Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

McMinnville Electric System (TN) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

McMinnville Electric System (EIA ID 12186, TN) serves 6,702 customers at 12.98 c/kWh (-0.24 c/kWh vs Tennessee average) with 30.7 min/yr SAIDI (0.51 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
12186
Res. Rate
12.98 c/kWh
SAIDI (All Events)
30.7 min/yr
Net-Metered PV
Unreported
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does McMinnville Electric System Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.24 c/kWh vs Tennessee average), customer scale (6,702), and 2026 solar payback benchmarks for McMinnville Electric System.

Serving 6,702 customers across 1 county including Warren in Tennessee, McMinnville Electric System (Municipal, Balancing Authority TVA) offers a low 12.98 c/kWh residential rate (-5.56 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 16.8 years without federal 25D. Grid filings show the utility recorded 30.7 SAIDI outage minutes (0.51 hrs/yr, rank #65 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

Where Does McMinnville Electric System Sit Across US Utility Rates?

Positions McMinnville Electric System (12.98 c/kWh) across 1,989 US electric utility residential tariffs. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

McMinnville Electric System Residential Tariff vs 1,989 US UtilitiesPositions McMinnville Electric System's 12.98 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhMcMinnville Electr: 12.98 c

How Does McMinnville Electric System Rank Across Cost & Reliability?

Percentile placement of McMinnville Electric System across retail kWh electricity cost and IEEE grid reliability outage metrics. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

McMinnville Electric System Grid & Tariff BenchmarksShows where McMinnville Electric System ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate12.98 c/kWhAnnual SAIDI30.7 min/yrMajor-Storm Share48.2%

What Do EIA-861 Benchmarks Show for McMinnville Electric System?

Four key EIA-861 rate, outage, and solar payback benchmarks for McMinnville Electric System (Municipal) in Tennessee. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Lowest Rate #646 / 1,989

12.98 c/kWh (-0.24 vs TN)

Commercial avg: 13.67 c/kWh; Industrial: 10.76 c/kWh; est. residential bill $129.05/mo.

Reliability #65 / 751

30.7 min/yr (0.51 hrs)

48.2% (14.8 min) from Major Event Days; avg restore 131.9 min (~4.0 kWh @ 1.8 kW).

Post-25D Payback

16.8 Years @ 12.98 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,402/yr at 1,350 kWh/kW.

Service Territory

6,702 Customers · 1 County

Serves 1 county including Warren in Tennessee; state FEMA declarations (2015-2026): 35.

McMinnville Electric System Reliability & Solar Offset Calculation

Backup_Energy = (131.9 min / 60) * 1.8 kW = 4.0 kWh/event | Solar_Offset = 10,800 kWh * $0.1298 = $1,402/yr

EIA-861 2025 Utility ID 12186: Rate=12.98 c/kWh, Cust=6,702, SAIDI=30.7 min.

Result: 0.51 outage hrs/yr; 16.8 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for McMinnville Electric System?

Complete Form EIA-861 filing summary for McMinnville Electric System (ID 12186) covering sales, PV, and counties. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for McMinnville Electric System (Utility ID 12186).
EIA Utility ID & BA CodeID 12186 · TVA
State & Ownership TypeTN · Municipal
Retail Electricity Rates12.98 c/kWh Res · 13.67 c Comm · 10.76 c Ind
Avg Monthly Usage & Bill994.4 kWh/mo ($129.05/mo est.)
SAIDI (All Events w/ MED)30.7 min/yr (0.51 hrs/yr)
SAIDI (Without Major Events)15.9 min/yr (Storm share: 48.2%)
SAIFI & CAIDI (Per-Outage Avg)0.233 /yr · 131.9 min restore
Residential Net-Metered PVNot reported in 2025 EIA-861
Counties Served (Sample)1 county (Warren)

Which Peer Electric Utilities Operate in TN?

Compare McMinnville Electric System directly with City of Milan - (TN) and nearby Tennessee electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City of Milan - (TN) 13.04 c 12,532.0 min 0 6,908
City of Sweetwater 12.27 c — 0 7,584
Town of Erwin - (TN) 13.14 c — 0 7,669
City of Springfield - (TN) 12.42 c — 0 7,696
What to Check & Best-Fit Scenarios

What Should McMinnville Electric System Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for McMinnville Electric System (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Not a substitute for meter bills: tiered and seasonal kWh blocks inside McMinnville Electric System (TN) shift real bills away from 12.98 c/kWh.
  • Outage clustering: Major Event Days skew McMinnville Electric System annual minutes differently than routine non-storm reliability.

McMinnville Electric System Solar & Battery Evaluators

Compare your actual McMinnville Electric System monthly kWh statement against 12.98 c/kWh and verify current export tariffs in TN.

McMinnville Electric System Outage & Generator Planners

Use McMinnville Electric System's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for McMinnville Electric System (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

What is McMinnville Electric System's residential electricity rate and 2026 solar payback?

McMinnville Electric System averages 12.98 c/kWh (-0.24 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,402/yr (16.8-year payback).

How reliable is McMinnville Electric System compared to peer Tennessee utilities?

McMinnville Electric System recorded 30.7 SAIDI outage minutes (0.51 hrs/yr, rank #65 of 751 reporting utilities); compare rates and outage history directly with City of Milan - (TN) (13.04 c/kWh) across Tennessee.

Which counties and customers does McMinnville Electric System serve in Tennessee?

EIA-861 filings list 6,702 customers across 1 county including Warren, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting McMinnville Electric System.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.