Powder River Energy Corp (EIA ID 19156, MT) serves 51 customers at 13.2 c/kWh (+0.21 c/kWh vs Montana average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 19156
- Res. Rate
- 13.2 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Powder River Energy Corp Compare on Tariffs and Reliability?
How Powder River Energy Corp (Cooperative) performs across 2 counties on kWh rates and outage resilience. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
Powder River Energy Corp (Cooperative) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr). Typical residential meters drew 848.0 kWh/mo ($111.93/mo) in 2025, while its tariff bills residential power at 13.2 c/kWh (+0.21 c/kWh vs Montana average vs. Montana), offsetting ~$1,426/yr on an 8 kW array—compare rates directly with McKenzie Electric Coop Inc (8.93 c/kWh).
Where Does Powder River Energy Corp Sit Across US Utility Rates?
National utility tariff curve marking Powder River Energy Corp at 13.2 c/kWh vs. 18.54 c/kWh US mean.
How Does Powder River Energy Corp Rank Across Cost & Reliability?
Relative ranking of Powder River Energy Corp on residential electricity pricing and annual IEEE SAIDI outage duration. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
What Do EIA-861 Benchmarks Show for Powder River Energy Corp?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Powder River Energy Corp in Montana.
13.2 c/kWh (+0.21 vs MT)
Commercial avg: 22.15 c/kWh; Industrial: 7.33 c/kWh; est. residential bill $111.93/mo.
286.3 min/yr (MT Avg)
Utility did not file separate IEEE SAIDI in 2025; Montana customer-weighted SAIDI is 286.3 min/yr.
16.5 Years @ 13.2 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,426/yr at 1,350 kWh/kW.
51 Customers · 2 Counties
Serves 2 counties including Big Horn, Powder River in Montana; state FEMA declarations (2015-2026): 45.
Powder River Energy Corp Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1320 = $1,426/yr
EIA-861 2025 Utility ID 19156: Rate=13.2 c/kWh, Cust=51.
Result: 16.5 yr 8 kW cash payback at 13.2 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Powder River Energy Corp?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Powder River Energy Corp. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
| EIA Utility ID & BA Code | ID 19156 · WACM |
|---|---|
| State & Ownership Type | MT · Cooperative |
| Retail Electricity Rates | 13.2 c/kWh Res · 22.15 c Comm · 7.33 c Ind |
| Avg Monthly Usage & Bill | 848.0 kWh/mo ($111.93/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Big Horn, Powder River) |
Which Peer Electric Utilities Operate in MT?
Nearby Montana electric utilities of comparable customer size led by McKenzie Electric Coop Inc (8.93 c/kWh). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| McKenzie Electric Coop Inc | 8.93 c | — | 0 | 25 |
| Black Hills Power, Inc. | 6.99 c | 756.3 min | 0 | 13 |
| Avista Corp | 8.67 c | — | 0 | 10 |
| Fall River Rural Elec Coop Inc | 11.11 c | 14.4 min | 5 | 1,525 |
What Should Powder River Energy Corp Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Powder River Energy Corp (Cooperative, MT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- ERCOT / retail choice note or local riders: confirm whether Powder River Energy Corp acts as a wires-only TDU or bundled utility in MT.
- Transformer limits: Powder River Energy Corp interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.
Powder River Energy Corp Solar & Battery Evaluators
Compare your actual Powder River Energy Corp monthly kWh statement against 13.2 c/kWh and verify current export tariffs in MT.
Powder River Energy Corp Outage & Generator Planners
Use Powder River Energy Corp's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Powder River Energy Corp (Montana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Powder River Energy Corp's residential electricity rate and 2026 solar payback?
Powder River Energy Corp averages 13.2 c/kWh (+0.21 c/kWh vs Montana average vs. Montana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,426/yr (16.5-year payback).
How reliable is Powder River Energy Corp compared to peer Montana utilities?
Powder River Energy Corp did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr); compare rates and outage history directly with McKenzie Electric Coop Inc (8.93 c/kWh) across Montana.
Which counties and customers does Powder River Energy Corp serve in Montana?
EIA-861 filings list 51 customers across 2 counties including Big Horn, Powder River, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Powder River Energy Corp.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)