Johnson City - (TN) (EIA ID 9777, TN) serves 72,729 customers at 13.22 c/kWh (equal to Tennessee average) with 100.6 min/yr SAIDI (1.68 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 9777
- Res. Rate
- 13.22 c/kWh
- SAIDI (All Events)
- 100.6 min/yr
- Net-Metered PV
- Unreported
How Does Johnson City - (TN) Compare on Tariffs and Reliability?
How Johnson City - (TN) (Municipal) performs across 4 counties on kWh rates and outage resilience. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
Across 4 counties including Carter, Greene, Sullivan, Johnson City - (TN) bills residential power at 13.22 c/kWh (equal to Tennessee average vs. Tennessee), offsetting ~$1,428/yr on an 8 kW array compared to peer Duck River Elec Member Corp (13.59 c/kWh). With 72,729 customer accounts (Municipal), 2025 Form EIA-861 shows Johnson City - (TN) recorded 100.6 SAIDI outage minutes (1.68 hrs/yr, rank #226 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.
Where Does Johnson City - (TN) Sit Across US Utility Rates?
National utility tariff curve marking Johnson City - (TN) at 13.22 c/kWh vs. 18.54 c/kWh US mean.
How Does Johnson City - (TN) Rank Across Cost & Reliability?
Relative ranking of Johnson City - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
What Do EIA-861 Benchmarks Show for Johnson City - (TN)?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Johnson City - (TN) in Tennessee. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
13.22 c/kWh (equal to TN)
Commercial avg: 12.13 c/kWh; Industrial: 6.01 c/kWh; est. residential bill $156.46/mo.
100.6 min/yr (1.68 hrs)
0.6% (0.6 min) from Major Event Days; avg restore 114.9 min (~3.4 kWh @ 1.8 kW).
16.5 Years @ 13.22 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,428/yr at 1,350 kWh/kW.
72,729 Customers · 4 Counties
Serves 4 counties including Carter, Greene, Sullivan in Tennessee; state FEMA declarations (2015-2026): 35.
Johnson City - (TN) Reliability & Solar Offset Calculation
Backup_Energy = (114.9 min / 60) * 1.8 kW = 3.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1322 = $1,428/yr
EIA-861 2025 Utility ID 9777: Rate=13.22 c/kWh, Cust=72,729, SAIDI=100.6 min.
Result: 1.68 outage hrs/yr; 16.5 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for Johnson City - (TN)?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Johnson City - (TN). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| EIA Utility ID & BA Code | ID 9777 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 13.22 c/kWh Res · 12.13 c Comm · 6.01 c Ind |
| Avg Monthly Usage & Bill | 1,183.9 kWh/mo ($156.46/mo est.) |
| SAIDI (All Events w/ MED) | 100.6 min/yr (1.68 hrs/yr) |
| SAIDI (Without Major Events) | 100.0 min/yr (Storm share: 0.6%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.876 /yr · 114.9 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 4 counties (Carter, Greene, Sullivan, Washington) |
Which Peer Electric Utilities Operate in TN?
Nearby Tennessee electric utilities of comparable customer size led by Duck River Elec Member Corp (13.59 c/kWh).
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Duck River Elec Member Corp | 13.59 c | 190.4 min | 0 | 71,969 |
| City of Clarksville - (TN) | 13.67 c | 117.2 min | 0 | 77,509 |
| City of Lenoir - (TN) | 12.82 c | — | 0 | 63,379 |
| Upper Cumberland E M C | 13.71 c | — | 0 | 45,862 |
What Should Johnson City - (TN) Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Johnson City - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Johnson City - (TN) (TN) shift real bills away from 13.22 c/kWh.
- Outage clustering: Major Event Days skew Johnson City - (TN) annual minutes differently than routine non-storm reliability.
Johnson City - (TN) Solar & Battery Evaluators
Compare your actual Johnson City - (TN) monthly kWh statement against 13.22 c/kWh and verify current export tariffs in TN.
Johnson City - (TN) Outage & Generator Planners
Use Johnson City - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Johnson City - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
What is Johnson City - (TN)'s residential electricity rate and 2026 solar payback?
Johnson City - (TN) averages 13.22 c/kWh (equal to Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,428/yr (16.5-year payback).
How reliable is Johnson City - (TN) compared to peer Tennessee utilities?
Johnson City - (TN) recorded 100.6 SAIDI outage minutes (1.68 hrs/yr, rank #226 of 751 reporting utilities); compare rates and outage history directly with Duck River Elec Member Corp (13.59 c/kWh) across Tennessee.
Which counties and customers does Johnson City - (TN) serve in Tennessee?
EIA-861 filings list 72,729 customers across 4 counties including Carter, Greene, Sullivan, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Johnson City - (TN).
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)