Runestone Electric Assn (MN) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Runestone Electric Assn (EIA ID 16368, MN) serves 14,349 customers at 14.75 c/kWh (-1.08 c/kWh vs Minnesota average) with 135.4 min/yr SAIDI (2.26 hrs/yr) with 67 net-metered residential solar systems (0.47% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
16368
Res. Rate
14.75 c/kWh
SAIDI (All Events)
135.4 min/yr
Net-Metered PV
67 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Runestone Electric Assn Compare on Tariffs and Reliability?

How Runestone Electric Assn (Cooperative) performs across 7 counties on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Across 7 counties including Douglas, Grant, Otter Tail, Runestone Electric Assn bills residential power at 14.75 c/kWh (-1.08 c/kWh vs Minnesota average vs. Minnesota), offsetting ~$1,593/yr on an 8 kW array compared to peer Mille Lacs Energy Cooperative (17.5 c/kWh). With 14,349 customer accounts (Cooperative), 2025 Form EIA-861 shows Runestone Electric Assn recorded 135.4 SAIDI outage minutes (2.26 hrs/yr, rank #306 of 751 reporting utilities), with 67 net-metered residential solar systems (0.47% customer adoption).

Where Does Runestone Electric Assn Sit Across US Utility Rates?

National utility tariff curve marking Runestone Electric Assn at 14.75 c/kWh vs. 18.54 c/kWh US mean.

Runestone Electric Assn Residential Tariff vs 1,989 US UtilitiesPositions Runestone Electric Assn's 14.75 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhRunestone Electric: 14.75 c

How Does Runestone Electric Assn Rank Across Cost & Reliability?

Relative ranking of Runestone Electric Assn on residential electricity pricing and annual IEEE SAIDI outage duration. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Runestone Electric Assn Grid & Tariff BenchmarksShows where Runestone Electric Assn ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate14.75 c/kWhAnnual SAIDI135.4 min/yrMajor-Storm Share14.1%

What Do EIA-861 Benchmarks Show for Runestone Electric Assn?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Runestone Electric Assn in Minnesota. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Lowest Rate #1,152 / 1,989

14.75 c/kWh (-1.08 vs MN)

Commercial avg: 13.6 c/kWh; Industrial: 11.65 c/kWh; est. residential bill $175.87/mo.

Reliability #306 / 751

135.4 min/yr (2.26 hrs)

14.1% (19.1 min) from Major Event Days; avg restore 86.3 min (~2.6 kWh @ 1.8 kW).

Post-25D Payback

14.8 Years @ 14.75 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,593/yr at 1,350 kWh/kW.

Distributed PV

67 Net-Metered Systems

1.062 MW residential PV (0.47% of customers) across 7 counties; state FEMA declarations (2015-2026): 15.

Runestone Electric Assn Reliability & Solar Offset Calculation

Backup_Energy = (86.3 min / 60) * 1.8 kW = 2.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1475 = $1,593/yr

EIA-861 2025 Utility ID 16368: Rate=14.75 c/kWh, Cust=14,349, SAIDI=135.4 min, PV=67.

Result: 2.26 outage hrs/yr; 14.8 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Runestone Electric Assn?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Runestone Electric Assn. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for Runestone Electric Assn (Utility ID 16368).
EIA Utility ID & BA CodeID 16368 · MISO
State & Ownership TypeMN · Cooperative
Retail Electricity Rates14.75 c/kWh Res · 13.6 c Comm · 11.65 c Ind
Avg Monthly Usage & Bill1,192.0 kWh/mo ($175.87/mo est.)
SAIDI (All Events w/ MED)135.4 min/yr (2.26 hrs/yr)
SAIDI (Without Major Events)116.3 min/yr (Storm share: 14.1%)
SAIFI & CAIDI (Per-Outage Avg)1.57 /yr · 86.3 min restore
Residential Net-Metered PV67 systems (1.062 MW)
Counties Served (Sample)7 counties (Douglas, Grant, Otter Tail, Pope, Stearns, Stevens, Todd)

Which Peer Electric Utilities Operate in MN?

Nearby Minnesota electric utilities of comparable customer size led by Mille Lacs Energy Cooperative (17.5 c/kWh). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Mille Lacs Energy Cooperative 17.5 c 207.8 min 65 14,603
Wild Rice Electric Coop, Inc 14.7 c — 80 14,001
MiEnergy Cooperative 16.9 c 212.8 min 421 15,320
City of Elk River 16.27 c 18.9 min 112 11,935
What to Check & Best-Fit Scenarios

What Should Runestone Electric Assn Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Runestone Electric Assn (Cooperative, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Not a substitute for meter bills: tiered and seasonal kWh blocks inside Runestone Electric Assn (MN) shift real bills away from 14.75 c/kWh.
  • Outage clustering: Major Event Days skew Runestone Electric Assn annual minutes differently than routine non-storm reliability.

Runestone Electric Assn Solar & Battery Evaluators

Compare your actual Runestone Electric Assn monthly kWh statement against 14.75 c/kWh and verify current export tariffs in MN.

Runestone Electric Assn Outage & Generator Planners

Use Runestone Electric Assn's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Runestone Electric Assn (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

What is Runestone Electric Assn's residential electricity rate and 2026 solar payback?

Runestone Electric Assn averages 14.75 c/kWh (-1.08 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,593/yr (14.8-year payback).

How reliable is Runestone Electric Assn compared to peer Minnesota utilities?

Runestone Electric Assn recorded 135.4 SAIDI outage minutes (2.26 hrs/yr, rank #306 of 751 reporting utilities); compare rates and outage history directly with Mille Lacs Energy Cooperative (17.5 c/kWh) across Minnesota.

Which counties and customers does Runestone Electric Assn serve in Minnesota?

EIA-861 filings list 14,349 customers across 7 counties including Douglas, Grant, Otter Tail, with 67 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Runestone Electric Assn.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.