Continental Divide El Coop Inc (EIA ID 4265, NM) serves 20,474 customers at 16.87 c/kWh (+2.02 c/kWh vs New Mexico average) with 234.5 min/yr SAIDI (3.91 hrs/yr) with 142 net-metered residential solar systems (0.69% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 4265
- Res. Rate
- 16.87 c/kWh
- SAIDI (All Events)
- 234.5 min/yr
- Net-Metered PV
- 142 systems
How Does Continental Divide El Coop Inc Compare on Tariffs and Reliability?
How Continental Divide El Coop Inc (Cooperative) performs across 5 counties on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
Across 5 counties including Bernalillo, Cibola, McKinley, Continental Divide El Coop Inc bills residential power at 16.87 c/kWh (+2.02 c/kWh vs New Mexico average vs. New Mexico), offsetting ~$1,822/yr on an 8 kW array compared to peer Central New Mexico El Coop, Inc (17.39 c/kWh). With 20,474 customer accounts (Cooperative), 2025 Form EIA-861 shows Continental Divide El Coop Inc recorded 234.5 SAIDI outage minutes (3.91 hrs/yr, rank #473 of 751 reporting utilities), with 142 net-metered residential solar systems (0.69% customer adoption).
Where Does Continental Divide El Coop Inc Sit Across US Utility Rates?
National utility tariff curve marking Continental Divide El Coop Inc at 16.87 c/kWh vs. 18.54 c/kWh US mean.
How Does Continental Divide El Coop Inc Rank Across Cost & Reliability?
Relative ranking of Continental Divide El Coop Inc on residential electricity pricing and annual IEEE SAIDI outage duration.
What Do EIA-861 Benchmarks Show for Continental Divide El Coop Inc?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Continental Divide El Coop Inc in New Mexico.
16.87 c/kWh (+2.02 vs NM)
Commercial avg: 14.27 c/kWh; Industrial: 6.95 c/kWh; est. residential bill $99.89/mo.
234.5 min/yr (3.91 hrs)
0.0% (0.0 min) from Major Event Days; avg restore 153.3 min (~4.6 kWh @ 1.8 kW).
13.0 Years @ 16.87 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,822/yr at 1,350 kWh/kW.
142 Net-Metered Systems
0.803 MW residential PV (0.69% of customers) across 5 counties; state FEMA declarations (2015-2026): 45.
Continental Divide El Coop Inc Reliability & Solar Offset Calculation
Backup_Energy = (153.3 min / 60) * 1.8 kW = 4.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1687 = $1,822/yr
EIA-861 2025 Utility ID 4265: Rate=16.87 c/kWh, Cust=20,474, SAIDI=234.5 min, PV=142.
Result: 3.91 outage hrs/yr; 13.0 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for Continental Divide El Coop Inc?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Continental Divide El Coop Inc. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
| EIA Utility ID & BA Code | ID 4265 · PNM |
|---|---|
| State & Ownership Type | NM · Cooperative |
| Retail Electricity Rates | 16.87 c/kWh Res · 14.27 c Comm · 6.95 c Ind |
| Avg Monthly Usage & Bill | 592.3 kWh/mo ($99.89/mo est.) |
| SAIDI (All Events w/ MED) | 234.5 min/yr (3.91 hrs/yr) |
| SAIDI (Without Major Events) | 234.5 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.53 /yr · 153.3 min restore |
| Residential Net-Metered PV | 142 systems (0.803 MW) |
| Counties Served (Sample) | 5 counties (Bernalillo, Cibola, McKinley, Sandoval, Valencia) |
Which Peer Electric Utilities Operate in NM?
Nearby New Mexico electric utilities of comparable customer size led by Central New Mexico El Coop, Inc (17.39 c/kWh).
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Central New Mexico El Coop, Inc | 17.39 c | — | 821 | 19,323 |
| Otero County Electric Coop Inc | 19.56 c | — | 1,239 | 16,517 |
| Kit Carson Electric Coop, Inc | 15.68 c | 305.0 min | 451 | 26,286 |
| Jemez Mountains Elec Coop, Inc | 15.76 c | 561.7 min | 641 | 28,185 |
What Should Continental Divide El Coop Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Continental Divide El Coop Inc (Cooperative, NM) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Continental Divide El Coop Inc (NM) shift real bills away from 16.87 c/kWh.
- Outage clustering: Major Event Days skew Continental Divide El Coop Inc annual minutes differently than routine non-storm reliability.
Continental Divide El Coop Inc Solar & Battery Evaluators
Compare your actual Continental Divide El Coop Inc monthly kWh statement against 16.87 c/kWh and verify current export tariffs in NM.
Continental Divide El Coop Inc Outage & Generator Planners
Use Continental Divide El Coop Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Continental Divide El Coop Inc (New Mexico) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Continental Divide El Coop Inc's residential electricity rate and 2026 solar payback?
Continental Divide El Coop Inc averages 16.87 c/kWh (+2.02 c/kWh vs New Mexico average vs. New Mexico). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,822/yr (13.0-year payback).
How reliable is Continental Divide El Coop Inc compared to peer New Mexico utilities?
Continental Divide El Coop Inc recorded 234.5 SAIDI outage minutes (3.91 hrs/yr, rank #473 of 751 reporting utilities); compare rates and outage history directly with Central New Mexico El Coop, Inc (17.39 c/kWh) across New Mexico.
Which counties and customers does Continental Divide El Coop Inc serve in New Mexico?
EIA-861 filings list 20,474 customers across 5 counties including Bernalillo, Cibola, McKinley, with 142 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Continental Divide El Coop Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)