McKenzie Electric Coop Inc (EIA ID 12087, MT) serves 25 customers at 8.93 c/kWh (-4.06 c/kWh vs Montana average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 12087
- Res. Rate
- 8.93 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does McKenzie Electric Coop Inc Compare on Tariffs and Reliability?
Solar payback, residential tariff (8.93 c/kWh), and outage history inside McKenzie Electric Coop Inc territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
Homeowners inside McKenzie Electric Coop Inc's Montana footprint (2 counties including Richland, Wibaux) face 8.93 c/kWh benchmark pricing (-9.61 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 24.5 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr).
Where Does McKenzie Electric Coop Inc Sit Across US Utility Rates?
Benchmarking McKenzie Electric Coop Inc's 8.93 c/kWh residential rate against 1,989 EIA-861 utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
How Does McKenzie Electric Coop Inc Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for McKenzie Electric Coop Inc across Montana utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
What Do EIA-861 Benchmarks Show for McKenzie Electric Coop Inc?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by McKenzie Electric Coop Inc in 2025.
8.93 c/kWh (-4.06 vs MT)
Commercial avg: 11.18 c/kWh; Industrial: 24.41 c/kWh; est. residential bill $119.00/mo.
286.3 min/yr (MT Avg)
Utility did not file separate IEEE SAIDI in 2025; Montana customer-weighted SAIDI is 286.3 min/yr.
24.5 Years @ 8.93 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$964/yr at 1,350 kWh/kW.
25 Customers · 2 Counties
Serves 2 counties including Richland, Wibaux in Montana; state FEMA declarations (2015-2026): 45.
McKenzie Electric Coop Inc Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0893 = $964/yr
EIA-861 2025 Utility ID 12087: Rate=8.93 c/kWh, Cust=25.
Result: 24.5 yr 8 kW cash payback at 8.93 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for McKenzie Electric Coop Inc?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 12087. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
| EIA Utility ID & BA Code | ID 12087 · SWPP |
|---|---|
| State & Ownership Type | MT · Cooperative |
| Retail Electricity Rates | 8.93 c/kWh Res · 11.18 c Comm · 24.41 c Ind |
| Avg Monthly Usage & Bill | 1,333.3 kWh/mo ($119.00/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Richland, Wibaux) |
Which Peer Electric Utilities Operate in MT?
Benchmark McKenzie Electric Coop Inc directly against Black Hills Power, Inc. and peer Montana retail electric power providers.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Black Hills Power, Inc. | 6.99 c | 756.3 min | 0 | 13 |
| Avista Corp | 8.67 c | — | 0 | 10 |
| Powder River Energy Corp | 13.2 c | — | 0 | 51 |
| Fall River Rural Elec Coop Inc | 11.11 c | 14.4 min | 5 | 1,525 |
What Should McKenzie Electric Coop Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for McKenzie Electric Coop Inc (Cooperative, MT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: McKenzie Electric Coop Inc's 8.93 c/kWh blended residential rate in MT does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: McKenzie Electric Coop Inc system-wide SAIDI averages rural and urban circuits across its MT territory or nearby Black Hills Power, Inc..
McKenzie Electric Coop Inc Solar & Battery Evaluators
Compare your actual McKenzie Electric Coop Inc monthly kWh statement against 8.93 c/kWh and verify current export tariffs in MT.
McKenzie Electric Coop Inc Outage & Generator Planners
Use McKenzie Electric Coop Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for McKenzie Electric Coop Inc (Montana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is McKenzie Electric Coop Inc's residential electricity rate and 2026 solar payback?
McKenzie Electric Coop Inc averages 8.93 c/kWh (-4.06 c/kWh vs Montana average vs. Montana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$964/yr (24.5-year payback).
How reliable is McKenzie Electric Coop Inc compared to peer Montana utilities?
McKenzie Electric Coop Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr); compare rates and outage history directly with Black Hills Power, Inc. (6.99 c/kWh) across Montana.
Which counties and customers does McKenzie Electric Coop Inc serve in Montana?
EIA-861 filings list 25 customers across 2 counties including Richland, Wibaux, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting McKenzie Electric Coop Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)