Forked Deer Electric Coop, Inc (EIA ID 40236, TN) serves 8,331 customers at 14.97 c/kWh (+1.75 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (4 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 40236
- Res. Rate
- 14.97 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Forked Deer Electric Coop, Inc Compare on Tariffs and Reliability?
Solar payback, residential tariff (14.97 c/kWh), and outage history inside Forked Deer Electric Coop, Inc territory. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
Homeowners inside Forked Deer Electric Coop, Inc's Tennessee footprint (4 counties including Crockett, Dyer, Haywood) face 14.97 c/kWh benchmark pricing (-3.57 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 14.6 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr).
Where Does Forked Deer Electric Coop, Inc Sit Across US Utility Rates?
Benchmarking Forked Deer Electric Coop, Inc's 14.97 c/kWh residential rate against 1,989 EIA-861 utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
How Does Forked Deer Electric Coop, Inc Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Forked Deer Electric Coop, Inc across Tennessee utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
What Do EIA-861 Benchmarks Show for Forked Deer Electric Coop, Inc?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Forked Deer Electric Coop, Inc in 2025.
14.97 c/kWh (+1.75 vs TN)
Commercial avg: 21.36 c/kWh; est. residential bill $205.49/mo.
227.7 min/yr (TN Avg)
Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.
14.6 Years @ 14.97 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,617/yr at 1,350 kWh/kW.
8,331 Customers · 4 Counties
Serves 4 counties including Crockett, Dyer, Haywood in Tennessee; state FEMA declarations (2015-2026): 35.
Forked Deer Electric Coop, Inc Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1497 = $1,617/yr
EIA-861 2025 Utility ID 40236: Rate=14.97 c/kWh, Cust=8,331.
Result: 14.6 yr 8 kW cash payback at 14.97 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Forked Deer Electric Coop, Inc?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 40236. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
| EIA Utility ID & BA Code | ID 40236 · TVA |
|---|---|
| State & Ownership Type | TN · Cooperative |
| Retail Electricity Rates | 14.97 c/kWh Res · 21.36 c Comm |
| Avg Monthly Usage & Bill | 1,372.4 kWh/mo ($205.49/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 4 counties (Crockett, Dyer, Haywood, Lauderdale) |
Which Peer Electric Utilities Operate in TN?
Benchmark Forked Deer Electric Coop, Inc directly against Benton County and peer Tennessee retail electric power providers. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Benton County | 15.11 c | — | 0 | 8,750 |
| Bolivar Energy Authority | 14.17 c | 564.1 min | 0 | 8,913 |
| City of Springfield - (TN) | 12.42 c | — | 0 | 7,696 |
| Town of Erwin - (TN) | 13.14 c | — | 0 | 7,669 |
What Should Forked Deer Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Forked Deer Electric Coop, Inc (Cooperative, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: Forked Deer Electric Coop, Inc's 14.97 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Forked Deer Electric Coop, Inc system-wide SAIDI averages rural and urban circuits across its TN territory or nearby Benton County.
Forked Deer Electric Coop, Inc Solar & Battery Evaluators
Compare your actual Forked Deer Electric Coop, Inc monthly kWh statement against 14.97 c/kWh and verify current export tariffs in TN.
Forked Deer Electric Coop, Inc Outage & Generator Planners
Use Forked Deer Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Forked Deer Electric Coop, Inc (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Forked Deer Electric Coop, Inc's residential electricity rate and 2026 solar payback?
Forked Deer Electric Coop, Inc averages 14.97 c/kWh (+1.75 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,617/yr (14.6-year payback).
How reliable is Forked Deer Electric Coop, Inc compared to peer Tennessee utilities?
Forked Deer Electric Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with Benton County (15.11 c/kWh) across Tennessee.
Which counties and customers does Forked Deer Electric Coop, Inc serve in Tennessee?
EIA-861 filings list 8,331 customers across 4 counties including Crockett, Dyer, Haywood, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Forked Deer Electric Coop, Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)