Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Imperial Irrigation District (CA) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Imperial Irrigation District (EIA ID 9216, CA) serves 142,916 customers at 18.69 c/kWh (-12.66 c/kWh vs California average) with 113.9 min/yr SAIDI (1.9 hrs/yr) with 11,728 net-metered residential solar systems (8.21% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
9216
Res. Rate
18.69 c/kWh
SAIDI (All Events)
113.9 min/yr
Net-Metered PV
11,728 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Imperial Irrigation District Compare on Tariffs and Reliability?

EIA-861 rate delta (-12.66 c/kWh vs California average), customer scale (142,916), and 2026 solar payback benchmarks for Imperial Irrigation District.

Ranked #1,694 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 14.7% of peers), Imperial Irrigation District serves 142,916 accounts in California (Political Subdivision). Commercial power averages 18.24 c/kWh. It recorded 113.9 SAIDI outage minutes (1.9 hrs/yr, rank #258 of 751 reporting utilities), with 11,728 net-metered residential solar systems (8.21% customer adoption).

Where Does Imperial Irrigation District Sit Across US Utility Rates?

Positions Imperial Irrigation District (18.69 c/kWh) across 1,989 US electric utility residential tariffs. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Imperial Irrigation District Residential Tariff vs 1,989 US UtilitiesPositions Imperial Irrigation District's 18.69 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhImperial Irrigatio: 18.69 c

How Does Imperial Irrigation District Rank Across Cost & Reliability?

Percentile placement of Imperial Irrigation District across retail kWh electricity cost and IEEE grid reliability outage metrics. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Imperial Irrigation District Grid & Tariff BenchmarksShows where Imperial Irrigation District ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate18.69 c/kWhAnnual SAIDI113.9 min/yrMajor-Storm Share50.7%

What Do EIA-861 Benchmarks Show for Imperial Irrigation District?

Four key EIA-861 rate, outage, and solar payback benchmarks for Imperial Irrigation District (Political Subdivision) in California. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Lowest Rate #1,694 / 1,989

18.69 c/kWh (-12.66 vs CA)

Commercial avg: 18.24 c/kWh; Industrial: 18.59 c/kWh; est. residential bill $202.30/mo.

Reliability #258 / 751

113.9 min/yr (1.9 hrs)

50.7% (57.8 min) from Major Event Days; avg restore 158.2 min (~4.7 kWh @ 1.8 kW).

Post-25D Payback

11.7 Years @ 18.69 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,019/yr at 1,350 kWh/kW.

Distributed PV

11,728 Net-Metered Systems

89.601 MW residential PV (8.21% of customers) across 3 counties; state FEMA declarations (2015-2026): 161.

Imperial Irrigation District Reliability & Solar Offset Calculation

Backup_Energy = (158.2 min / 60) * 1.8 kW = 4.7 kWh/event | Solar_Offset = 10,800 kWh * $0.1869 = $2,019/yr

EIA-861 2025 Utility ID 9216: Rate=18.69 c/kWh, Cust=142,916, SAIDI=113.9 min, PV=11,728.

Result: 1.9 outage hrs/yr; 11.7 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Imperial Irrigation District?

Complete Form EIA-861 filing summary for Imperial Irrigation District (ID 9216) covering sales, PV, and counties. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for Imperial Irrigation District (Utility ID 9216).
EIA Utility ID & BA CodeID 9216 · IID
State & Ownership TypeCA · Political Subdivision
Retail Electricity Rates18.69 c/kWh Res · 18.24 c Comm · 18.59 c Ind
Avg Monthly Usage & Bill1,082.7 kWh/mo ($202.30/mo est.)
SAIDI (All Events w/ MED)113.9 min/yr (1.9 hrs/yr)
SAIDI (Without Major Events)56.1 min/yr (Storm share: 50.7%)
SAIFI & CAIDI (Per-Outage Avg)0.72 /yr · 158.2 min restore
Residential Net-Metered PV11,728 systems (89.601 MW)
Counties Served (Sample)3 counties (Imperial, Riverside, San Diego)

Which Peer Electric Utilities Operate in CA?

Compare Imperial Irrigation District directly with Pioneer Community Energy and nearby California electric utilities by customer base. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Pioneer Community Energy 13.88 c — 0 145,198
Orange County Power Authority 12.92 c — 0 155,559
Tesla Inc. 18.91 c — 0 125,519
City of Anaheim - (CA) 19.37 c 31.9 min 5,351 107,148
What to Check & Best-Fit Scenarios

What Should Imperial Irrigation District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Imperial Irrigation District (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether Imperial Irrigation District acts as a wires-only TDU or bundled utility in CA.
  • Transformer limits: Imperial Irrigation District interconnection engineering still checks neighborhood transformer kVA regardless of 113.9 SAIDI.

Imperial Irrigation District Solar & Battery Evaluators

Compare your actual Imperial Irrigation District monthly kWh statement against 18.69 c/kWh and verify current export tariffs in CA.

Imperial Irrigation District Outage & Generator Planners

Use Imperial Irrigation District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Imperial Irrigation District (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

What is Imperial Irrigation District's residential electricity rate and 2026 solar payback?

Imperial Irrigation District averages 18.69 c/kWh (-12.66 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,019/yr (11.7-year payback).

How reliable is Imperial Irrigation District compared to peer California utilities?

Imperial Irrigation District recorded 113.9 SAIDI outage minutes (1.9 hrs/yr, rank #258 of 751 reporting utilities); compare rates and outage history directly with Pioneer Community Energy (13.88 c/kWh) across California.

Which counties and customers does Imperial Irrigation District serve in California?

EIA-861 filings list 142,916 customers across 3 counties including Imperial, Riverside, San Diego, with 11,728 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Imperial Irrigation District.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.