Northern Electric & Power Co Ltd: BDM-350-240A {240V} outputs 346 W AC at 240 V (1.4 A continuous, 15 A OCPD), ranking #1,776 of 2,343 CEC inverters at 96.29% efficiency with a 22-55 V MPPT window and 55 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- AC Output (Paco)
- 346 W
- AC Voltage
- 240 V
- Min PV Breaker
- 15 A (14 AWG Cu)
- CEC Efficiency
- 96.29%
How Does Northern Electric & Power Co Ltd: BDM-350-240A {240V} Compare Against Peer CEC Listings?
NEC 705.12 breaker requirements, efficiency placement, and 240 V grid-support overview for Northern Electric & Power Co Ltd: BDM-350-240A {240V}.
Rated at 346 W AC (1.4 A continuous), Northern Electric & Power Co Ltd: BDM-350-240A {240V} ranks #1,776 of 2,343 CEC units at 96.29% efficiency (-0.39 pts vs the 96.68% 240 V median). Minimum 75 C copper conductor sizing for its 15 A circuit is 14 AWG Cu per NEC Table 310.16. Cold-weather string Voc must remain under 55 V DC at record local winter lows.
Where Does Northern Electric & Power Co Ltd: BDM-350-240A {240V} Fall Across Listed CEC Models?
Marks Northern Electric & Power Co Ltd: BDM-350-240A {240V} (346 W AC) across the California Energy Commission inverter AC capacity distribution.
What Dataset Percentiles Define Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Benchmarks Northern Electric & Power Co Ltd: BDM-350-240A {240V} continuous AC output, 96.29% CEC weighted efficiency, and 15 A OCPD breaker demand.
What Do the Dataset Ranks Show for Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Four key NEC 705.12 and California Energy Commission metrics defining Northern Electric & Power Co Ltd: BDM-350-240A {240V} by Northern Electric & Power Co Ltd.
96.29% CEC Weighted Efficiency
-0.39 pts vs the 96.68% 240 V median; overall power rank #2,117 (346 W, below CEC median; higher than 9.6% of peers).
15 A Required Backfeed OCPD
125% x 1.4 A = 1.8 A -> 15 A standard OCPD using 14 AWG Cu (75 C).
22 V - 55 V (Max 55 V DC)
Tracking span of 33.0 V; active in CEC directory (grid-tied PV inverter).
PASS (120% Rule)
200A/200A panel allows 40A PV backfeed; 200A/175A derate allows 65A; 225A/200A allows 70A.
NEC 705.12 Backfeed OCPD & 120% Busbar Formula
I_cont = 346.0W / 240 V -> 1.4 A | Breaker >= 1.25 * 1.4 = 1.8 A -> 15 A
CEC Inverters.csv for Northern Electric & Power Co Ltd: BDM-350-240A {240V}: Paco=346.0 W, Vac=240 V, Vdcmax=55.0 V, Eff=96.29%.
Result: Min 15 A breaker & 14 AWG Cu (75 C); 200A Bus / 200A Main: PASS (120% Rule).
What Are the Published CEC Specifications for Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Official laboratory CEC ratings, MPPT operating window, and DC voltage bounds recorded for Northern Electric & Power Co Ltd: BDM-350-240A {240V}.
| Parameter | Measured / Listed Value | Engineering Significance |
|---|---|---|
| Max Continuous AC Power (Paco) | 346 W | Determines required backfeed OCPD size via 125% continuous rule |
| Nominal AC Voltage (Vac) | 240 V | 240V split-phase residential vs. 208V/480V/MV commercial |
| Max DC Input Voltage (Vdcmax) | 55 V | Hard ceiling for cold-weather PV string Voc under NEC 690.7 |
| MPPT Operating Range | 22 V - 55 V | Optimal DC string Vmp window for full power harvest |
| Max Input DC Current (Idcmax) | 10.2666 A | Used to verify parallel string combiner limits |
| CEC Weighted Efficiency | 96.29% | Calculated AC/DC conversion ratio from CEC test protocol |
| Inverter Topology | Hybrid: No (Grid-Tied PV) | CEC Solar Equipment List grid-support certification |
Can a Residential Panel Meet 120% Busbar Limits for Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Evaluates Northern Electric & Power Co Ltd: BDM-350-240A {240V} (15 A OCPD) across standard 100 A to 225 A busbars or commercial switchboards.
