Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Citizens Electric Corporation - (MO) (MO) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Citizens Electric Corporation - (MO) (EIA ID 3600, MO) serves 24,997 customers at 15.24 c/kWh (+1.94 c/kWh vs Missouri average) with 1,687.6 min/yr SAIDI (28.13 hrs/yr) with 279 net-metered residential solar systems (1.12% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
3600
Res. Rate
15.24 c/kWh
SAIDI (All Events)
1,687.6 min/yr
Net-Metered PV
279 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Citizens Electric Corporation - (MO) Compare on Tariffs and Reliability?

Solar payback, residential tariff (15.24 c/kWh), and outage history inside Citizens Electric Corporation - (MO) territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Homeowners inside Citizens Electric Corporation - (MO)'s Missouri footprint (6 counties including Bollinger, Cape Girardeau, Jefferson) face 15.24 c/kWh benchmark pricing (-3.30 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 14.3 years. Reliability data logged 1,687.6 SAIDI outage minutes (28.13 hrs/yr, 92.4% storm-driven), making battery backup or a standby ATS worthwhile.

Where Does Citizens Electric Corporation - (MO) Sit Across US Utility Rates?

Benchmarking Citizens Electric Corporation - (MO)'s 15.24 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Citizens Electric Corporation - (MO) Residential Tariff vs 1,989 US UtilitiesPositions Citizens Electric Corporation - (MO)'s 15.24 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhCitizens Electric : 15.24 c

How Does Citizens Electric Corporation - (MO) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Citizens Electric Corporation - (MO) across Missouri utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Citizens Electric Corporation - (MO) Grid & Tariff BenchmarksShows where Citizens Electric Corporation - (MO) ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate15.24 c/kWhAnnual SAIDI1,687.6 min/yrMajor-Storm Share92.4%

What Do EIA-861 Benchmarks Show for Citizens Electric Corporation - (MO)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Citizens Electric Corporation - (MO) in 2025.

Lowest Rate #1,261 / 1,989

15.24 c/kWh (+1.94 vs MO)

Commercial avg: 13.43 c/kWh; Industrial: 7.73 c/kWh; est. residential bill $158.18/mo.

Reliability #737 / 751

1,687.6 min/yr (28.13 hrs)

92.4% (1,559.5 min) from Major Event Days; avg restore 437.3 min (~13.1 kWh @ 1.8 kW).

Post-25D Payback

14.3 Years @ 15.24 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,646/yr at 1,350 kWh/kW.

Distributed PV

279 Net-Metered Systems

2.483 MW residential PV (1.12% of customers) across 6 counties; state FEMA declarations (2015-2026): 23.

Citizens Electric Corporation - (MO) Reliability & Solar Offset Calculation

Backup_Energy = (437.3 min / 60) * 1.8 kW = 13.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1524 = $1,646/yr

EIA-861 2025 Utility ID 3600: Rate=15.24 c/kWh, Cust=24,997, SAIDI=1,687.6 min, PV=279.

Result: 28.13 outage hrs/yr; 14.3 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Citizens Electric Corporation - (MO)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 3600. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for Citizens Electric Corporation - (MO) (Utility ID 3600).
EIA Utility ID & BA CodeID 3600 · MISO
State & Ownership TypeMO · Cooperative
Retail Electricity Rates15.24 c/kWh Res · 13.43 c Comm · 7.73 c Ind
Avg Monthly Usage & Bill1,037.8 kWh/mo ($158.18/mo est.)
SAIDI (All Events w/ MED)1,687.6 min/yr (28.13 hrs/yr)
SAIDI (Without Major Events)128.1 min/yr (Storm share: 92.4%)
SAIFI & CAIDI (Per-Outage Avg)3.859 /yr · 437.3 min restore
Residential Net-Metered PV279 systems (2.483 MW)
Counties Served (Sample)6 counties (Bollinger, Cape Girardeau, Jefferson, Perry, St Francois, Ste Genevieve)

Which Peer Electric Utilities Operate in MO?

Benchmark Citizens Electric Corporation - (MO) directly against Platte-Clay Electric Coop, Inc and peer Missouri retail electric power providers.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Platte-Clay Electric Coop, Inc 12.9 c 79.0 min 418 23,816
Howell-Oregon Elec Coop, Inc 13.12 c — 220 23,203
Three Rivers Electric Coop 13.03 c 130.0 min 158 22,757
Black River Electric Coop - (MO) 13.61 c 2,908.5 min 103 21,606
What to Check & Best-Fit Scenarios

What Should Citizens Electric Corporation - (MO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Citizens Electric Corporation - (MO) (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Not a substitute for meter bills: tiered and seasonal kWh blocks inside Citizens Electric Corporation - (MO) (MO) shift real bills away from 15.24 c/kWh.
  • Outage clustering: Major Event Days skew Citizens Electric Corporation - (MO) annual minutes differently than routine non-storm reliability.

Citizens Electric Corporation - (MO) Solar & Battery Evaluators

Compare your actual Citizens Electric Corporation - (MO) monthly kWh statement against 15.24 c/kWh and verify current export tariffs in MO.

Citizens Electric Corporation - (MO) Outage & Generator Planners

Use Citizens Electric Corporation - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Citizens Electric Corporation - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

What is Citizens Electric Corporation - (MO)'s residential electricity rate and 2026 solar payback?

Citizens Electric Corporation - (MO) averages 15.24 c/kWh (+1.94 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,646/yr (14.3-year payback).

How reliable is Citizens Electric Corporation - (MO) compared to peer Missouri utilities?

Citizens Electric Corporation - (MO) logged 1,687.6 SAIDI outage minutes (28.13 hrs/yr, 92.4% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Platte-Clay Electric Coop, Inc (12.9 c/kWh) across Missouri.

Which counties and customers does Citizens Electric Corporation - (MO) serve in Missouri?

EIA-861 filings list 24,997 customers across 6 counties including Bollinger, Cape Girardeau, Jefferson, with 279 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Citizens Electric Corporation - (MO).

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.