Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Surprise Valley Electrification (EIA ID 18260, NV) serves 6 customers at 13.97 c/kWh (+0.71 c/kWh vs Nevada average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
18260
Res. Rate
13.97 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
Unreported
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Surprise Valley Electrification Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.97 c/kWh), and outage history inside Surprise Valley Electrification territory. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Homeowners inside Surprise Valley Electrification's Nevada footprint (1 county including Washoe) face 13.97 c/kWh benchmark pricing (-4.57 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 15.6 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 127.8 min/yr).

Where Does Surprise Valley Electrification Sit Across US Utility Rates?

Benchmarking Surprise Valley Electrification's 13.97 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Surprise Valley Electrification Residential Tariff vs 1,989 US UtilitiesPositions Surprise Valley Electrification's 13.97 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhSurprise Valley El: 13.97 c

How Does Surprise Valley Electrification Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Surprise Valley Electrification across Nevada utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Surprise Valley Electrification Grid & Tariff BenchmarksShows where Surprise Valley Electrification ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate13.97 c/kWh

What Do EIA-861 Benchmarks Show for Surprise Valley Electrification?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Surprise Valley Electrification in 2025. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #964 / 1,989

13.97 c/kWh (+0.71 vs NV)

Commercial avg: 14.17 c/kWh; Industrial: 28.64 c/kWh; est. residential bill $112.50/mo.

State Reliability Context

127.8 min/yr (NV Avg)

Utility did not file separate IEEE SAIDI in 2025; Nevada customer-weighted SAIDI is 127.8 min/yr.

Post-25D Payback

15.6 Years @ 13.97 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,509/yr at 1,350 kWh/kW.

Service Territory

6 Customers · 1 County

Serves 1 county including Washoe in Nevada; state FEMA declarations (2015-2026): 40.

Surprise Valley Electrification Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1397 = $1,509/yr

EIA-861 2025 Utility ID 18260: Rate=13.97 c/kWh, Cust=6.

Result: 15.6 yr 8 kW cash payback at 13.97 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for Surprise Valley Electrification?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 18260. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for Surprise Valley Electrification (Utility ID 18260).
EIA Utility ID & BA CodeID 18260 · PACW
State & Ownership TypeNV · Cooperative
Retail Electricity Rates13.97 c/kWh Res · 14.17 c Comm · 28.64 c Ind
Avg Monthly Usage & Bill805.6 kWh/mo ($112.50/mo est.)
Residential Net-Metered PVNot reported in 2025 EIA-861
Counties Served (Sample)1 county (Washoe)

Which Peer Electric Utilities Operate in NV?

Benchmark Surprise Valley Electrification directly against Spruce Finance and peer Nevada retail electric power providers. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Spruce Finance 13.21 c — 0 147
Palmetto Solar, LLC 15.56 c — 0 1,468
SunPower Capital, LLC 14.84 c — 0 1,482
Raft Rural Elec Coop Inc 11.28 c — 0 1,568
What to Check & Best-Fit Scenarios

What Should Surprise Valley Electrification Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Surprise Valley Electrification (Cooperative, NV) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Tariff structure differs: Surprise Valley Electrification's 13.97 c/kWh blended residential rate in NV does not isolate peak TOU windows or fixed customer fees.
  • Feeder variation: Surprise Valley Electrification system-wide SAIDI averages rural and urban circuits across its NV territory or nearby Spruce Finance.

Surprise Valley Electrification Solar & Battery Evaluators

Compare your actual Surprise Valley Electrification monthly kWh statement against 13.97 c/kWh and verify current export tariffs in NV.

Surprise Valley Electrification Outage & Generator Planners

Use Surprise Valley Electrification's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Surprise Valley Electrification (Nevada) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

What is Surprise Valley Electrification's residential electricity rate and 2026 solar payback?

Surprise Valley Electrification averages 13.97 c/kWh (+0.71 c/kWh vs Nevada average vs. Nevada). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,509/yr (15.6-year payback).

How reliable is Surprise Valley Electrification compared to peer Nevada utilities?

Surprise Valley Electrification did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 127.8 min/yr); compare rates and outage history directly with Spruce Finance (13.21 c/kWh) across Nevada.

Which counties and customers does Surprise Valley Electrification serve in Nevada?

EIA-861 filings list 6 customers across 1 county including Washoe, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Surprise Valley Electrification.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.