Skip to main content
WireAndSun
Calculators
CEC Grid-Support Inverter

Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} — CEC Inverter Specifications

Manufacturer: Shenzhen Sinexcel Electric Co Ltd Registry: CEC Verified Engineering Specification

Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} outputs 30,020 W AC at 480 V, 3-phase (36.1 A continuous, 50 A OCPD), ranking #1,333 of 2,343 CEC inverters at 96.62% efficiency with a 350-750 V MPPT window and 750 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

AC Output (Paco)
30,020 W
AC Voltage
480 V, 3-phase
Min PV Breaker
50 A (8 AWG Cu)
CEC Efficiency
96.62%
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Does Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} Compare Against Peer CEC Listings?

Breaker sizing (50 A), 8 AWG Cu wire rules, and DC input limits for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}.

For NEC 705.12 solar interconnection, Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} outputs 36.1 A continuous AC at 480 V, 3-phase and needs a 50 A backfeed breaker on 8 AWG Cu (75 C). Commercial 480 V, 3-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (480V) or NEC 705.11 supply-side tap. Conversion efficiency scores 96.62% (#1,333 of 2,343, -0.20 pts vs overall CEC median).

Where Does Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} Fall Across Listed CEC Models?

Output power comparison showing where Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} sits among all 2,343 CEC-listed grid-support inverters.

AC Power Distribution Across Listed CEC Inverters (up to 25 kW)Shows where Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} (30,020 W AC) sits across CEC inverters. 190-2258 W AC: 584 entries1902258-4325 W AC: 158 entries4325-6392 W AC: 259 entries6392-8460 W AC: 270 entries63928460-10528 W AC: 258 entries10528-12595 W AC: 116 entries12595-14662 W AC: 17 entries1259514662-16730 W AC: 37 entries16730-18798 W AC: 7 entries18798-20865 W AC: 11 entries1879820865-22932 W AC: 5 entries22932-25000 W AC: 26 entries22932Median 7,680 W ACShenzhen Sinexcel : 30,020 W

What Dataset Percentiles Define Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Relative ranking of Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} on continuous AC power, CEC weighted efficiency, and OCPD breaker current.

Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} Technical ThresholdsPercentile comparison for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} AC output, weighted CEC efficiency, and OCPD sizing. 0% (Low)50% Median100% (Top)Rated AC Output30,020 WCEC Efficiency96.62%Backfeed Breaker50 A

What Do the Dataset Ranks Show for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Snapshot of Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} efficiency rank (#1,333), OCPD breaker size, MPPT span, and busbar verdict.

Eff #1,333 / 2,343

96.62% CEC Weighted Efficiency

-1.40 pts vs the 98.02% 480 V median; overall power rank #551 (30,020 W, top 23.5%; higher than 76.5% of peers).

NEC 705.12 Check

50 A Required Backfeed OCPD

125% x 36.1 A = 45.1 A -> 50 A standard OCPD using 8 AWG Cu (75 C).

MPPT Window

350 V - 750 V (Max 750 V DC)

Tracking span of 400.0 V; listed since 2021-10-01 (grid-tied PV inverter).

Commercial / 3-Phase Fit

PASS (120% Commercial Busbar)

Evaluated for 480 V, 3-phase switchgear (200A Bus / 200A Main (480V) to 1,200A Bus / 1,200A Main (480V)) under NEC 705.12 / 705.11.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 30020.0W / 480 V 3-phase -> 36.1 A | Breaker >= 1.25 * 36.1 = 45.1 A -> 50 A

CEC Inverters.csv for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}: Paco=30020.0 W, Vac=480 V, Vdcmax=750.0 V, Eff=96.62%.

Result: Min 50 A breaker & 8 AWG Cu (75 C); 1,200A Bus / 1,200A Main (480V): PASS (120% Commercial Busbar).

What Are the Published CEC Specifications for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Complete California Energy Commission grid-support inverter ratings and hybrid battery capabilities for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}.

Official California Energy Commission (NREL SAM) test parameters for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}.
ParameterMeasured / Listed ValueEngineering Significance
Max Continuous AC Power (Paco) 30,020 W Determines required backfeed OCPD size via 125% continuous rule
Nominal AC Voltage (Vac) 480 V, 3-phase 240V split-phase residential vs. 208V/480V/MV commercial
Max DC Input Voltage (Vdcmax) 750 V Hard ceiling for cold-weather PV string Voc under NEC 690.7
MPPT Operating Range 350 V - 750 V Optimal DC string Vmp window for full power harvest
Max Input DC Current (Idcmax) 51.7844 A Used to verify parallel string combiner limits
CEC Weighted Efficiency 96.62% Calculated AC/DC conversion ratio from CEC test protocol
CEC Listing Date & Hybrid 2021-10-01 / Hybrid: No (Grid-Tied PV) Utility interconnection approval metadata

What Switchgear Limits Apply to Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} (480 V, 3-phase)?

