Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

Northern Electric & Power Co Ltd: BDM-1600-LV {120V} — CEC Inverter Specifications

Manufacturer: Northern Electric & Power Co Ltd Registry: CEC Verified Engineering Specification

Northern Electric & Power Co Ltd: BDM-1600-LV {120V} outputs 1,597 W AC at 120 V (13.3 A continuous, 20 A OCPD), ranking #1,756 of 2,343 CEC inverters at 96.31% efficiency with a 22-55 V MPPT window and 55 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
1,597 W
AC Voltage
120 V
Min PV Breaker
20 A (12 AWG Cu)
CEC Efficiency
96.31%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Northern Electric & Power Co Ltd: BDM-1600-LV {120V} Compare Against Peer CEC Listings?

CEC efficiency rank (#1,756), 22-55 V MPPT tracking, and panel fit for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}.

Operating at 120 V, Northern Electric & Power Co Ltd: BDM-1600-LV {120V} converts DC array energy at 96.31% CEC weighted efficiency (below overall CEC median; higher than 24.5% of peers) with a 55 V max DC input and 47.3767 A max input current for NEC 690.7 string safety. Compare this 1,597 W grid-tied PV inverter directly with Altenergy Power System Inc: DS3-LV {120V} (915 W). Requires a 20 A breaker, passing directly inside a standard 200 A main / 200 A busbar panel (40 A limit).

Where Does Northern Electric & Power Co Ltd: BDM-1600-LV {120V} Fall Across Listed CEC Models?

CEC inverter wattage histogram highlighting Northern Electric & Power Co Ltd: BDM-1600-LV {120V} at 1,597 W continuous AC output.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (1,597 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACNorthern Electric : 1,597 W

What Dataset Percentiles Define Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Dataset percentiles comparing Northern Electric & Power Co Ltd: BDM-1600-LV {120V} against 2,343 certified grid-support inverters nationwide. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Northern Electric & Power Co Ltd: BDM-1600-LV {120V} Technical ThresholdsPercentile comparison for Northern Electric & Power Co Ltd: BDM-1600-LV {120V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output1,597 WCEC Efficiency96.31%Backfeed Breaker20 A

What Do the Dataset Ranks Show for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Engineering highlights for Northern Electric & Power Co Ltd: BDM-1600-LV {120V} covering efficiency, 12 AWG Cu feeder, and panel compatibility.

Eff #1,756 / 2,343

96.31% CEC Weighted Efficiency

+1.58 pts vs the 94.73% 120 V median; overall power rank #1,782 (1,597 W, below CEC median; higher than 23.9% of peers).

NEC 705.12 Check

20 A Required Backfeed OCPD

125% x 13.3 A = 16.6 A -> 20 A standard OCPD using 12 AWG Cu (75 C).

MPPT Window

22 V - 55 V (Max 55 V DC)

Tracking span of 33.0 V; listed since 2025-11-12 (grid-tied PV inverter).

Panel Fit (240V)

120V AC Coupled / Dedicated Transformer

200A/200A panel allows 40A PV backfeed; 200A/175A derate allows 65A; 225A/200A allows 70A.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 1597.0W / 120 V -> 13.3 A | Breaker >= 1.25 * 13.3 = 16.6 A -> 20 A

CEC Inverters.csv for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}: Paco=1597.0 W, Vac=120 V, Vdcmax=55.0 V, Eff=96.31%.

Result: Min 20 A breaker & 12 AWG Cu (75 C); 200A Bus / 200A Main: 120V AC Coupled / Dedicated Transformer.

What Are the Published CEC Specifications for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

California Energy Commission Solar Equipment List parameters for Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (grid-tied PV inverter) interconnection.

