Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

Yaskawa Solectria Solar: PVI-50TL-208 {208V} — CEC Inverter Specifications

Manufacturer: Yaskawa Solectria Solar Registry: CEC Verified Engineering Specification

Yaskawa Solectria Solar: PVI-50TL-208 {208V} outputs 50,000 W AC at 208 V, 3-phase (138.8 A continuous, 175 A OCPD), ranking #2,025 of 2,343 CEC inverters at 95.92% efficiency with a 200-700 V MPPT window and 700 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
50,000 W
AC Voltage
208 V, 3-phase
Min PV Breaker
175 A (2/0 AWG Cu)
CEC Efficiency
95.92%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Yaskawa Solectria Solar: PVI-50TL-208 {208V} Compare Against Peer CEC Listings?

NEC 705.12 breaker requirements, efficiency placement, and 208 V, 3-phase grid-support overview for Yaskawa Solectria Solar: PVI-50TL-208 {208V}.

Rated at 50,000 W AC (138.8 A continuous), Yaskawa Solectria Solar: PVI-50TL-208 {208V} ranks #2,025 of 2,343 CEC units at 95.92% efficiency (-0.49 pts vs the 96.41% 208 V median). Minimum 75 C copper conductor sizing for its 175 A circuit is 2/0 AWG Cu per NEC Table 310.16. Cold-weather string Voc must remain under 700 V DC at record local winter lows.

Where Does Yaskawa Solectria Solar: PVI-50TL-208 {208V} Fall Across Listed CEC Models?

Marks Yaskawa Solectria Solar: PVI-50TL-208 {208V} (50,000 W AC) across the California Energy Commission inverter AC capacity distribution.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where Yaskawa Solectria Solar: PVI-50TL-208 {208V} (50,000 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACYaskawa Solectria : 50,000 W

What Dataset Percentiles Define Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Benchmarks Yaskawa Solectria Solar: PVI-50TL-208 {208V} continuous AC output, 95.92% CEC weighted efficiency, and 175 A OCPD breaker demand.

Yaskawa Solectria Solar: PVI-50TL-208 {208V} Technical ThresholdsPercentile comparison for Yaskawa Solectria Solar: PVI-50TL-208 {208V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output50,000 WCEC Efficiency95.92%Backfeed Breaker175 A

What Do the Dataset Ranks Show for Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Four key NEC 705.12 and California Energy Commission metrics defining Yaskawa Solectria Solar: PVI-50TL-208 {208V} by Yaskawa Solectria Solar.

Eff #2,025 / 2,343

95.92% CEC Weighted Efficiency

-0.49 pts vs the 96.41% 208 V median; overall power rank #438 (50,000 W, top 19.3%; higher than 80.7% of peers).

NEC 705.12 Check

175 A Required Backfeed OCPD

125% x 138.8 A = 173.5 A -> 175 A standard OCPD using 2/0 AWG Cu (75 C).

MPPT Window

200 V - 700 V (Max 700 V DC)

Tracking span of 500.0 V; active in CEC directory (grid-tied PV inverter).

Commercial / 3-Phase Fit

Supply-Side Tap (705.11) / Dedicated Switchboard

Evaluated for 208 V, 3-phase switchgear (200A Bus / 200A Main (208V) to 1,200A Bus / 1,200A Main (208V)) under NEC 705.12 / 705.11.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 50000.0W / 208 V 3-phase -> 138.8 A | Breaker >= 1.25 * 138.8 = 173.5 A -> 175 A

CEC Inverters.csv for Yaskawa Solectria Solar: PVI-50TL-208 {208V}: Paco=50000.0 W, Vac=208 V, Vdcmax=700.0 V, Eff=95.92%.

Result: Min 175 A breaker & 2/0 AWG Cu (75 C); 1,200A Bus / 1,200A Main (208V): PASS (120% Commercial Busbar).

What Are the Published CEC Specifications for Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Official laboratory CEC ratings, MPPT operating window, and DC voltage bounds recorded for Yaskawa Solectria Solar: PVI-50TL-208 {208V}.

Official California Energy Commission (NREL SAM) test parameters for Yaskawa Solectria Solar: PVI-50TL-208 {208V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 50,000 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 208 V, 3-phase 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 700 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 200 V - 700 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 137.169 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 95.92% Calculated AC/DC conversion ratio from CEC test protocol
Inverter Topology Hybrid: No (Grid-Tied PV) CEC Solar Equipment List grid-support certification

What Switchgear Limits Apply to Yaskawa Solectria Solar: PVI-50TL-208 {208V} (208 V, 3-phase)?

