Brainerd Public Utilities (EIA ID 2138, MN) serves 7,014 customers at 12.1 c/kWh (-3.73 c/kWh vs Minnesota average) with 21.3 min/yr SAIDI (0.36 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 2138
- Res. Rate
- 12.1 c/kWh
- SAIDI (All Events)
- 21.3 min/yr
- Net-Metered PV
- Unreported
How Does Brainerd Public Utilities Compare on Tariffs and Reliability?
Solar payback, residential tariff (12.1 c/kWh), and outage history inside Brainerd Public Utilities territory. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
Evaluating solar or generator backup under Brainerd Public Utilities (Minnesota) starts with its 12.1 c/kWh residential baseline (-3.73 c/kWh vs Minnesota average) and 18.1-year 8 kW cash payback. EIA-861 records show Brainerd Public Utilities recorded 21.3 SAIDI outage minutes (0.36 hrs/yr, rank #44 of 751 reporting utilities) across 7,014 accounts.
Where Does Brainerd Public Utilities Sit Across US Utility Rates?
Benchmarking Brainerd Public Utilities's 12.1 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
How Does Brainerd Public Utilities Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Brainerd Public Utilities across Minnesota utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
What Do EIA-861 Benchmarks Show for Brainerd Public Utilities?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Brainerd Public Utilities in 2025. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
12.1 c/kWh (-3.73 vs MN)
Commercial avg: 8.17 c/kWh; est. residential bill $80.11/mo.
21.3 min/yr (0.36 hrs)
0.0% (0.0 min) from Major Event Days; avg restore 69.9 min (~2.1 kWh @ 1.8 kW).
18.1 Years @ 12.1 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,307/yr at 1,350 kWh/kW.
7,014 Customers · 1 County
Serves 1 county including Crow Wing in Minnesota; state FEMA declarations (2015-2026): 15.
Brainerd Public Utilities Reliability & Solar Offset Calculation
Backup_Energy = (69.9 min / 60) * 1.8 kW = 2.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1210 = $1,307/yr
EIA-861 2025 Utility ID 2138: Rate=12.1 c/kWh, Cust=7,014, SAIDI=21.3 min.
Result: 0.36 outage hrs/yr; 18.1 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for Brainerd Public Utilities?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 2138. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
| EIA Utility ID & BA Code | ID 2138 · MISO |
|---|---|
| State & Ownership Type | MN · Municipal |
| Retail Electricity Rates | 12.1 c/kWh Res · 8.17 c Comm |
| Avg Monthly Usage & Bill | 662.0 kWh/mo ($80.11/mo est.) |
| SAIDI (All Events w/ MED) | 21.3 min/yr (0.36 hrs/yr) |
| SAIDI (Without Major Events) | 21.3 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.305 /yr · 69.9 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Crow Wing) |
Which Peer Electric Utilities Operate in MN?
Benchmark Brainerd Public Utilities directly against Hutchinson Utilities Comm and peer Minnesota retail electric power providers. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Hutchinson Utilities Comm | 11.02 c | — | 0 | 6,731 |
| City of Marshall - (MN) | 9.85 c | 4.9 min | 8 | 5,864 |
| Federated Rural Electric Assn | 12.81 c | 116.2 min | 13 | 5,733 |
| Willmar Municipal Utilities (MN) | 13.77 c | 16.1 min | 13 | 8,521 |
What Should Brainerd Public Utilities Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Brainerd Public Utilities (Municipal, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- ERCOT / retail choice note or local riders: confirm whether Brainerd Public Utilities acts as a wires-only TDU or bundled utility in MN.
- Transformer limits: Brainerd Public Utilities interconnection engineering still checks neighborhood transformer kVA regardless of 21.3 SAIDI.
Brainerd Public Utilities Solar & Battery Evaluators
Compare your actual Brainerd Public Utilities monthly kWh statement against 12.1 c/kWh and verify current export tariffs in MN.
Brainerd Public Utilities Outage & Generator Planners
Use Brainerd Public Utilities's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Brainerd Public Utilities (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
What is Brainerd Public Utilities's residential electricity rate and 2026 solar payback?
Brainerd Public Utilities averages 12.1 c/kWh (-3.73 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,307/yr (18.1-year payback).
How reliable is Brainerd Public Utilities compared to peer Minnesota utilities?
Brainerd Public Utilities recorded 21.3 SAIDI outage minutes (0.36 hrs/yr, rank #44 of 751 reporting utilities); compare rates and outage history directly with Hutchinson Utilities Comm (11.02 c/kWh) across Minnesota.
Which counties and customers does Brainerd Public Utilities serve in Minnesota?
EIA-861 filings list 7,014 customers across 1 county including Crow Wing, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Brainerd Public Utilities.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)