Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} outputs 220,432 W AC at 690 V, 3-phase (184.4 A continuous, 250 A OCPD), ranking #532 of 2,343 CEC inverters at 97.54% efficiency with a 1,056-1,346 V MPPT window and 1,346 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- AC Output (Paco)
- 220,432 W
- AC Voltage
- 690 V, 3-phase
- Min PV Breaker
- 250 A (parallel Cu feeders)
- CEC Efficiency
- 97.54%
How Does Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} Compare Against Peer CEC Listings?
NEC 705.12 breaker requirements, efficiency placement, and 690 V, 3-phase grid-support overview for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}.
Rated at 220,432 W AC (184.4 A continuous), Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} ranks #532 of 2,343 CEC units at 97.54% efficiency (-0.63 pts vs the 98.17% 690 V median). Minimum 75 C copper conductor sizing for its 250 A circuit is parallel Cu feeders per NEC Table 310.16. Cold-weather string Voc must remain under 1,346 V DC at record local winter lows.
Where Does Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} Fall Across Listed CEC Models?
Marks Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} (220,432 W AC) across the California Energy Commission inverter AC capacity distribution.
What Dataset Percentiles Define Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}?
Benchmarks Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} continuous AC output, 97.54% CEC weighted efficiency, and 250 A OCPD breaker demand.
What Do the Dataset Ranks Show for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}?
Four key NEC 705.12 and California Energy Commission metrics defining Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} by Shenzhen Cubenergy Co Ltd.
97.54% CEC Weighted Efficiency
-0.63 pts vs the 98.17% 690 V median; overall power rank #240 (220,432 W, top 10.3%; higher than 89.7% of peers).
250 A Required Backfeed OCPD
125% x 184.4 A = 230.5 A -> 250 A standard OCPD using parallel Cu feeders (75 C).
1,056 V - 1,346 V (Max 1,346 V DC)
Tracking span of 290.0 V; active in CEC directory (grid-tied PV inverter).
Supply-Side Tap (705.11) / Dedicated Switchboard
Evaluated for 690 V, 3-phase switchgear (200A Bus / 200A Main (690V) to 1,200A Bus / 1,200A Main (690V)) under NEC 705.12 / 705.11.
NEC 705.12 Backfeed OCPD & 120% Busbar Formula
I_cont = 220432.0W / 690 V 3-phase -> 184.4 A | Breaker >= 1.25 * 184.4 = 230.5 A -> 250 A
CEC Inverters.csv for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}: Paco=220432.0 W, Vac=690 V, Vdcmax=1346.0 V, Eff=97.54%.
Result: Min 250 A breaker & parallel Cu feeders (75 C); 1,200A Bus / 1,200A Main (690V): Supply-Side Tap (705.11) / Dedicated Switchboard.
What Are the Published CEC Specifications for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}?
Official laboratory CEC ratings, MPPT operating window, and DC voltage bounds recorded for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}.
| Parameter | Measured / Listed Value | Engineering Significance |
|---|---|---|
| Max Continuous AC Power (Paco) | 220,432 W | Determines required backfeed OCPD size via 125% continuous rule |
| Nominal AC Voltage (Vac) | 690 V, 3-phase | 240V split-phase residential vs. 208V/480V/MV commercial |
| Max DC Input Voltage (Vdcmax) | 1,346 V | Hard ceiling for cold-weather PV string Voc under NEC 690.7 |
| MPPT Operating Range | 1,056 V - 1,346 V | Optimal DC string Vmp window for full power harvest |
| Max Input DC Current (Idcmax) | 188.49 A | Used to verify parallel string combiner limits |
| CEC Weighted Efficiency | 97.54% | Calculated AC/DC conversion ratio from CEC test protocol |
| Inverter Topology | Hybrid: No (Grid-Tied PV) | CEC Solar Equipment List grid-support certification |
What Switchgear Limits Apply to Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} (690 V, 3-phase)?
Evaluates Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} (250 A OCPD) across standard 100 A to 225 A busbars or commercial switchboards.
| Switchboard / Interconnect | 120% Max Backfeed | Required PV OCPD | Compliance Verdict |
|---|---|---|---|
| 200A Bus / 200A Main (690V) | 40 A | 250 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 400A Bus / 400A Main (690V) | 80 A | 250 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 600A Bus / 600A Main (690V) | 120 A | 250 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 800A Bus / 800A Main (690V) | 160 A | 250 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
| 1,200A Bus / 1,200A Main (690V) | 240 A | 250 A | Supply-Side Tap (705.11) / Dedicated Switchboard |
Which Competing Grid-Support Inverters Compare to Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}?
Competing CEC grid-support inverters near 220,432 W AC and 690 V, 3-phase, led by SINENG ELECTRIC CO LTD: EH-0200-HA-M-US {690V}.
| Alternative Inverter | AC Output | Delta | Vac | Max DC | CEC Eff |
|---|---|---|---|---|---|
| SINENG ELECTRIC CO LTD: EH-0200-HA-M-US {690V} SINENG ELECTRIC CO LTD |
220,432 W | Tie (0 W) | 690.0 V | 1346.0 V | 97.54% |
| CSI Solar Co Ltd: CSEC-215K-T6901A-U {690V} CSI Solar Co Ltd |
215,937 W | -4495 W | 690.0 V | 1500.0 V | 98.38% |
| Sungrow Power Supply Co Ltd: SC210HX-US {690V} Sungrow Power Supply Co Ltd |
212,078 W | -8354 W | 690.0 V | 1500.0 V | 98.49% |
| SHENZHEN CLOU ELECTRONICS CO LTD: CL215HX-IEC/UL {690V} SHENZHEN CLOU ELECTRONICS CO LTD |
236,841 W | +16409 W | 690.0 V | 1500.0 V | 98.42% |
What Are the Interconnection Limits and Best-Fit Uses for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}?
Check Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} (220,432 W AC, 250 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.
- Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
- Busbar 120% limit: Commercial 690 V, 3-phase switchgear interconnection uses 1,200A Bus / 1,200A Main (690V) or NEC 705.11 supply-side tap.
- Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 1,346 V DC on Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V}.
Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} Panel & Wire Spec
Size 75 C copper conductors at parallel Cu feeders on a 250 A OCPD breaker (184.4 A continuous).
Alternative Inverter Comparison
Compare efficiency (97.54%) and MPPT window (1,056-1,346 V) directly against SINENG ELECTRIC CO LTD: EH-0200-HA-M-US {690V} (220,432 W).
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} by Shenzhen Cubenergy Co Ltd covering breaker sizing, MPPT limits, and 690 V, 3-phase interconnection.
What breaker and wire size does Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} require?
At 220,432 W continuous AC (690 V, 3-phase), continuous current is 184.4 A; 125% NEC 690.8/705.12 sizing requires a 250 A breaker and parallel Cu feeders (75 C) wire.
What commercial switchgear or feeder sizing does Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} require?
At 220,432 W AC and 690 V, 3-phase, continuous line current is 184.4 A, requiring a 250 A OCPD and 1,200A Bus / 1,200A Main (690V) or NEC 705.11 interconnection.
How does Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} compare to SINENG ELECTRIC CO LTD: EH-0200-HA-M-US {690V}?
Shenzhen Cubenergy Co Ltd: EH-0200-HA-M-US {690V} delivers 220,432 W AC at 97.54% CEC efficiency with a 1,346 V DC ceiling, while SINENG ELECTRIC CO LTD: EH-0200-HA-M-US {690V} outputs 220,432 W at 690 V, 3-phase.
Sources
- CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)