Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

Power Center: D600-M2A-240A {240V} — CEC Inverter Specifications

Manufacturer: Power Center Registry: CEC Verified Engineering Specification

Power Center: D600-M2A-240A {240V} outputs 576 W AC at 240 V (2.4 A continuous, 15 A OCPD), ranking #1,776 of 2,343 CEC inverters at 96.29% efficiency with a 22-55 V MPPT window and 55 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
576 W
AC Voltage
240 V
Min PV Breaker
15 A (14 AWG Cu)
CEC Efficiency
96.29%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Power Center: D600-M2A-240A {240V} Compare Against Peer CEC Listings?

NEC 705.12 breaker requirements, efficiency placement, and 240 V grid-support overview for Power Center: D600-M2A-240A {240V}. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Rated at 576 W AC (2.4 A continuous), Power Center: D600-M2A-240A {240V} ranks #1,776 of 2,343 CEC units at 96.29% efficiency (-0.39 pts vs the 96.68% 240 V median). Minimum 75 C copper conductor sizing for its 15 A circuit is 14 AWG Cu per NEC Table 310.16. Cold-weather string Voc must remain under 55 V DC at record local winter lows.

Where Does Power Center: D600-M2A-240A {240V} Fall Across Listed CEC Models?

Marks Power Center: D600-M2A-240A {240V} (576 W AC) across the California Energy Commission inverter AC capacity distribution. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where Power Center: D600-M2A-240A {240V} (576 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACPower Center: D600: 576 W

What Dataset Percentiles Define Power Center: D600-M2A-240A {240V}?

Benchmarks Power Center: D600-M2A-240A {240V} continuous AC output, 96.29% CEC weighted efficiency, and 15 A OCPD breaker demand.

Power Center: D600-M2A-240A {240V} Technical ThresholdsPercentile comparison for Power Center: D600-M2A-240A {240V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output576 WCEC Efficiency96.29%Backfeed Breaker15 A

What Do the Dataset Ranks Show for Power Center: D600-M2A-240A {240V}?

Four key NEC 705.12 and California Energy Commission metrics defining Power Center: D600-M2A-240A {240V} by Power Center. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Eff #1,776 / 2,343

96.29% CEC Weighted Efficiency

-0.39 pts vs the 96.68% 240 V median; overall power rank #1,937 (576 W, below CEC median; higher than 17.3% of peers).

NEC 705.12 Check

15 A Required Backfeed OCPD

125% x 2.4 A = 3.0 A -> 15 A standard OCPD using 14 AWG Cu (75 C).

MPPT Window

22 V - 55 V (Max 55 V DC)

Tracking span of 33.0 V; active in CEC directory (grid-tied PV inverter).

Panel Fit (240V)

PASS (120% Rule)

200A/200A panel allows 40A PV backfeed; 200A/175A derate allows 65A; 225A/200A allows 70A.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 576.0W / 240 V -> 2.4 A | Breaker >= 1.25 * 2.4 = 3.0 A -> 15 A

CEC Inverters.csv for Power Center: D600-M2A-240A {240V}: Paco=576.0 W, Vac=240 V, Vdcmax=55.0 V, Eff=96.29%.

Result: Min 15 A breaker & 14 AWG Cu (75 C); 200A Bus / 200A Main: PASS (120% Rule).

What Are the Published CEC Specifications for Power Center: D600-M2A-240A {240V}?

Official laboratory CEC ratings, MPPT operating window, and DC voltage bounds recorded for Power Center: D600-M2A-240A {240V}. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Official California Energy Commission (NREL SAM) test parameters for Power Center: D600-M2A-240A {240V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 576 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 240 V 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 55 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 22 V - 55 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 17.0919 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 96.29% Calculated AC/DC conversion ratio from CEC test protocol
Inverter Topology Hybrid: No (Grid-Tied PV) CEC Solar Equipment List grid-support certification

Can a Residential Panel Meet 120% Busbar Limits for Power Center: D600-M2A-240A {240V}?

