Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Loudon Utilities Board (TN) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Loudon Utilities Board (EIA ID 11222, TN) serves 12,846 customers at 12.24 c/kWh (-0.98 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
11222
Res. Rate
12.24 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
Unreported
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Loudon Utilities Board Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.24 c/kWh), and outage history inside Loudon Utilities Board territory. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Evaluating solar or generator backup under Loudon Utilities Board (Tennessee) starts with its 12.24 c/kWh residential baseline (-0.98 c/kWh vs Tennessee average) and 17.9-year 8 kW cash payback. EIA-861 records show Loudon Utilities Board did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr) across 12,846 accounts.

Where Does Loudon Utilities Board Sit Across US Utility Rates?

Benchmarking Loudon Utilities Board's 12.24 c/kWh residential rate against 1,989 EIA-861 utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Loudon Utilities Board Residential Tariff vs 1,989 US UtilitiesPositions Loudon Utilities Board's 12.24 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhLoudon Utilities B: 12.24 c

How Does Loudon Utilities Board Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Loudon Utilities Board across Tennessee utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Loudon Utilities Board Grid & Tariff BenchmarksShows where Loudon Utilities Board ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate12.24 c/kWh

What Do EIA-861 Benchmarks Show for Loudon Utilities Board?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Loudon Utilities Board in 2025. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Lowest Rate #447 / 1,989

12.24 c/kWh (-0.98 vs TN)

Commercial avg: 12.21 c/kWh; Industrial: 7.12 c/kWh; est. residential bill $156.09/mo.

State Reliability Context

227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

17.9 Years @ 12.24 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,322/yr at 1,350 kWh/kW.

Service Territory

12,846 Customers · 1 County

Serves 1 county including Loudon in Tennessee; state FEMA declarations (2015-2026): 35.

Loudon Utilities Board Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1224 = $1,322/yr

EIA-861 2025 Utility ID 11222: Rate=12.24 c/kWh, Cust=12,846.

Result: 17.9 yr 8 kW cash payback at 12.24 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for Loudon Utilities Board?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 11222. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for Loudon Utilities Board (Utility ID 11222).
EIA Utility ID & BA CodeID 11222 · TVA
State & Ownership TypeTN · Municipal
Retail Electricity Rates12.24 c/kWh Res · 12.21 c Comm · 7.12 c Ind
Avg Monthly Usage & Bill1,275.3 kWh/mo ($156.09/mo est.)
Residential Net-Metered PVNot reported in 2025 EIA-861
Counties Served (Sample)1 county (Loudon)

Which Peer Electric Utilities Operate in TN?

Benchmark Loudon Utilities Board directly against City of Pulaski - (TN) and peer Tennessee retail electric power providers. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City of Pulaski - (TN) 14.1 c 442.5 min 0 12,496
Mountain Electric Coop, Inc 13.09 c 79.3 min 0 12,388
Carroll County - (TN) 12.66 c — 0 12,348
City of Morristown - (TN) 13.4 c 125.8 min 0 13,571
What to Check & Best-Fit Scenarios

What Should Loudon Utilities Board Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Loudon Utilities Board (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether Loudon Utilities Board acts as a wires-only TDU or bundled utility in TN.
  • Transformer limits: Loudon Utilities Board interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

Loudon Utilities Board Solar & Battery Evaluators

Compare your actual Loudon Utilities Board monthly kWh statement against 12.24 c/kWh and verify current export tariffs in TN.

Loudon Utilities Board Outage & Generator Planners

Use Loudon Utilities Board's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Loudon Utilities Board (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

What is Loudon Utilities Board's residential electricity rate and 2026 solar payback?

Loudon Utilities Board averages 12.24 c/kWh (-0.98 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,322/yr (17.9-year payback).

How reliable is Loudon Utilities Board compared to peer Tennessee utilities?

Loudon Utilities Board did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with City of Pulaski - (TN) (14.1 c/kWh) across Tennessee.

Which counties and customers does Loudon Utilities Board serve in Tennessee?

EIA-861 filings list 12,846 customers across 1 county including Loudon, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Loudon Utilities Board.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.