Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Columbia Power System - (TN) (TN) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Columbia Power System - (TN) (EIA ID 3855, TN) serves 32,032 customers at 12.73 c/kWh (-0.49 c/kWh vs Tennessee average) with 142.5 min/yr SAIDI (2.38 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
3855
Res. Rate
12.73 c/kWh
SAIDI (All Events)
142.5 min/yr
Net-Metered PV
Unreported
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Columbia Power System - (TN) Compare on Tariffs and Reliability?

How Columbia Power System - (TN) (Municipal) performs across 2 counties on kWh rates and outage resilience. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Across 2 counties including Maury, Williamson, Columbia Power System - (TN) offers a low 12.73 c/kWh residential rate (-5.81 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.2 years without federal 25D compared to peer City of Jackson - (TN) (12.57 c/kWh). With 32,032 customer accounts (Municipal), 2025 Form EIA-861 shows Columbia Power System - (TN) recorded 142.5 SAIDI outage minutes (2.38 hrs/yr, rank #319 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

Where Does Columbia Power System - (TN) Sit Across US Utility Rates?

National utility tariff curve marking Columbia Power System - (TN) at 12.73 c/kWh vs. 18.54 c/kWh US mean.

Columbia Power System - (TN) Residential Tariff vs 1,989 US UtilitiesPositions Columbia Power System - (TN)'s 12.73 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhColumbia Power Sys: 12.73 c

How Does Columbia Power System - (TN) Rank Across Cost & Reliability?

Relative ranking of Columbia Power System - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Columbia Power System - (TN) Grid & Tariff BenchmarksShows where Columbia Power System - (TN) ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate12.73 c/kWhAnnual SAIDI142.5 min/yrMajor-Storm Share39.5%

What Do EIA-861 Benchmarks Show for Columbia Power System - (TN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Columbia Power System - (TN) in Tennessee.

Lowest Rate #566 / 1,989

12.73 c/kWh (-0.49 vs TN)

Commercial avg: 12.2 c/kWh; Industrial: 9.01 c/kWh; est. residential bill $141.30/mo.

Reliability #319 / 751

142.5 min/yr (2.38 hrs)

39.5% (56.3 min) from Major Event Days; avg restore 73.1 min (~2.2 kWh @ 1.8 kW).

Post-25D Payback

17.2 Years @ 12.73 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,375/yr at 1,350 kWh/kW.

Service Territory

32,032 Customers · 2 Counties

Serves 2 counties including Maury, Williamson in Tennessee; state FEMA declarations (2015-2026): 35.

Columbia Power System - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (73.1 min / 60) * 1.8 kW = 2.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1273 = $1,375/yr

EIA-861 2025 Utility ID 3855: Rate=12.73 c/kWh, Cust=32,032, SAIDI=142.5 min.

Result: 2.38 outage hrs/yr; 17.2 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Columbia Power System - (TN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Columbia Power System - (TN). Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for Columbia Power System - (TN) (Utility ID 3855).
EIA Utility ID & BA CodeID 3855 · TVA
State & Ownership TypeTN · Municipal
Retail Electricity Rates12.73 c/kWh Res · 12.2 c Comm · 9.01 c Ind
Avg Monthly Usage & Bill1,109.6 kWh/mo ($141.30/mo est.)
SAIDI (All Events w/ MED)142.5 min/yr (2.38 hrs/yr)
SAIDI (Without Major Events)86.2 min/yr (Storm share: 39.5%)
SAIFI & CAIDI (Per-Outage Avg)1.95 /yr · 73.1 min restore
Residential Net-Metered PVNot reported in 2025 EIA-861
Counties Served (Sample)2 counties (Maury, Williamson)

Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by City of Jackson - (TN) (12.57 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City of Jackson - (TN) 12.57 c 185.5 min 0 32,264
City of Greeneville - (TN) 12.69 c 238.0 min 0 32,686
City of Dickson 13.0 c 391.0 min 0 31,000
Sequachee Valley Electric Coop 13.77 c 304.9 min 0 33,315
What to Check & Best-Fit Scenarios

What Should Columbia Power System - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Columbia Power System - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Tariff structure differs: Columbia Power System - (TN)'s 12.73 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
  • Feeder variation: Columbia Power System - (TN) system-wide SAIDI averages rural and urban circuits across its TN territory or nearby City of Jackson - (TN).

Columbia Power System - (TN) Solar & Battery Evaluators

Compare your actual Columbia Power System - (TN) monthly kWh statement against 12.73 c/kWh and verify current export tariffs in TN.

Columbia Power System - (TN) Outage & Generator Planners

Use Columbia Power System - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Columbia Power System - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

What is Columbia Power System - (TN)'s residential electricity rate and 2026 solar payback?

Columbia Power System - (TN) averages 12.73 c/kWh (-0.49 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,375/yr (17.2-year payback).

How reliable is Columbia Power System - (TN) compared to peer Tennessee utilities?

Columbia Power System - (TN) recorded 142.5 SAIDI outage minutes (2.38 hrs/yr, rank #319 of 751 reporting utilities); compare rates and outage history directly with City of Jackson - (TN) (12.57 c/kWh) across Tennessee.

Which counties and customers does Columbia Power System - (TN) serve in Tennessee?

EIA-861 filings list 32,032 customers across 2 counties including Maury, Williamson, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Columbia Power System - (TN).

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.