Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Consolidated Electric Coop (MO) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Consolidated Electric Coop (EIA ID 4237, MO) serves 7,698 customers at 13.54 c/kWh (+0.24 c/kWh vs Missouri average) with 232.9 min/yr SAIDI (3.88 hrs/yr) with 70 net-metered residential solar systems (0.91% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
4237
Res. Rate
13.54 c/kWh
SAIDI (All Events)
232.9 min/yr
Net-Metered PV
70 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Consolidated Electric Coop Compare on Tariffs and Reliability?

How Consolidated Electric Coop (Cooperative) performs across 8 counties on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Consolidated Electric Coop (Cooperative) recorded 232.9 SAIDI outage minutes (3.88 hrs/yr, rank #471 of 751 reporting utilities). Typical residential meters drew 1,325.8 kWh/mo ($179.53/mo) in 2025, while its tariff bills residential power at 13.54 c/kWh (+0.24 c/kWh vs Missouri average vs. Missouri), offsetting ~$1,462/yr on an 8 kW array—compare rates directly with City of Poplar Bluff - (MO) (11.06 c/kWh).

Where Does Consolidated Electric Coop Sit Across US Utility Rates?

National utility tariff curve marking Consolidated Electric Coop at 13.54 c/kWh vs. 18.54 c/kWh US mean.

Consolidated Electric Coop Residential Tariff vs 1,989 US UtilitiesPositions Consolidated Electric Coop's 13.54 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhConsolidated Elect: 13.54 c

How Does Consolidated Electric Coop Rank Across Cost & Reliability?

Relative ranking of Consolidated Electric Coop on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Consolidated Electric Coop Grid & Tariff BenchmarksShows where Consolidated Electric Coop ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate13.54 c/kWhAnnual SAIDI232.9 min/yrMajor-Storm Share48.5%

What Do EIA-861 Benchmarks Show for Consolidated Electric Coop?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Consolidated Electric Coop in Missouri. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Lowest Rate #828 / 1,989

13.54 c/kWh (+0.24 vs MO)

Commercial avg: 11.67 c/kWh; Industrial: 10.63 c/kWh; est. residential bill $179.53/mo.

Reliability #471 / 751

232.9 min/yr (3.88 hrs)

48.5% (112.9 min) from Major Event Days; avg restore 197.9 min (~5.9 kWh @ 1.8 kW).

Post-25D Payback

16.1 Years @ 13.54 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,462/yr at 1,350 kWh/kW.

Distributed PV

70 Net-Metered Systems

0.943 MW residential PV (0.91% of customers) across 8 counties; state FEMA declarations (2015-2026): 23.

Consolidated Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (197.9 min / 60) * 1.8 kW = 5.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1354 = $1,462/yr

EIA-861 2025 Utility ID 4237: Rate=13.54 c/kWh, Cust=7,698, SAIDI=232.9 min, PV=70.

Result: 3.88 outage hrs/yr; 16.1 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Consolidated Electric Coop?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Consolidated Electric Coop. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for Consolidated Electric Coop (Utility ID 4237).
EIA Utility ID & BA CodeID 4237 · AECI
State & Ownership TypeMO · Cooperative
Retail Electricity Rates13.54 c/kWh Res · 11.67 c Comm · 10.63 c Ind
Avg Monthly Usage & Bill1,325.8 kWh/mo ($179.53/mo est.)
SAIDI (All Events w/ MED)232.9 min/yr (3.88 hrs/yr)
SAIDI (Without Major Events)120.0 min/yr (Storm share: 48.5%)
SAIFI & CAIDI (Per-Outage Avg)1.177 /yr · 197.9 min restore
Residential Net-Metered PV70 systems (0.943 MW)
Counties Served (Sample)8 counties (Audrain, Boone, Callaway, Lincoln, Monroe, Montgomery, Pike, Ralls)

Which Peer Electric Utilities Operate in MO?

Nearby Missouri electric utilities of comparable customer size led by City of Poplar Bluff - (MO) (11.06 c/kWh).

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City of Poplar Bluff - (MO) 11.06 c — 19 7,710
City of Hannibal - (MO) 14.03 c 17.7 min 20 7,673
City of Farmington - (MO) 14.59 c — 20 7,396
City of Rolla - (MO) 11.1 c 52.3 min 24 8,097
What to Check & Best-Fit Scenarios

What Should Consolidated Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Consolidated Electric Coop (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Annual snapshot caveat: Consolidated Electric Coop (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in MO.
  • Export credit rules: check Consolidated Electric Coop's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

Consolidated Electric Coop Solar & Battery Evaluators

Compare your actual Consolidated Electric Coop monthly kWh statement against 13.54 c/kWh and verify current export tariffs in MO.

Consolidated Electric Coop Outage & Generator Planners

Use Consolidated Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Consolidated Electric Coop (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

What is Consolidated Electric Coop's residential electricity rate and 2026 solar payback?

Consolidated Electric Coop averages 13.54 c/kWh (+0.24 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,462/yr (16.1-year payback).

How reliable is Consolidated Electric Coop compared to peer Missouri utilities?

Consolidated Electric Coop recorded 232.9 SAIDI outage minutes (3.88 hrs/yr, rank #471 of 751 reporting utilities); compare rates and outage history directly with City of Poplar Bluff - (MO) (11.06 c/kWh) across Missouri.

Which counties and customers does Consolidated Electric Coop serve in Missouri?

EIA-861 filings list 7,698 customers across 8 counties including Audrain, Boone, Callaway, with 70 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Consolidated Electric Coop.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.