Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

SEMO Electric Cooperative (MO) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

SEMO Electric Cooperative (EIA ID 16805, MO) serves 10,798 customers at 13.51 c/kWh (+0.21 c/kWh vs Missouri average) with no standalone IEEE SAIDI filing (6 counties served) with 93 net-metered residential solar systems (0.86% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
16805
Res. Rate
13.51 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
93 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does SEMO Electric Cooperative Compare on Tariffs and Reliability?

How SEMO Electric Cooperative (Cooperative) performs across 6 counties on kWh rates and outage resilience. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Across 6 counties including Bollinger, Cape Girardeau, Mississippi, SEMO Electric Cooperative bills residential power at 13.51 c/kWh (+0.21 c/kWh vs Missouri average vs. Missouri), offsetting ~$1,459/yr on an 8 kW array compared to peer Central Missouri Elec Coop Inc (12.63 c/kWh). With 10,798 customer accounts (Cooperative), 2025 Form EIA-861 shows SEMO Electric Cooperative did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr), with 93 net-metered residential solar systems (0.86% customer adoption).

Where Does SEMO Electric Cooperative Sit Across US Utility Rates?

National utility tariff curve marking SEMO Electric Cooperative at 13.51 c/kWh vs. 18.54 c/kWh US mean.

SEMO Electric Cooperative Residential Tariff vs 1,989 US UtilitiesPositions SEMO Electric Cooperative's 13.51 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhSEMO Electric Coop: 13.51 c

How Does SEMO Electric Cooperative Rank Across Cost & Reliability?

Relative ranking of SEMO Electric Cooperative on residential electricity pricing and annual IEEE SAIDI outage duration. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

SEMO Electric Cooperative Grid & Tariff BenchmarksShows where SEMO Electric Cooperative ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate13.51 c/kWh

What Do EIA-861 Benchmarks Show for SEMO Electric Cooperative?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for SEMO Electric Cooperative in Missouri. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #816 / 1,989

13.51 c/kWh (+0.21 vs MO)

Commercial avg: 16.46 c/kWh; Industrial: 8.23 c/kWh; est. residential bill $187.72/mo.

State Reliability Context

466.0 min/yr (MO Avg)

Utility did not file separate IEEE SAIDI in 2025; Missouri customer-weighted SAIDI is 466.0 min/yr.

Post-25D Payback

16.2 Years @ 13.51 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,459/yr at 1,350 kWh/kW.

Distributed PV

93 Net-Metered Systems

0.7 MW residential PV (0.86% of customers) across 6 counties; state FEMA declarations (2015-2026): 23.

SEMO Electric Cooperative Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1351 = $1,459/yr

EIA-861 2025 Utility ID 16805: Rate=13.51 c/kWh, Cust=10,798, PV=93.

Result: 16.2 yr 8 kW cash payback at 13.51 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for SEMO Electric Cooperative?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by SEMO Electric Cooperative. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for SEMO Electric Cooperative (Utility ID 16805).
EIA Utility ID & BA CodeID 16805 · AECI
State & Ownership TypeMO · Cooperative
Retail Electricity Rates13.51 c/kWh Res · 16.46 c Comm · 8.23 c Ind
Avg Monthly Usage & Bill1,389.1 kWh/mo ($187.72/mo est.)
Residential Net-Metered PV93 systems (0.7 MW)
Counties Served (Sample)6 counties (Bollinger, Cape Girardeau, Mississippi, New Madrid, Scott, Stoddard)

Which Peer Electric Utilities Operate in MO?

Nearby Missouri electric utilities of comparable customer size led by Central Missouri Elec Coop Inc (12.63 c/kWh).

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Central Missouri Elec Coop Inc 12.63 c 422.6 min 113 11,259
Macon Electric Coop 15.75 c — 72 10,059
City of Kirkwood - (MO) 14.49 c 176.8 min 58 9,522
Carroll Electric Coop Corp - (AR) 13.81 c 128.9 min 0 12,212
What to Check & Best-Fit Scenarios

What Should SEMO Electric Cooperative Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for SEMO Electric Cooperative (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Tariff structure differs: SEMO Electric Cooperative's 13.51 c/kWh blended residential rate in MO does not isolate peak TOU windows or fixed customer fees.
  • Feeder variation: SEMO Electric Cooperative system-wide SAIDI averages rural and urban circuits across its MO territory or nearby Central Missouri Elec Coop Inc.

SEMO Electric Cooperative Solar & Battery Evaluators

Compare your actual SEMO Electric Cooperative monthly kWh statement against 13.51 c/kWh and verify current export tariffs in MO.

SEMO Electric Cooperative Outage & Generator Planners

Use SEMO Electric Cooperative's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for SEMO Electric Cooperative (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

What is SEMO Electric Cooperative's residential electricity rate and 2026 solar payback?

SEMO Electric Cooperative averages 13.51 c/kWh (+0.21 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,459/yr (16.2-year payback).

How reliable is SEMO Electric Cooperative compared to peer Missouri utilities?

SEMO Electric Cooperative did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr); compare rates and outage history directly with Central Missouri Elec Coop Inc (12.63 c/kWh) across Missouri.

Which counties and customers does SEMO Electric Cooperative serve in Missouri?

EIA-861 filings list 10,798 customers across 6 counties including Bollinger, Cape Girardeau, Mississippi, with 93 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting SEMO Electric Cooperative.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.