Kay Electric Coop (EIA ID 10012, OK) serves 4,389 customers at 14.82 c/kWh (+1.61 c/kWh vs Oklahoma average) with no standalone IEEE SAIDI filing (5 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 10012
- Res. Rate
- 14.82 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Kay Electric Coop Compare on Tariffs and Reliability?
Solar payback, residential tariff (14.82 c/kWh), and outage history inside Kay Electric Coop territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
Evaluating solar or generator backup under Kay Electric Coop (Oklahoma) starts with its 14.82 c/kWh residential baseline (+1.61 c/kWh vs Oklahoma average) and 14.7-year 8 kW cash payback. EIA-861 records show Kay Electric Coop did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 297.0 min/yr) across 4,389 accounts.
Where Does Kay Electric Coop Sit Across US Utility Rates?
Benchmarking Kay Electric Coop's 14.82 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
How Does Kay Electric Coop Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Kay Electric Coop across Oklahoma utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
What Do EIA-861 Benchmarks Show for Kay Electric Coop?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Kay Electric Coop in 2025. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
14.82 c/kWh (+1.61 vs OK)
Commercial avg: 13.17 c/kWh; Industrial: 6.67 c/kWh; est. residential bill $150.17/mo.
297.0 min/yr (OK Avg)
Utility did not file separate IEEE SAIDI in 2025; Oklahoma customer-weighted SAIDI is 297.0 min/yr.
14.7 Years @ 14.82 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,601/yr at 1,350 kWh/kW.
4,389 Customers · 5 Counties
Serves 5 counties including Garfield, Grant, Kay in Oklahoma; state FEMA declarations (2015-2026): 89.
Kay Electric Coop Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1482 = $1,601/yr
EIA-861 2025 Utility ID 10012: Rate=14.82 c/kWh, Cust=4,389.
Result: 14.7 yr 8 kW cash payback at 14.82 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Kay Electric Coop?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 10012. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| EIA Utility ID & BA Code | ID 10012 · SWPP |
|---|---|
| State & Ownership Type | OK · Cooperative |
| Retail Electricity Rates | 14.82 c/kWh Res · 13.17 c Comm · 6.67 c Ind |
| Avg Monthly Usage & Bill | 1,013.1 kWh/mo ($150.17/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 5 counties (Garfield, Grant, Kay, Noble, Osage) |
Which Peer Electric Utilities Operate in OK?
Benchmark Kay Electric Coop directly against Arkansas Valley Elec Coop Corp and peer Oklahoma retail electric power providers.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Arkansas Valley Elec Coop Corp | 13.75 c | 198.3 min | 47 | 4,272 |
| Empire District Electric Co | 14.93 c | 199.6 min | 44 | 3,951 |
| Alfalfa Electric Coop, Inc | 10.85 c | — | 0 | 2,646 |
| City of Altus - (OK) | 13.09 c | — | 0 | 8,252 |
What Should Kay Electric Coop Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Kay Electric Coop (Cooperative, OK) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- ERCOT / retail choice note or local riders: confirm whether Kay Electric Coop acts as a wires-only TDU or bundled utility in OK.
- Transformer limits: Kay Electric Coop interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.
Kay Electric Coop Solar & Battery Evaluators
Compare your actual Kay Electric Coop monthly kWh statement against 14.82 c/kWh and verify current export tariffs in OK.
Kay Electric Coop Outage & Generator Planners
Use Kay Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Kay Electric Coop (Oklahoma) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
What is Kay Electric Coop's residential electricity rate and 2026 solar payback?
Kay Electric Coop averages 14.82 c/kWh (+1.61 c/kWh vs Oklahoma average vs. Oklahoma). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,601/yr (14.7-year payback).
How reliable is Kay Electric Coop compared to peer Oklahoma utilities?
Kay Electric Coop did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 297.0 min/yr); compare rates and outage history directly with Arkansas Valley Elec Coop Corp (13.75 c/kWh) across Oklahoma.
Which counties and customers does Kay Electric Coop serve in Oklahoma?
EIA-861 filings list 4,389 customers across 5 counties including Garfield, Grant, Kay, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Kay Electric Coop.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)