| Panel Configuration | 120% Max Backfeed | Required PV OCPD | Compliance Verdict |
|---|---|---|---|
| 100A Bus / 100A Main | 20 A | 15 A | PASS (120% Rule) |
| 150A Bus / 150A Main | 30 A | 15 A | PASS (120% Rule) |
| 200A Bus / 200A Main | 40 A | 15 A | PASS (120% Rule) |
| 200A Bus / 175A Main | 65 A | 15 A | PASS (120% Rule) |
| 225A Bus / 200A Main | 70 A | 15 A | PASS (120% Rule) |
Which CEC PV Module Strings Pair With Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Sample PV string lengths aligned within 22-55 V MPPT and 55 V DC max at -10 C. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
| CEC Module | STC (W) | -10 C Voc | Valid String Range | Max String DC |
|---|---|---|---|---|
| Aptos Solar Technology LLC DNA-108-MFN10-440W | 440.0 W | 42.15 V | 1 panel (micro/module) | 0.44 kW |
| Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF | 425.0 W | 44.75 V | 1 panel (micro/module) | 0.42 kW |
| CSI Solar Co Ltd CS6P-200P | 200.0 W | 40.6 V | 1 panel (micro/module) | 0.2 kW |
| Chint New Energy Technology Co Ltd CHSM72M(DG)/F-BH-515 | 515.0 W | 53.76 V | 1 panel (micro/module) | 0.52 kW |
Which Competing Grid-Support Inverters Compare to Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Competing CEC grid-support inverters near 346 W AC and 240 V, led by Aptos Solar Technology LLC: MAC-400 {240V}.
| Alternative Inverter | AC Output | Delta | Vac | Max DC | CEC Eff |
|---|---|---|---|---|---|
| Aptos Solar Technology LLC: MAC-400 {240V} Aptos Solar Technology LLC |
382 W | +36 W | 240.0 V | 48.0 V | 96.52% |
| Aptos Solar Technology LLC: MAC-400R {240V} Aptos Solar Technology LLC |
382 W | +36 W | 240.0 V | 48.0 V | 96.52% |
| Chilicon Power LLC: CP-250E-60/72-208/240-MC4 {240V} Chilicon Power LLC |
289 W | -57 W | 240.0 V | 32.0 V | 95.41% |
| Altenergy Power System Inc: YC600 {240V} Altenergy Power System Inc |
550 W | +204 W | 240.0 V | 45.0 V | 96.51% |
What Are the Interconnection Limits and Best-Fit Uses for Northern Electric & Power Co Ltd: BDM-350-240A {240V}?
Check Northern Electric & Power Co Ltd: BDM-350-240A {240V} (346 W AC, 15 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.
- Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
- Busbar 120% limit: Module-level microinverter output eliminates high-voltage DC rooftop strings and connects via a 240V AC trunk circuit.
- Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 55 V DC on Northern Electric & Power Co Ltd: BDM-350-240A {240V}.
Northern Electric & Power Co Ltd: BDM-350-240A {240V} Panel & Wire Spec
Size 75 C copper conductors at 14 AWG Cu on a 15 A OCPD breaker (1.4 A continuous).
Alternative Inverter Comparison
Compare efficiency (96.29%) and MPPT window (22-55 V) directly against Aptos Solar Technology LLC: MAC-400 {240V} (382 W).
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Northern Electric & Power Co Ltd: BDM-350-240A {240V} by Northern Electric & Power Co Ltd covering breaker sizing, MPPT limits, and 240 V interconnection.
What breaker and wire size does Northern Electric & Power Co Ltd: BDM-350-240A {240V} require?
At 346 W continuous AC (240 V), continuous current is 1.4 A; 125% NEC 690.8/705.12 sizing requires a 15 A breaker and 14 AWG Cu (75 C) wire.
Does Northern Electric & Power Co Ltd: BDM-350-240A {240V} fit a 200 A main panel under the 120% busbar rule?
A 200 A busbar with a 200 A main allows 40 A of solar backfeed. Requiring 15 A at 240 V means PASS (120% Rule).
How does Northern Electric & Power Co Ltd: BDM-350-240A {240V} compare to Aptos Solar Technology LLC: MAC-400 {240V}?
Northern Electric & Power Co Ltd: BDM-350-240A {240V} delivers 346 W AC at 96.29% CEC efficiency with a 55 V DC ceiling, while Aptos Solar Technology LLC: MAC-400 {240V} outputs 382 W at 240 V.
Sources
- CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)