Official California Energy Commission (NREL SAM) test parameters for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 1,597 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 120 V 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 55 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 22 V - 55 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 47.3767 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 96.31% Calculated AC/DC conversion ratio from CEC test protocol
CEC Listing Date & Hybrid 2025-11-12 / Hybrid: No (Grid-Tied PV) Utility interconnection approval metadata

Can a Residential Panel Meet 120% Busbar Limits for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Panelboard and switchgear backfeed allowances for Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (20 A OCPD). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Evaluates Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (20 A required OCPD at 120 V) across standard distribution busbars.
Panel Configuration120% Max BackfeedRequired PV OCPDCompliance Verdict
100A Bus / 100A Main 20 A 20 A 120V AC Coupled / Dedicated Transformer
150A Bus / 150A Main 30 A 20 A 120V AC Coupled / Dedicated Transformer
200A Bus / 200A Main 40 A 20 A 120V AC Coupled / Dedicated Transformer
200A Bus / 175A Main 65 A 20 A 120V AC Coupled / Dedicated Transformer
225A Bus / 200A Main 70 A 20 A 120V AC Coupled / Dedicated Transformer

Which CEC PV Module Strings Pair With Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Representative PV panel pairings verified under NEC 690.7 cold Voc for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}.

Sampled CEC PV modules aligned within 22.0-55.0 V MPPT and 55.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 1 panel (micro/module) 0.44 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 1 panel (micro/module) 0.42 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 1 panel (micro/module) 0.2 kW
Chint New Energy Technology Co Ltd CHSM72M(DG)/F-BH-515 515.0 W 53.76 V 1 panel (micro/module) 0.52 kW

Which Competing Grid-Support Inverters Compare to Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Four alternative CEC inverters matched to Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (1,597 W AC), led by Altenergy Power System Inc: DS3-LV {120V}.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Altenergy Power System Inc: DS3-LV {120V}
Altenergy Power System Inc
915 W -682 W 120.0 V 45.0 V 94.08%
Altenergy Power System Inc: EZ1-LV {120V}
Altenergy Power System Inc
915 W -682 W 120.0 V 45.0 V 94.08%
OutBack Power: FXR3048A {120V}
OutBack Power
2,560 W +963 W 120.0 V 60.0 V 91.11%
Apparent Inc: SG424-PLUS-120VAC-60HZ-CA {120V}
Apparent Inc
326 W -1271 W 120.0 V 52.0 V 90.97%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for Northern Electric & Power Co Ltd: BDM-1600-LV {120V}?

Check Northern Electric & Power Co Ltd: BDM-1600-LV {120V} (1,597 W AC, 20 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Requires a 20 A breaker, passing directly inside a standard 200 A main / 200 A busbar panel (40 A limit).
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 55 V DC on Northern Electric & Power Co Ltd: BDM-1600-LV {120V}.

Northern Electric & Power Co Ltd: BDM-1600-LV {120V} Panel & Wire Spec

Size 75 C copper conductors at 12 AWG Cu on a 20 A OCPD breaker (13.3 A continuous).

Alternative Inverter Comparison

Compare efficiency (96.31%) and MPPT window (22-55 V) directly against Altenergy Power System Inc: DS3-LV {120V} (915 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Northern Electric & Power Co Ltd: BDM-1600-LV {120V} by Northern Electric & Power Co Ltd covering breaker sizing, MPPT limits, and 120 V interconnection.

What breaker and wire size does Northern Electric & Power Co Ltd: BDM-1600-LV {120V} require?

At 1,597 W continuous AC (120 V), continuous current is 13.3 A; 125% NEC 690.8/705.12 sizing requires a 20 A breaker and 12 AWG Cu (75 C) wire.

Does Northern Electric & Power Co Ltd: BDM-1600-LV {120V} fit a 200 A main panel under the 120% busbar rule?

A 200 A busbar with a 200 A main allows 40 A of solar backfeed. Requiring 20 A at 120 V means 120V AC Coupled / Dedicated Transformer.

How does Northern Electric & Power Co Ltd: BDM-1600-LV {120V} compare to Altenergy Power System Inc: DS3-LV {120V}?

Northern Electric & Power Co Ltd: BDM-1600-LV {120V} delivers 1,597 W AC at 96.31% CEC efficiency with a 55 V DC ceiling, while Altenergy Power System Inc: DS3-LV {120V} outputs 915 W at 120 V.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.