Clyde Light & Power (EIA ID 3824, OH) serves 2,785 customers at 13.02 c/kWh (-3.88 c/kWh vs Ohio average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 3824
- Res. Rate
- 13.02 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Clyde Light & Power Compare on Tariffs and Reliability?
EIA-861 rate delta (-3.88 c/kWh vs Ohio average), customer scale (2,785), and 2026 solar payback benchmarks for Clyde Light & Power.
Serving 2,785 customers across 1 county including Sandusky in Ohio, Clyde Light & Power (Municipal, Balancing Authority PJM) bills residential power at 13.02 c/kWh (-3.88 c/kWh vs Ohio average vs. Ohio), offsetting ~$1,406/yr on an 8 kW array. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr), with zero residential net-metered PV reported in 2025 filings.
Where Does Clyde Light & Power Sit Across US Utility Rates?
Positions Clyde Light & Power (13.02 c/kWh) across 1,989 US electric utility residential tariffs. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
How Does Clyde Light & Power Rank Across Cost & Reliability?
Percentile placement of Clyde Light & Power across retail kWh electricity cost and IEEE grid reliability outage metrics. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
What Do EIA-861 Benchmarks Show for Clyde Light & Power?
Four key EIA-861 rate, outage, and solar payback benchmarks for Clyde Light & Power (Municipal) in Ohio. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
13.02 c/kWh (-3.88 vs OH)
Commercial avg: 14.84 c/kWh; Industrial: 9.82 c/kWh; est. residential bill $100.69/mo.
205.5 min/yr (OH Avg)
Utility did not file separate IEEE SAIDI in 2025; Ohio customer-weighted SAIDI is 205.5 min/yr.
16.8 Years @ 13.02 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,406/yr at 1,350 kWh/kW.
2,785 Customers · 1 County
Serves 1 county including Sandusky in Ohio; state FEMA declarations (2015-2026): 7.
Clyde Light & Power Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1302 = $1,406/yr
EIA-861 2025 Utility ID 3824: Rate=13.02 c/kWh, Cust=2,785.
Result: 16.8 yr 8 kW cash payback at 13.02 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Clyde Light & Power?
Complete Form EIA-861 filing summary for Clyde Light & Power (ID 3824) covering sales, PV, and counties. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
| EIA Utility ID & BA Code | ID 3824 · PJM |
|---|---|
| State & Ownership Type | OH · Municipal |
| Retail Electricity Rates | 13.02 c/kWh Res · 14.84 c Comm · 9.82 c Ind |
| Avg Monthly Usage & Bill | 773.2 kWh/mo ($100.69/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Sandusky) |
Which Peer Electric Utilities Operate in OH?
Compare Clyde Light & Power directly with Park Power LLC and nearby Ohio electric utilities by customer base. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Park Power LLC | 13.52 c | — | 0 | 2,868 |
| Verde Energy USA | 18.31 c | — | 0 | 2,593 |
| Atlantic Energy LLC | 10.57 c | — | 0 | 3,020 |
| Alpha Gas and Electric, LLC | 14.48 c | — | 0 | 2,508 |
What Should Clyde Light & Power Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Clyde Light & Power (Municipal, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Clyde Light & Power (OH) shift real bills away from 13.02 c/kWh.
- Outage clustering: Major Event Days skew Clyde Light & Power annual minutes differently than routine non-storm reliability.
Clyde Light & Power Solar & Battery Evaluators
Compare your actual Clyde Light & Power monthly kWh statement against 13.02 c/kWh and verify current export tariffs in OH.
Clyde Light & Power Outage & Generator Planners
Use Clyde Light & Power's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Clyde Light & Power (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
What is Clyde Light & Power's residential electricity rate and 2026 solar payback?
Clyde Light & Power averages 13.02 c/kWh (-3.88 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,406/yr (16.8-year payback).
How reliable is Clyde Light & Power compared to peer Ohio utilities?
Clyde Light & Power did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr); compare rates and outage history directly with Park Power LLC (13.52 c/kWh) across Ohio.
Which counties and customers does Clyde Light & Power serve in Ohio?
EIA-861 filings list 2,785 customers across 1 county including Sandusky, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Clyde Light & Power.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)