Evaluates Power Center: D600-M2A-240A {240V} (15 A OCPD) across standard 100 A to 225 A busbars or commercial switchboards.

Evaluates Power Center: D600-M2A-240A {240V} (15 A required OCPD at 240 V) across standard distribution busbars.
Panel Configuration120% Max BackfeedRequired PV OCPDCompliance Verdict
100A Bus / 100A Main 20 A 15 A PASS (120% Rule)
150A Bus / 150A Main 30 A 15 A PASS (120% Rule)
200A Bus / 200A Main 40 A 15 A PASS (120% Rule)
200A Bus / 175A Main 65 A 15 A PASS (120% Rule)
225A Bus / 200A Main 70 A 15 A PASS (120% Rule)

Which CEC PV Module Strings Pair With Power Center: D600-M2A-240A {240V}?

Sample PV string lengths aligned within 22-55 V MPPT and 55 V DC max at -10 C. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Sampled CEC PV modules aligned within 22.0-55.0 V MPPT and 55.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 1 panel (micro/module) 0.44 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 1 panel (micro/module) 0.42 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 1 panel (micro/module) 0.2 kW
Chint New Energy Technology Co Ltd CHSM72M(DG)/F-BH-515 515.0 W 53.76 V 1 panel (micro/module) 0.52 kW

Which Competing Grid-Support Inverters Compare to Power Center: D600-M2A-240A {240V}?

Competing CEC grid-support inverters near 576 W AC and 240 V, led by Altenergy Power System Inc: YC600 {240V}.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Altenergy Power System Inc: YC600 {240V}
Altenergy Power System Inc
550 W -26 W 240.0 V 45.0 V 96.51%
Cherry Solution Co Ltd: CMI-600S-SA {240V}
Cherry Solution Co Ltd
604 W +28 W 240.0 V 50.0 V 96.12%
Cherry Solution Co Ltd: CMI-600S-WA {240V}
Cherry Solution Co Ltd
604 W +28 W 240.0 V 50.0 V 96.12%
Altenergy Power System Inc: DS3-S {240V}
Altenergy Power System Inc
656 W +80 W 240.0 V 43.0 V 97.23%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for Power Center: D600-M2A-240A {240V}?

Check Power Center: D600-M2A-240A {240V} (576 W AC, 15 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Module-level microinverter output eliminates high-voltage DC rooftop strings and connects via a 240V AC trunk circuit.
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 55 V DC on Power Center: D600-M2A-240A {240V}.

Power Center: D600-M2A-240A {240V} Panel & Wire Spec

Size 75 C copper conductors at 14 AWG Cu on a 15 A OCPD breaker (2.4 A continuous).

Alternative Inverter Comparison

Compare efficiency (96.29%) and MPPT window (22-55 V) directly against Altenergy Power System Inc: YC600 {240V} (550 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Power Center: D600-M2A-240A {240V} by Power Center covering breaker sizing, MPPT limits, and 240 V interconnection.

What breaker and wire size does Power Center: D600-M2A-240A {240V} require?

At 576 W continuous AC (240 V), continuous current is 2.4 A; 125% NEC 690.8/705.12 sizing requires a 15 A breaker and 14 AWG Cu (75 C) wire.

Does Power Center: D600-M2A-240A {240V} fit a 200 A main panel under the 120% busbar rule?

A 200 A busbar with a 200 A main allows 40 A of solar backfeed. Requiring 15 A at 240 V means PASS (120% Rule).

How does Power Center: D600-M2A-240A {240V} compare to Altenergy Power System Inc: YC600 {240V}?

Power Center: D600-M2A-240A {240V} delivers 576 W AC at 96.29% CEC efficiency with a 55 V DC ceiling, while Altenergy Power System Inc: YC600 {240V} outputs 550 W at 240 V.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.