McKenzie Electric Coop Inc (EIA ID 12087, ND) serves 5,367 customers at 8.02 c/kWh (-3.80 c/kWh vs North Dakota average) with 110.8 min/yr SAIDI (1.85 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 12087
- Res. Rate
- 8.02 c/kWh
- SAIDI (All Events)
- 110.8 min/yr
- Net-Metered PV
- Unreported
How Does McKenzie Electric Coop Inc Compare on Tariffs and Reliability?
Solar payback, residential tariff (8.02 c/kWh), and outage history inside McKenzie Electric Coop Inc territory. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
Evaluating solar or generator backup under McKenzie Electric Coop Inc (North Dakota) starts with its 8.02 c/kWh residential baseline (-3.80 c/kWh vs North Dakota average) and 27.3-year 8 kW cash payback. EIA-861 records show McKenzie Electric Coop Inc recorded 110.8 SAIDI outage minutes (1.85 hrs/yr, rank #249 of 751 reporting utilities) across 5,367 accounts.
Where Does McKenzie Electric Coop Inc Sit Across US Utility Rates?
Benchmarking McKenzie Electric Coop Inc's 8.02 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
How Does McKenzie Electric Coop Inc Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for McKenzie Electric Coop Inc across North Dakota utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
What Do EIA-861 Benchmarks Show for McKenzie Electric Coop Inc?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by McKenzie Electric Coop Inc in 2025.
8.02 c/kWh (-3.80 vs ND)
Commercial avg: 8.01 c/kWh; Industrial: 6.77 c/kWh; est. residential bill $144.71/mo.
110.8 min/yr (1.85 hrs)
0.0% (0.0 min) from Major Event Days; avg restore 119.3 min (~3.6 kWh @ 1.8 kW).
27.3 Years @ 8.02 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$866/yr at 1,350 kWh/kW.
5,367 Customers · 5 Counties
Serves 5 counties including Billings, Dunn, Golden Valley in North Dakota; state FEMA declarations (2015-2026): 19.
McKenzie Electric Coop Inc Reliability & Solar Offset Calculation
Backup_Energy = (119.3 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0802 = $866/yr
EIA-861 2025 Utility ID 12087: Rate=8.02 c/kWh, Cust=5,367, SAIDI=110.8 min.
Result: 1.85 outage hrs/yr; 27.3 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for McKenzie Electric Coop Inc?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 12087. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
| EIA Utility ID & BA Code | ID 12087 · SWPP |
|---|---|
| State & Ownership Type | ND · Cooperative |
| Retail Electricity Rates | 8.02 c/kWh Res · 8.01 c Comm · 6.77 c Ind |
| Avg Monthly Usage & Bill | 1,803.6 kWh/mo ($144.71/mo est.) |
| SAIDI (All Events w/ MED) | 110.8 min/yr (1.85 hrs/yr) |
| SAIDI (Without Major Events) | 110.8 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.929 /yr · 119.3 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 5 counties (Billings, Dunn, Golden Valley, McKenzie, Mercer) |
Which Peer Electric Utilities Operate in ND?
Benchmark McKenzie Electric Coop Inc directly against Dakota Valley Elec Coop Inc and peer North Dakota retail electric power providers.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Dakota Valley Elec Coop Inc | 12.74 c | 63.8 min | 0 | 5,790 |
| North Central Elec Coop, Inc - (ND) | 10.94 c | — | 0 | 6,088 |
| McLean Electric Coop, Inc | 14.64 c | — | 9 | 3,706 |
| Slope Electric Coop Inc | 14.27 c | — | 0 | 3,214 |
What Should McKenzie Electric Coop Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for McKenzie Electric Coop Inc (Cooperative, ND) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Annual snapshot caveat: McKenzie Electric Coop Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in ND.
- Export credit rules: check McKenzie Electric Coop Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.
McKenzie Electric Coop Inc Solar & Battery Evaluators
Compare your actual McKenzie Electric Coop Inc monthly kWh statement against 8.02 c/kWh and verify current export tariffs in ND.
McKenzie Electric Coop Inc Outage & Generator Planners
Use McKenzie Electric Coop Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for McKenzie Electric Coop Inc (North Dakota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is McKenzie Electric Coop Inc's residential electricity rate and 2026 solar payback?
McKenzie Electric Coop Inc averages 8.02 c/kWh (-3.80 c/kWh vs North Dakota average vs. North Dakota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$866/yr (27.3-year payback).
How reliable is McKenzie Electric Coop Inc compared to peer North Dakota utilities?
McKenzie Electric Coop Inc recorded 110.8 SAIDI outage minutes (1.85 hrs/yr, rank #249 of 751 reporting utilities); compare rates and outage history directly with Dakota Valley Elec Coop Inc (12.74 c/kWh) across North Dakota.
Which counties and customers does McKenzie Electric Coop Inc serve in North Dakota?
EIA-861 filings list 5,367 customers across 5 counties including Billings, Dunn, Golden Valley, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting McKenzie Electric Coop Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)