Tishomingo County E P A (EIA ID 18951, MS) serves 10,997 customers at 13.33 c/kWh (-0.70 c/kWh vs Mississippi average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 18951
- Res. Rate
- 13.33 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Tishomingo County E P A Compare on Tariffs and Reliability?
Solar payback, residential tariff (13.33 c/kWh), and outage history inside Tishomingo County E P A territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
Evaluating solar or generator backup under Tishomingo County E P A (Mississippi) starts with its 13.33 c/kWh residential baseline (-0.70 c/kWh vs Mississippi average) and 16.4-year 8 kW cash payback. EIA-861 records show Tishomingo County E P A did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr) across 10,997 accounts.
Where Does Tishomingo County E P A Sit Across US Utility Rates?
Benchmarking Tishomingo County E P A's 13.33 c/kWh residential rate against 1,989 EIA-861 utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
How Does Tishomingo County E P A Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Tishomingo County E P A across Mississippi utilities. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
What Do EIA-861 Benchmarks Show for Tishomingo County E P A?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Tishomingo County E P A in 2025.
13.33 c/kWh (-0.70 vs MS)
Commercial avg: 14.67 c/kWh; Industrial: 5.08 c/kWh; est. residential bill $150.11/mo.
524.4 min/yr (MS Avg)
Utility did not file separate IEEE SAIDI in 2025; Mississippi customer-weighted SAIDI is 524.4 min/yr.
16.4 Years @ 13.33 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,440/yr at 1,350 kWh/kW.
10,997 Customers · 2 Counties
Serves 2 counties including Prentiss, Tishomingo in Mississippi; state FEMA declarations (2015-2026): 34.
Tishomingo County E P A Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1333 = $1,440/yr
EIA-861 2025 Utility ID 18951: Rate=13.33 c/kWh, Cust=10,997.
Result: 16.4 yr 8 kW cash payback at 13.33 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Tishomingo County E P A?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 18951. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
| EIA Utility ID & BA Code | ID 18951 · TVA |
|---|---|
| State & Ownership Type | MS · Cooperative |
| Retail Electricity Rates | 13.33 c/kWh Res · 14.67 c Comm · 5.08 c Ind |
| Avg Monthly Usage & Bill | 1,125.8 kWh/mo ($150.11/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Prentiss, Tishomingo) |
Which Peer Electric Utilities Operate in MS?
Benchmark Tishomingo County E P A directly against Prentiss County Elec Pwr Assn and peer Mississippi retail electric power providers.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Prentiss County Elec Pwr Assn | 11.51 c | — | 0 | 10,994 |
| City of Tupelo - (MS) | 11.8 c | — | 0 | 10,646 |
| Tippah Electric Power Assn | 13.94 c | — | 0 | 10,534 |
| Monroe County Elec Power Assn | 13.15 c | — | 0 | 10,247 |
What Should Tishomingo County E P A Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Tishomingo County E P A (Cooperative, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- ERCOT / retail choice note or local riders: confirm whether Tishomingo County E P A acts as a wires-only TDU or bundled utility in MS.
- Transformer limits: Tishomingo County E P A interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.
Tishomingo County E P A Solar & Battery Evaluators
Compare your actual Tishomingo County E P A monthly kWh statement against 13.33 c/kWh and verify current export tariffs in MS.
Tishomingo County E P A Outage & Generator Planners
Use Tishomingo County E P A's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Tishomingo County E P A (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Tishomingo County E P A's residential electricity rate and 2026 solar payback?
Tishomingo County E P A averages 13.33 c/kWh (-0.70 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,440/yr (16.4-year payback).
How reliable is Tishomingo County E P A compared to peer Mississippi utilities?
Tishomingo County E P A did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr); compare rates and outage history directly with Prentiss County Elec Pwr Assn (11.51 c/kWh) across Mississippi.
Which counties and customers does Tishomingo County E P A serve in Mississippi?
EIA-861 filings list 10,997 customers across 2 counties including Prentiss, Tishomingo, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Tishomingo County E.P.A..
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)