Overton Power District No 5 (EIA ID 14245, NV) serves 15,852 customers at 12.46 c/kWh (-0.80 c/kWh vs Nevada average) with 13.4 min/yr SAIDI (0.22 hrs/yr) with 591 net-metered residential solar systems (3.73% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 14245
- Res. Rate
- 12.46 c/kWh
- SAIDI (All Events)
- 13.4 min/yr
- Net-Metered PV
- 591 systems
How Does Overton Power District No 5 Compare on Tariffs and Reliability?
Solar payback, residential tariff (12.46 c/kWh), and outage history inside Overton Power District No 5 territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
Homeowners inside Overton Power District No 5's Nevada footprint (1 county including Clark) face 12.46 c/kWh benchmark pricing (-6.08 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 17.5 years. Reliability data recorded 13.4 SAIDI outage minutes (0.22 hrs/yr, rank #21 of 751 reporting utilities).
Where Does Overton Power District No 5 Sit Across US Utility Rates?
Benchmarking Overton Power District No 5's 12.46 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
How Does Overton Power District No 5 Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Overton Power District No 5 across Nevada utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
What Do EIA-861 Benchmarks Show for Overton Power District No 5?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Overton Power District No 5 in 2025.
12.46 c/kWh (-0.80 vs NV)
Commercial avg: 11.58 c/kWh; Industrial: 10.9 c/kWh; est. residential bill $142.49/mo.
13.4 min/yr (0.22 hrs)
0.0% (0.0 min) from Major Event Days; avg restore 74.7 min (~2.2 kWh @ 1.8 kW).
17.5 Years @ 12.46 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,346/yr at 1,350 kWh/kW.
591 Net-Metered Systems
8.176 MW residential PV (3.73% of customers) across 1 county; state FEMA declarations (2015-2026): 40.
Overton Power District No 5 Reliability & Solar Offset Calculation
Backup_Energy = (74.7 min / 60) * 1.8 kW = 2.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1246 = $1,346/yr
EIA-861 2025 Utility ID 14245: Rate=12.46 c/kWh, Cust=15,852, SAIDI=13.4 min, PV=591.
Result: 0.22 outage hrs/yr; 17.5 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for Overton Power District No 5?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 14245. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| EIA Utility ID & BA Code | ID 14245 · NEVP |
|---|---|
| State & Ownership Type | NV · Political Subdivision |
| Retail Electricity Rates | 12.46 c/kWh Res · 11.58 c Comm · 10.9 c Ind |
| Avg Monthly Usage & Bill | 1,143.5 kWh/mo ($142.49/mo est.) |
| SAIDI (All Events w/ MED) | 13.4 min/yr (0.22 hrs/yr) |
| SAIDI (Without Major Events) | 13.4 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.18 /yr · 74.7 min restore |
| Residential Net-Metered PV | 591 systems (8.176 MW) |
| Counties Served (Sample) | 1 county (Clark) |
Which Peer Electric Utilities Operate in NV?
Benchmark Overton Power District No 5 directly against Tesla Inc. and peer Nevada retail electric power providers. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Tesla Inc. | 12.54 c | — | 0 | 12,391 |
| Valley Electric Assn, Inc | 15.33 c | 92.9 min | 2,276 | 22,728 |
| City of Boulder City - (NV) | 10.67 c | 345.1 min | 166 | 7,157 |
| Sunrun Inc. | 16.67 c | — | 0 | 24,985 |
What Should Overton Power District No 5 Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Overton Power District No 5 (Political Subdivision, NV) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: Overton Power District No 5's 12.46 c/kWh blended residential rate in NV does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Overton Power District No 5 system-wide SAIDI averages rural and urban circuits across its NV territory or nearby Tesla Inc..
Overton Power District No 5 Solar & Battery Evaluators
Compare your actual Overton Power District No 5 monthly kWh statement against 12.46 c/kWh and verify current export tariffs in NV.
Overton Power District No 5 Outage & Generator Planners
Use Overton Power District No 5's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Overton Power District No 5 (Nevada) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Overton Power District No 5's residential electricity rate and 2026 solar payback?
Overton Power District No 5 averages 12.46 c/kWh (-0.80 c/kWh vs Nevada average vs. Nevada). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,346/yr (17.5-year payback).
How reliable is Overton Power District No 5 compared to peer Nevada utilities?
Overton Power District No 5 recorded 13.4 SAIDI outage minutes (0.22 hrs/yr, rank #21 of 751 reporting utilities); compare rates and outage history directly with Tesla Inc. (12.54 c/kWh) across Nevada.
Which counties and customers does Overton Power District No 5 serve in Nevada?
EIA-861 filings list 15,852 customers across 1 county including Clark, with 591 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Overton Power District No 5.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)