Commercial Busbar)
800A Bus / 800A Main (208V) 160 A 35 A PASS (120% Commercial Busbar)
1,200A Bus / 1,200A Main (208V) 240 A 35 A PASS (120% Commercial Busbar)

Which CEC PV Module Strings Pair With SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Verified cold-weather (-10 C) series module counts matched to SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}'s 480 V DC ceiling.

Sampled CEC PV modules aligned within 200.0-480.0 V MPPT and 480.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
AXITEC AC-590TGB/144TS 590.0 W 56.24 V 5 to 8 panels 4.72 kW
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 6 to 11 panels 4.84 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 6 to 10 panels 4.25 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 7 to 11 panels 2.2 kW

Which Competing Grid-Support Inverters Compare to SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Alternative CEC inverters comparable to SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}, including Delta Electronics: E6_BDI {208V} (5,025 W) at 208 V, commercial single-phase.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Delta Electronics: E6_BDI {208V}
Delta Electronics
5,025 W +5 W 208.0 V 480.0 V 97.13%
ABB: PVI-5000-OUTD-US-A {208V}
ABB
5,000 W -20 W 208.0 V 480.0 V 96.0%
ABB: PVI-5000-OUTD-US-Z-A {208V}
ABB
5,000 W -20 W 208.0 V 480.0 V 96.0%
ABB: PVI-5000-OUTD-US-Z-M-A {208V}
ABB
5,000 W -20 W 208.0 V 480.0 V 96.0%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}?

Check SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} (5,020 W AC, 35 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Commercial 208 V, commercial single-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (208V) or NEC 705.11 supply-side tap.
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 480 V DC on SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}.

SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} Panel & Wire Spec

Size 75 C copper conductors at 8 AWG Cu on a 35 A OCPD breaker (24.1 A continuous).

Alternative Inverter Comparison

Compare efficiency (96.62%) and MPPT window (200-480 V) directly against Delta Electronics: E6_BDI {208V} (5,025 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} by SPITZER ENERGY COMPANY covering breaker sizing, MPPT limits, and 208 V, commercial single-phase interconnection.

What breaker and wire size does SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} require?

At 5,020 W continuous AC (208 V, commercial single-phase), continuous current is 24.1 A; 125% NEC 690.8/705.12 sizing requires a 35 A breaker and 8 AWG Cu (75 C) wire.

What commercial switchgear or feeder sizing does SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} require?

At 5,020 W AC and 208 V, commercial single-phase, continuous line current is 24.1 A, requiring a 35 A OCPD and 1,200A Bus / 1,200A Main (208V) or NEC 705.11 interconnection.

How does SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} compare to Delta Electronics: E6_BDI {208V}?

SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V} delivers 5,020 W AC at 96.62% CEC efficiency with a 480 V DC ceiling, while Delta Electronics: E6_BDI {208V} outputs 5,025 W at 208 V, commercial single-phase.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.