Tesla Inc. (EIA ID 57313, UT) serves 1 customer at 17.27 c/kWh (+4.25 c/kWh vs Utah average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 57313
- Res. Rate
- 17.27 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Tesla Inc. Compare on Tariffs and Reliability?
Solar payback, residential tariff (17.27 c/kWh), and outage history inside Tesla Inc. territory. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
Homeowners inside Tesla Inc.'s Utah footprint (0 counties) face 17.27 c/kWh benchmark pricing (-1.27 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 12.7 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 117.0 min/yr).
Where Does Tesla Inc. Sit Across US Utility Rates?
Benchmarking Tesla Inc.'s 17.27 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
How Does Tesla Inc. Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Tesla Inc. across Utah utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
What Do EIA-861 Benchmarks Show for Tesla Inc.?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Tesla Inc. in 2025. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
17.27 c/kWh (+4.25 vs UT)
Commercial avg: 12.62 c/kWh; est. residential bill $158.33/mo.
117.0 min/yr (UT Avg)
Utility did not file separate IEEE SAIDI in 2025; Utah customer-weighted SAIDI is 117.0 min/yr.
12.7 Years @ 17.27 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,865/yr at 1,350 kWh/kW.
1 Customer · 0 Counties
Serves 0 counties in Utah; state FEMA declarations (2015-2026): 30.
Tesla Inc. Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1727 = $1,865/yr
EIA-861 2025 Utility ID 57313: Rate=17.27 c/kWh, Cust=1.
Result: 12.7 yr 8 kW cash payback at 17.27 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Tesla Inc.?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 57313. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
| EIA Utility ID & BA Code | ID 57313 · PACE |
|---|---|
| State & Ownership Type | UT · Behind the Meter |
| Retail Electricity Rates | 17.27 c/kWh Res · 12.62 c Comm |
| Avg Monthly Usage & Bill | 916.7 kWh/mo ($158.33/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
Which Peer Electric Utilities Operate in UT?
Benchmark Tesla Inc. directly against Mt Wheeler Power, Inc and peer Utah retail electric power providers. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Mt Wheeler Power, Inc | 10.51 c | — | 0 | 212 |
| Raft Rural Elec Coop Inc | 11.32 c | — | 0 | 386 |
| Wells Rural Electric Co | 10.81 c | — | 0 | 508 |
| Sunrun Inc. | 15.62 c | — | 0 | 715 |
What Should Tesla Inc. Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Tesla Inc. (Behind the Meter, UT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Tesla Inc. (UT) shift real bills away from 17.27 c/kWh.
- Outage clustering: Major Event Days skew Tesla Inc. annual minutes differently than routine non-storm reliability.
Tesla Inc. Solar & Battery Evaluators
Compare your actual Tesla Inc. monthly kWh statement against 17.27 c/kWh and verify current export tariffs in UT.
Tesla Inc. Outage & Generator Planners
Use Tesla Inc.'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Tesla Inc. (Utah) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
What is Tesla Inc.'s residential electricity rate and 2026 solar payback?
Tesla Inc. averages 17.27 c/kWh (+4.25 c/kWh vs Utah average vs. Utah). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,865/yr (12.7-year payback).
How reliable is Tesla Inc. compared to peer Utah utilities?
Tesla Inc. did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 117.0 min/yr); compare rates and outage history directly with Mt Wheeler Power, Inc (10.51 c/kWh) across Utah.
Which counties and customers does Tesla Inc. serve in Utah?
EIA-861 filings list 1 customer across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Tesla Inc..
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)