Tesla Inc. (EIA ID 57313, CA) serves 125,519 customers at 18.91 c/kWh (-12.44 c/kWh vs California average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 57313
- Res. Rate
- 18.91 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Tesla Inc. Compare on Tariffs and Reliability?
How Tesla Inc. (Behind the Meter) performs across 0 counties on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
Tesla Inc. (Behind the Meter) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr). Typical residential meters drew 645.7 kWh/mo ($122.12/mo) in 2025, while its tariff bills residential power at 18.91 c/kWh (-12.44 c/kWh vs California average vs. California), offsetting ~$2,042/yr on an 8 kW array—compare rates directly with Imperial Irrigation District (18.69 c/kWh).
Where Does Tesla Inc. Sit Across US Utility Rates?
National utility tariff curve marking Tesla Inc. at 18.91 c/kWh vs. 18.54 c/kWh US mean. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
How Does Tesla Inc. Rank Across Cost & Reliability?
Relative ranking of Tesla Inc. on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
What Do EIA-861 Benchmarks Show for Tesla Inc.?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Tesla Inc. in California. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
18.91 c/kWh (-12.44 vs CA)
Commercial avg: 13.21 c/kWh; est. residential bill $122.12/mo.
358.3 min/yr (CA Avg)
Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.
11.6 Years @ 18.91 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,042/yr at 1,350 kWh/kW.
125,519 Customers · 0 Counties
Serves 0 counties in California; state FEMA declarations (2015-2026): 161.
Tesla Inc. Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1891 = $2,042/yr
EIA-861 2025 Utility ID 57313: Rate=18.91 c/kWh, Cust=125,519.
Result: 11.6 yr 8 kW cash payback at 18.91 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Tesla Inc.?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Tesla Inc.. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
| EIA Utility ID & BA Code | ID 57313 · BANC |
|---|---|
| State & Ownership Type | CA · Behind the Meter |
| Retail Electricity Rates | 18.91 c/kWh Res · 13.21 c Comm |
| Avg Monthly Usage & Bill | 645.7 kWh/mo ($122.12/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
Which Peer Electric Utilities Operate in CA?
Nearby California electric utilities of comparable customer size led by Imperial Irrigation District (18.69 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Imperial Irrigation District | 18.69 c | 113.9 min | 11,728 | 142,916 |
| City of Anaheim - (CA) | 19.37 c | 31.9 min | 5,351 | 107,148 |
| Pioneer Community Energy | 13.88 c | — | 0 | 145,198 |
| Modesto Irrigation District | 23.03 c | 36.3 min | 11,986 | 104,671 |
What Should Tesla Inc. Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Tesla Inc. (Behind the Meter, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Annual snapshot caveat: Tesla Inc. (Behind the Meter) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
- Export credit rules: check Tesla Inc.'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.
Tesla Inc. Solar & Battery Evaluators
Compare your actual Tesla Inc. monthly kWh statement against 18.91 c/kWh and verify current export tariffs in CA.
Tesla Inc. Outage & Generator Planners
Use Tesla Inc.'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Tesla Inc. (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
What is Tesla Inc.'s residential electricity rate and 2026 solar payback?
Tesla Inc. averages 18.91 c/kWh (-12.44 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,042/yr (11.6-year payback).
How reliable is Tesla Inc. compared to peer California utilities?
Tesla Inc. did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with Imperial Irrigation District (18.69 c/kWh) across California.
Which counties and customers does Tesla Inc. serve in California?
EIA-861 filings list 125,519 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Tesla Inc..
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)