City of Eugene - (OR) (EIA ID 6022, OR) serves 90,395 customers at 14.24 c/kWh (-1.22 c/kWh vs Oregon average) with 49.3 min/yr SAIDI (0.82 hrs/yr) with 1,283 net-metered residential solar systems (1.42% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 6022
- Res. Rate
- 14.24 c/kWh
- SAIDI (All Events)
- 49.3 min/yr
- Net-Metered PV
- 1,283 systems
How Does City of Eugene - (OR) Compare on Tariffs and Reliability?
How City of Eugene - (OR) (Municipal) performs across 1 county on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
Across 1 county including Lane, City of Eugene - (OR) bills residential power at 14.24 c/kWh (-1.22 c/kWh vs Oregon average vs. Oregon), offsetting ~$1,538/yr on an 8 kW array compared to peer Central Lincoln People's Ut Dt (11.39 c/kWh). With 90,395 customer accounts (Municipal), 2025 Form EIA-861 shows City of Eugene - (OR) recorded 49.3 SAIDI outage minutes (0.82 hrs/yr, rank #111 of 751 reporting utilities), with 1,283 net-metered residential solar systems (1.42% customer adoption).
Where Does City of Eugene - (OR) Sit Across US Utility Rates?
National utility tariff curve marking City of Eugene - (OR) at 14.24 c/kWh vs. 18.54 c/kWh US mean.
How Does City of Eugene - (OR) Rank Across Cost & Reliability?
Relative ranking of City of Eugene - (OR) on residential electricity pricing and annual IEEE SAIDI outage duration. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
What Do EIA-861 Benchmarks Show for City of Eugene - (OR)?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Eugene - (OR) in Oregon.
14.24 c/kWh (-1.22 vs OR)
Commercial avg: 11.27 c/kWh; Industrial: 6.45 c/kWh; est. residential bill $124.01/mo.
49.3 min/yr (0.82 hrs)
0.0% (0.0 min) from Major Event Days; avg restore 176.0 min (~5.3 kWh @ 1.8 kW).
15.3 Years @ 14.24 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,538/yr at 1,350 kWh/kW.
1,283 Net-Metered Systems
8.764 MW residential PV (1.42% of customers) across 1 county; state FEMA declarations (2015-2026): 84.
City of Eugene - (OR) Reliability & Solar Offset Calculation
Backup_Energy = (176.0 min / 60) * 1.8 kW = 5.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1424 = $1,538/yr
EIA-861 2025 Utility ID 6022: Rate=14.24 c/kWh, Cust=90,395, SAIDI=49.3 min, PV=1,283.
Result: 0.82 outage hrs/yr; 15.3 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for City of Eugene - (OR)?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Eugene - (OR). Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
| EIA Utility ID & BA Code | ID 6022 · BPAT |
|---|---|
| State & Ownership Type | OR · Municipal |
| Retail Electricity Rates | 14.24 c/kWh Res · 11.27 c Comm · 6.45 c Ind |
| Avg Monthly Usage & Bill | 871.1 kWh/mo ($124.01/mo est.) |
| SAIDI (All Events w/ MED) | 49.3 min/yr (0.82 hrs/yr) |
| SAIDI (Without Major Events) | 49.3 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.28 /yr · 176.0 min restore |
| Residential Net-Metered PV | 1,283 systems (8.764 MW) |
| Counties Served (Sample) | 1 county (Lane) |
Which Peer Electric Utilities Operate in OR?
Nearby Oregon electric utilities of comparable customer size led by Central Lincoln People's Ut Dt (11.39 c/kWh).
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Central Lincoln People's Ut Dt | 11.39 c | 515.6 min | 183 | 36,113 |
| Central Electric Coop Inc - (OR) | 10.49 c | — | 900 | 35,385 |
| City of Springfield - (OR) | 8.39 c | 39.9 min | 123 | 30,212 |
| Oregon Trail El Cons Coop, Inc | 10.97 c | — | 130 | 25,995 |
What Should City of Eugene - (OR) Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for City of Eugene - (OR) (Municipal, OR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: City of Eugene - (OR)'s 14.24 c/kWh blended residential rate in OR does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Eugene - (OR) system-wide SAIDI averages rural and urban circuits across its OR territory or nearby Central Lincoln People's Ut Dt.
City of Eugene - (OR) Solar & Battery Evaluators
Compare your actual City of Eugene - (OR) monthly kWh statement against 14.24 c/kWh and verify current export tariffs in OR.
City of Eugene - (OR) Outage & Generator Planners
Use City of Eugene - (OR)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for City of Eugene - (OR) (Oregon) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is City of Eugene - (OR)'s residential electricity rate and 2026 solar payback?
City of Eugene - (OR) averages 14.24 c/kWh (-1.22 c/kWh vs Oregon average vs. Oregon). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,538/yr (15.3-year payback).
How reliable is City of Eugene - (OR) compared to peer Oregon utilities?
City of Eugene - (OR) recorded 49.3 SAIDI outage minutes (0.82 hrs/yr, rank #111 of 751 reporting utilities); compare rates and outage history directly with Central Lincoln People's Ut Dt (11.39 c/kWh) across Oregon.
Which counties and customers does City of Eugene - (OR) serve in Oregon?
EIA-861 filings list 90,395 customers across 1 county including Lane, with 1,283 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Eugene - (OR).
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)