NEC 705.12(B)(3)(2) backfeed compliance table for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} at 480 V, 3-phase.

Evaluates Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} (50 A required OCPD at 480 V, 3-phase) across standard distribution busbars.
Switchboard / Interconnect120% Max BackfeedRequired PV OCPDCompliance Verdict
200A Bus / 200A Main (480V) 40 A 50 A Supply-Side Tap (705.11) / Dedicated Switchboard
400A Bus / 400A Main (480V) 80 A 50 A PASS (120% Commercial Busbar)
600A Bus / 600A Main (480V) 120 A 50 A PASS (120% Commercial Busbar)
800A Bus / 800A Main (480V) 160 A 50 A PASS (120% Commercial Busbar)
1,200A Bus / 1,200A Main (480V) 240 A 50 A PASS (120% Commercial Busbar)

Which CEC PV Module Strings Pair With Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Minimum and maximum series solar module strings fitting Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} MPPT and 750 V limits.

Sampled CEC PV modules aligned within 350.0-750.0 V MPPT and 750.0 V max DC at -10 C.
CEC ModuleSTC (W)-10 C VocValid String RangeMax String DC
AXITEC AC-590TGB/144TS 590.0 W 56.24 V 9 to 13 panels 7.67 kW
Aptos Solar Technology LLC DNA-108-MFN10-440W 440.0 W 42.15 V 11 to 17 panels 7.48 kW
Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF 425.0 W 44.75 V 11 to 16 panels 6.8 kW
CSI Solar Co Ltd CS6P-200P 200.0 W 40.6 V 13 to 18 panels 3.6 kW

Which Competing Grid-Support Inverters Compare to Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Peer 480 V, 3-phase CEC inverters near 30,020 W AC output such as Canadian Solar Inc: CSI-30KTL-GS-FL {480V}.

Alternative CEC inverters at comparable AC output power and voltage class.
Alternative InverterAC OutputDeltaVacMax DCCEC Eff
Canadian Solar Inc: CSI-30KTL-GS-FL {480V}
Canadian Solar Inc
30,000 W -20 W 480.0 V 780.0 V 97.83%
CSI Solar Co Ltd: CSI-30KTL-GS-FLB {480V}
CSI Solar Co Ltd
30,000 W -20 W 480.0 V 780.0 V 97.88%
CE+T America Inc: 30C {480V}
CE+T America Inc
29,990 W -30 W 480.0 V 850.0 V 95.24%
CE+T America Inc: 30C3 {480V}
CE+T America Inc
29,990 W -30 W 480.0 V 850.0 V 95.24%
What to Check & Best-Fit Scenarios

What Are the Interconnection Limits and Best-Fit Uses for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}?

Check Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} (30,020 W AC, 50 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

  • Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
  • Busbar 120% limit: Commercial 480 V, 3-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (480V) or NEC 705.11 supply-side tap.
  • Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 750 V DC on Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V}.

Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} Panel & Wire Spec

Size 75 C copper conductors at 8 AWG Cu on a 50 A OCPD breaker (36.1 A continuous).

Alternative Inverter Comparison

Compare efficiency (96.62%) and MPPT window (350-750 V) directly against Canadian Solar Inc: CSI-30KTL-GS-FL {480V} (30,000 W).

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} by Shenzhen Sinexcel Electric Co Ltd covering breaker sizing, MPPT limits, and 480 V, 3-phase interconnection.

What breaker and wire size does Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} require?

At 30,020 W continuous AC (480 V, 3-phase), continuous current is 36.1 A; 125% NEC 690.8/705.12 sizing requires a 50 A breaker and 8 AWG Cu (75 C) wire.

What commercial switchgear or feeder sizing does Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} require?

At 30,020 W AC and 480 V, 3-phase, continuous line current is 36.1 A, requiring a 50 A OCPD and 1,200A Bus / 1,200A Main (480V) or NEC 705.11 interconnection.

How does Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} compare to Canadian Solar Inc: CSI-30KTL-GS-FL {480V}?

Shenzhen Sinexcel Electric Co Ltd: PWS2-30K-NA {480V} delivers 30,020 W AC at 96.62% CEC efficiency with a 750 V DC ceiling, while Canadian Solar Inc: CSI-30KTL-GS-FL {480V} outputs 30,000 W at 480 V, 3-phase.

Sources

  1. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.