Evaluates Yaskawa Solectria Solar: PVI-50TL-208 {208V} (175 A OCPD) across standard 100 A to 225 A busbars or commercial switchboards.

Evaluates Yaskawa Solectria Solar: PVI-50TL-208 {208V} (175 A required OCPD at 208 V, 3-phase) across standard distribution busbars.
Switchboard / Interconnect120% Max BackfeedRequired PV OCPDCompliance Verdict
200A Bus / 200A Main (208V) 40 A 175 A Supply-Side Tap (705.11) / Dedicated Switchboard
400A Bus / 400A Main (208V) 80 A 175 A Supply-Side Tap (705.11) / Dedicated Switchboard
600A Bus / 600A Main (208V) 120 A 175 A Supply-Side Tap (705.11) / Dedicated Switchboard
800A Bus / 800A Main (208V) 160 A 175 A Supply-Side Tap (705.11) / Dedicated Switchboard
1,200A Bus / 1,200A Main (208V) 240 A 175 A PASS (120% Commercial Busbar)

Which CEC PV Module Strings Pair With Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Sample PV string lengths aligned within 200-700 V MPPT and 700 V DC max at -10 C. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Sampled CEC PV modules aligned within 200.0-700.0 V MPPT and 700.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
AXITEC AC-590TGB/144TS 590.0 W 56.24 V 5 to 12 panels 7.08 kW
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 6 to 16 panels 7.04 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 6 to 15 panels 6.38 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 7 to 17 panels 3.4 kW

Which Competing Grid-Support Inverters Compare to Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Competing CEC grid-support inverters near 50,000 W AC and 208 V, 3-phase, led by Chint Power Systems America: SCA50K-T-US-208 {208V}.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Chint Power Systems America: SCA50K-T-US-208 {208V}
Chint Power Systems America
50,000 W Tie (0 W) 208.0 V 700.0 V 95.93%
CSI Solar Co Ltd: CSI-30K-T208GL03-U {208V}
CSI Solar Co Ltd
29,878 W -20122 W 208.0 V 680.0 V 96.38%
Chint Power Systems America: CPS SCA25KTL-DO/US-208 {208V}
Chint Power Systems America
25,000 W -25000 W 208.0 V 850.0 V 96.26%
EcoFlow Inc: EF-PCS-24 {208V 24kW}
EcoFlow Inc
24,291 W -25709 W 208.0 V 480.0 V 96.01%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for Yaskawa Solectria Solar: PVI-50TL-208 {208V}?

Check Yaskawa Solectria Solar: PVI-50TL-208 {208V} (50,000 W AC, 175 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Commercial 208 V, 3-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (208V) or NEC 705.11 supply-side tap.
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 700 V DC on Yaskawa Solectria Solar: PVI-50TL-208 {208V}.

Yaskawa Solectria Solar: PVI-50TL-208 {208V} Panel & Wire Spec

Size 75 C copper conductors at 2/0 AWG Cu on a 175 A OCPD breaker (138.8 A continuous).

Alternative Inverter Comparison

Compare efficiency (95.92%) and MPPT window (200-700 V) directly against Chint Power Systems America: SCA50K-T-US-208 {208V} (50,000 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Yaskawa Solectria Solar: PVI-50TL-208 {208V} by Yaskawa Solectria Solar covering breaker sizing, MPPT limits, and 208 V, 3-phase interconnection.

What breaker and wire size does Yaskawa Solectria Solar: PVI-50TL-208 {208V} require?

At 50,000 W continuous AC (208 V, 3-phase), continuous current is 138.8 A; 125% NEC 690.8/705.12 sizing requires a 175 A breaker and 2/0 AWG Cu (75 C) wire.

What commercial switchgear or feeder sizing does Yaskawa Solectria Solar: PVI-50TL-208 {208V} require?

At 50,000 W AC and 208 V, 3-phase, continuous line current is 138.8 A, requiring a 175 A OCPD and 1,200A Bus / 1,200A Main (208V) or NEC 705.11 interconnection.

How does Yaskawa Solectria Solar: PVI-50TL-208 {208V} compare to Chint Power Systems America: SCA50K-T-US-208 {208V}?

Yaskawa Solectria Solar: PVI-50TL-208 {208V} delivers 50,000 W AC at 95.92% CEC efficiency with a 700 V DC ceiling, while Chint Power Systems America: SCA50K-T-US-208 {208V} outputs 50,000 W at 208 V, 3-phase.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.