Ozark Electric Coop Inc - (MO) (EIA ID 14288, MO) serves 31,915 customers at 15.64 c/kWh (+2.34 c/kWh vs Missouri average) with no standalone IEEE SAIDI filing (9 counties served) with 610 net-metered residential solar systems (1.91% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 14288
- Res. Rate
- 15.64 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- 610 systems
How Does Ozark Electric Coop Inc - (MO) Compare on Tariffs and Reliability?
EIA-861 rate delta (+2.34 c/kWh vs Missouri average), customer scale (31,915), and 2026 solar payback benchmarks for Ozark Electric Coop Inc - (MO).
Serving 31,915 customers across 9 counties including Barry, Christian, Dade in Missouri, Ozark Electric Coop Inc - (MO) (Cooperative, Balancing Authority AECI) bills residential power at 15.64 c/kWh (+2.34 c/kWh vs Missouri average vs. Missouri), offsetting ~$1,689/yr on an 8 kW array. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr), with 610 net-metered residential solar systems (1.91% customer adoption).
Where Does Ozark Electric Coop Inc - (MO) Sit Across US Utility Rates?
Positions Ozark Electric Coop Inc - (MO) (15.64 c/kWh) across 1,989 US electric utility residential tariffs. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
How Does Ozark Electric Coop Inc - (MO) Rank Across Cost & Reliability?
Percentile placement of Ozark Electric Coop Inc - (MO) across retail kWh electricity cost and IEEE grid reliability outage metrics.
What Do EIA-861 Benchmarks Show for Ozark Electric Coop Inc - (MO)?
Four key EIA-861 rate, outage, and solar payback benchmarks for Ozark Electric Coop Inc - (MO) (Cooperative) in Missouri.
15.64 c/kWh (+2.34 vs MO)
Commercial avg: 13.5 c/kWh; Industrial: 9.24 c/kWh; est. residential bill $180.11/mo.
466.0 min/yr (MO Avg)
Utility did not file separate IEEE SAIDI in 2025; Missouri customer-weighted SAIDI is 466.0 min/yr.
14.0 Years @ 15.64 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,689/yr at 1,350 kWh/kW.
610 Net-Metered Systems
6.193 MW residential PV (1.91% of customers) across 9 counties; state FEMA declarations (2015-2026): 23.
Ozark Electric Coop Inc - (MO) Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1564 = $1,689/yr
EIA-861 2025 Utility ID 14288: Rate=15.64 c/kWh, Cust=31,915, PV=610.
Result: 14.0 yr 8 kW cash payback at 15.64 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Ozark Electric Coop Inc - (MO)?
Complete Form EIA-861 filing summary for Ozark Electric Coop Inc - (MO) (ID 14288) covering sales, PV, and counties.
| EIA Utility ID & BA Code | ID 14288 · AECI |
|---|---|
| State & Ownership Type | MO · Cooperative |
| Retail Electricity Rates | 15.64 c/kWh Res · 13.5 c Comm · 9.24 c Ind |
| Avg Monthly Usage & Bill | 1,151.5 kWh/mo ($180.11/mo est.) |
| Residential Net-Metered PV | 610 systems (6.193 MW) |
| Counties Served (Sample) | 9 counties (Barry, Christian, Dade, Greene, Jasper, Lawrence, Newton, Polk, Stone) |
Which Peer Electric Utilities Operate in MO?
Compare Ozark Electric Coop Inc - (MO) directly with Co-Mo Electric Coop Inc and nearby Missouri electric utilities by customer base.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Co-Mo Electric Coop Inc | 14.93 c | 158.1 min | 243 | 31,352 |
| Ozark Border Electric Coop | 12.28 c | — | 122 | 33,262 |
| Intercounty Electric Coop Assn - (MO) | 13.03 c | 707.1 min | 337 | 30,009 |
| Boone Electric Coop | 13.57 c | 66.9 min | 386 | 34,098 |
What Should Ozark Electric Coop Inc - (MO) Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Ozark Electric Coop Inc - (MO) (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Ozark Electric Coop Inc - (MO) (MO) shift real bills away from 15.64 c/kWh.
- Outage clustering: Major Event Days skew Ozark Electric Coop Inc - (MO) annual minutes differently than routine non-storm reliability.
Ozark Electric Coop Inc - (MO) Solar & Battery Evaluators
Compare your actual Ozark Electric Coop Inc - (MO) monthly kWh statement against 15.64 c/kWh and verify current export tariffs in MO.
Ozark Electric Coop Inc - (MO) Outage & Generator Planners
Use Ozark Electric Coop Inc - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Ozark Electric Coop Inc - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Ozark Electric Coop Inc - (MO)'s residential electricity rate and 2026 solar payback?
Ozark Electric Coop Inc - (MO) averages 15.64 c/kWh (+2.34 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,689/yr (14.0-year payback).
How reliable is Ozark Electric Coop Inc - (MO) compared to peer Missouri utilities?
Ozark Electric Coop Inc - (MO) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr); compare rates and outage history directly with Co-Mo Electric Coop Inc (14.93 c/kWh) across Missouri.
Which counties and customers does Ozark Electric Coop Inc - (MO) serve in Missouri?
EIA-861 filings list 31,915 customers across 9 counties including Barry, Christian, Dade, with 610 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Ozark Electric Coop Inc - (MO).
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)