Orange & Rockland Utils Inc (EIA ID 14154, NY) serves 193,698 customers at 25.01 c/kWh (-1.38 c/kWh vs New York average) with no standalone IEEE SAIDI filing (3 counties served) with 14,015 net-metered residential solar systems (7.24% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 14154
- Res. Rate
- 25.01 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- 14,015 systems
How Does Orange & Rockland Utils Inc Compare on Tariffs and Reliability?
Solar payback, residential tariff (25.01 c/kWh), and outage history inside Orange & Rockland Utils Inc territory. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
Homeowners inside Orange & Rockland Utils Inc's New York footprint (3 counties including Orange, Rockland, Sullivan) face 25.01 c/kWh benchmark pricing (+6.47 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 8.7 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 246.8 min/yr).
Where Does Orange & Rockland Utils Inc Sit Across US Utility Rates?
Benchmarking Orange & Rockland Utils Inc's 25.01 c/kWh residential rate against 1,989 EIA-861 utilities. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
How Does Orange & Rockland Utils Inc Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Orange & Rockland Utils Inc across New York utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
What Do EIA-861 Benchmarks Show for Orange & Rockland Utils Inc?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Orange & Rockland Utils Inc in 2025.
25.01 c/kWh (-1.38 vs NY)
Commercial avg: 11.14 c/kWh; Industrial: 6.4 c/kWh; est. residential bill $193.58/mo.
246.8 min/yr (NY Avg)
Utility did not file separate IEEE SAIDI in 2025; New York customer-weighted SAIDI is 246.8 min/yr.
8.7 Years @ 25.01 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,701/yr at 1,350 kWh/kW.
14,015 Net-Metered Systems
108.988 MW residential PV (7.24% of customers) across 3 counties; state FEMA declarations (2015-2026): 24.
Orange & Rockland Utils Inc Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.2501 = $2,701/yr
EIA-861 2025 Utility ID 14154: Rate=25.01 c/kWh, Cust=193,698, PV=14,015.
Result: 8.7 yr 8 kW cash payback at 25.01 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Orange & Rockland Utils Inc?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 14154. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
| EIA Utility ID & BA Code | ID 14154 · NYIS |
|---|---|
| State & Ownership Type | NY · Investor Owned |
| Retail Electricity Rates | 25.01 c/kWh Res · 11.14 c Comm · 6.4 c Ind |
| Avg Monthly Usage & Bill | 774.1 kWh/mo ($193.58/mo est.) |
| Residential Net-Metered PV | 14,015 systems (108.988 MW) |
| Counties Served (Sample) | 3 counties (Orange, Rockland, Sullivan) |
Which Peer Electric Utilities Operate in NY?
Benchmark Orange & Rockland Utils Inc directly against Central Hudson Gas & Elec Corp and peer New York retail electric power providers.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Central Hudson Gas & Elec Corp | 26.86 c | 290.1 min | 18,214 | 246,232 |
| Constellation NewEnergy, Inc | 11.82 c | — | 0 | 116,811 |
| Rochester Gas & Electric Corp | 20.72 c | — | 3,405 | 302,692 |
| Direct Energy Services | 13.17 c | — | 0 | 83,925 |
What Should Orange & Rockland Utils Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Orange & Rockland Utils Inc (Investor Owned, NY) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: Orange & Rockland Utils Inc's 25.01 c/kWh blended residential rate in NY does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Orange & Rockland Utils Inc system-wide SAIDI averages rural and urban circuits across its NY territory or nearby Central Hudson Gas & Elec Corp.
Orange & Rockland Utils Inc Solar & Battery Evaluators
Compare your actual Orange & Rockland Utils Inc monthly kWh statement against 25.01 c/kWh and verify current export tariffs in NY.
Orange & Rockland Utils Inc Outage & Generator Planners
Use Orange & Rockland Utils Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Orange & Rockland Utils Inc (New York) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Orange & Rockland Utils Inc's residential electricity rate and 2026 solar payback?
Orange & Rockland Utils Inc averages 25.01 c/kWh (-1.38 c/kWh vs New York average vs. New York). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,701/yr (8.7-year payback).
How reliable is Orange & Rockland Utils Inc compared to peer New York utilities?
Orange & Rockland Utils Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 246.8 min/yr); compare rates and outage history directly with Central Hudson Gas & Elec Corp (26.86 c/kWh) across New York.
Which counties and customers does Orange & Rockland Utils Inc serve in New York?
EIA-861 filings list 193,698 customers across 3 counties including Orange, Rockland, Sullivan, with 14,015 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Orange & Rockland Utils Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)