Slope Electric Coop Inc (EIA ID 17261, ND) serves 3,214 customers at 14.27 c/kWh (+2.45 c/kWh vs North Dakota average) with no standalone IEEE SAIDI filing (4 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 17261
- Res. Rate
- 14.27 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Slope Electric Coop Inc Compare on Tariffs and Reliability?
EIA-861 rate delta (+2.45 c/kWh vs North Dakota average), customer scale (3,214), and 2026 solar payback benchmarks for Slope Electric Coop Inc.
Ranked #1,048 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 47.1% of peers), Slope Electric Coop Inc serves 3,214 accounts in North Dakota (Cooperative). Commercial power averages 14.62 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 212.1 min/yr), with zero residential net-metered PV reported in 2025 filings.
Where Does Slope Electric Coop Inc Sit Across US Utility Rates?
Positions Slope Electric Coop Inc (14.27 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
How Does Slope Electric Coop Inc Rank Across Cost & Reliability?
Percentile placement of Slope Electric Coop Inc across retail kWh electricity cost and IEEE grid reliability outage metrics.
What Do EIA-861 Benchmarks Show for Slope Electric Coop Inc?
Four key EIA-861 rate, outage, and solar payback benchmarks for Slope Electric Coop Inc (Cooperative) in North Dakota.
14.27 c/kWh (+2.45 vs ND)
Commercial avg: 14.62 c/kWh; Industrial: 8.27 c/kWh; est. residential bill $163.97/mo.
212.1 min/yr (ND Avg)
Utility did not file separate IEEE SAIDI in 2025; North Dakota customer-weighted SAIDI is 212.1 min/yr.
15.3 Years @ 14.27 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,541/yr at 1,350 kWh/kW.
3,214 Customers · 4 Counties
Serves 4 counties including Adams, Bowman, Hettinger in North Dakota; state FEMA declarations (2015-2026): 19.
Slope Electric Coop Inc Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1427 = $1,541/yr
EIA-861 2025 Utility ID 17261: Rate=14.27 c/kWh, Cust=3,214.
Result: 15.3 yr 8 kW cash payback at 14.27 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Slope Electric Coop Inc?
Complete Form EIA-861 filing summary for Slope Electric Coop Inc (ID 17261) covering sales, PV, and counties. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
| EIA Utility ID & BA Code | ID 17261 · SWPP |
|---|---|
| State & Ownership Type | ND · Cooperative |
| Retail Electricity Rates | 14.27 c/kWh Res · 14.62 c Comm · 8.27 c Ind |
| Avg Monthly Usage & Bill | 1,148.9 kWh/mo ($163.97/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 4 counties (Adams, Bowman, Hettinger, Slope) |
Which Peer Electric Utilities Operate in ND?
Compare Slope Electric Coop Inc directly with McLean Electric Coop, Inc and nearby North Dakota electric utilities by customer base.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| McLean Electric Coop, Inc | 14.64 c | — | 9 | 3,706 |
| Burke-Divide Electric Coop Inc | 8.61 c | — | 1 | 1,804 |
| McKenzie Electric Coop Inc | 8.02 c | 110.8 min | 0 | 5,367 |
| Lower Yellowstone R E A, Inc | 8.95 c | — | 0 | 680 |
What Should Slope Electric Coop Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Slope Electric Coop Inc (Cooperative, ND) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Annual snapshot caveat: Slope Electric Coop Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in ND.
- Export credit rules: check Slope Electric Coop Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.
Slope Electric Coop Inc Solar & Battery Evaluators
Compare your actual Slope Electric Coop Inc monthly kWh statement against 14.27 c/kWh and verify current export tariffs in ND.
Slope Electric Coop Inc Outage & Generator Planners
Use Slope Electric Coop Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Slope Electric Coop Inc (North Dakota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Slope Electric Coop Inc's residential electricity rate and 2026 solar payback?
Slope Electric Coop Inc averages 14.27 c/kWh (+2.45 c/kWh vs North Dakota average vs. North Dakota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,541/yr (15.3-year payback).
How reliable is Slope Electric Coop Inc compared to peer North Dakota utilities?
Slope Electric Coop Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 212.1 min/yr); compare rates and outage history directly with McLean Electric Coop, Inc (14.64 c/kWh) across North Dakota.
Which counties and customers does Slope Electric Coop Inc serve in North Dakota?
EIA-861 filings list 3,214 customers across 4 counties including Adams, Bowman, Hettinger, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Slope Electric Coop Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)