Greenwood Utilities Comm (EIA ID 7651, MS) serves 7,273 customers at 11.42 c/kWh (-2.61 c/kWh vs Mississippi average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 7651
- Res. Rate
- 11.42 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Greenwood Utilities Comm Compare on Tariffs and Reliability?
How Greenwood Utilities Comm (Municipal) performs across 2 counties on kWh rates and outage resilience. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
Greenwood Utilities Comm (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr). Typical residential meters drew 1,097.4 kWh/mo ($125.35/mo) in 2025, while its tariff offers a low 11.42 c/kWh residential rate (-7.12 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 19.1 years without federal 25D—compare rates directly with City of New Albany - (MS) (13.24 c/kWh).
Where Does Greenwood Utilities Comm Sit Across US Utility Rates?
National utility tariff curve marking Greenwood Utilities Comm at 11.42 c/kWh vs. 18.54 c/kWh US mean.
How Does Greenwood Utilities Comm Rank Across Cost & Reliability?
Relative ranking of Greenwood Utilities Comm on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
What Do EIA-861 Benchmarks Show for Greenwood Utilities Comm?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Greenwood Utilities Comm in Mississippi. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
11.42 c/kWh (-2.61 vs MS)
Commercial avg: 10.99 c/kWh; Industrial: 9.25 c/kWh; est. residential bill $125.35/mo.
524.4 min/yr (MS Avg)
Utility did not file separate IEEE SAIDI in 2025; Mississippi customer-weighted SAIDI is 524.4 min/yr.
19.1 Years @ 11.42 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,233/yr at 1,350 kWh/kW.
7,273 Customers · 2 Counties
Serves 2 counties including Carroll, Leflore in Mississippi; state FEMA declarations (2015-2026): 34.
Greenwood Utilities Comm Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1142 = $1,233/yr
EIA-861 2025 Utility ID 7651: Rate=11.42 c/kWh, Cust=7,273.
Result: 19.1 yr 8 kW cash payback at 11.42 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Greenwood Utilities Comm?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Greenwood Utilities Comm. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
| EIA Utility ID & BA Code | ID 7651 · MISO |
|---|---|
| State & Ownership Type | MS · Municipal |
| Retail Electricity Rates | 11.42 c/kWh Res · 10.99 c Comm · 9.25 c Ind |
| Avg Monthly Usage & Bill | 1,097.4 kWh/mo ($125.35/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Carroll, Leflore) |
Which Peer Electric Utilities Operate in MS?
Nearby Mississippi electric utilities of comparable customer size led by City of New Albany - (MS) (13.24 c/kWh).
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| City of New Albany - (MS) | 13.24 c | — | 0 | 8,170 |
| City of Oxford - (MS) | 12.23 c | 137.3 min | 0 | 8,620 |
| City of Columbus - (MS) | 12.84 c | 164.6 min | 0 | 8,852 |
| City of Holly Springs | 12.56 c | — | 0 | 9,398 |
What Should Greenwood Utilities Comm Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Greenwood Utilities Comm (Municipal, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Annual snapshot caveat: Greenwood Utilities Comm (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in MS.
- Export credit rules: check Greenwood Utilities Comm's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.
Greenwood Utilities Comm Solar & Battery Evaluators
Compare your actual Greenwood Utilities Comm monthly kWh statement against 11.42 c/kWh and verify current export tariffs in MS.
Greenwood Utilities Comm Outage & Generator Planners
Use Greenwood Utilities Comm's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Greenwood Utilities Comm (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
What is Greenwood Utilities Comm's residential electricity rate and 2026 solar payback?
Greenwood Utilities Comm averages 11.42 c/kWh (-2.61 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,233/yr (19.1-year payback).
How reliable is Greenwood Utilities Comm compared to peer Mississippi utilities?
Greenwood Utilities Comm did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr); compare rates and outage history directly with City of New Albany - (MS) (13.24 c/kWh) across Mississippi.
Which counties and customers does Greenwood Utilities Comm serve in Mississippi?
EIA-861 filings list 7,273 customers across 2 counties including Carroll, Leflore, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Greenwood Utilities Comm.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)