Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

ALLETE, Inc. (EIA ID 12647, MN) serves 126,520 customers at 15.86 c/kWh (+0.03 c/kWh vs Minnesota average) with 143.2 min/yr SAIDI (2.39 hrs/yr) with 1,210 net-metered residential solar systems (0.96% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
12647
Res. Rate
15.86 c/kWh
SAIDI (All Events)
143.2 min/yr
Net-Metered PV
1,210 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does ALLETE, Inc. Compare on Tariffs and Reliability?

Solar payback, residential tariff (15.86 c/kWh), and outage history inside ALLETE, Inc. territory. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Evaluating solar or generator backup under ALLETE, Inc. (Minnesota) starts with its 15.86 c/kWh residential baseline (+0.03 c/kWh vs Minnesota average) and 13.8-year 8 kW cash payback. EIA-861 records show ALLETE, Inc. recorded 143.2 SAIDI outage minutes (2.39 hrs/yr, rank #320 of 751 reporting utilities) across 126,520 accounts.

Where Does ALLETE, Inc. Sit Across US Utility Rates?

Benchmarking ALLETE, Inc.'s 15.86 c/kWh residential rate against 1,989 EIA-861 utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

ALLETE, Inc. Residential Tariff vs 1,989 US UtilitiesPositions ALLETE, Inc.'s 15.86 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhALLETE, Inc.: 15.86 c

How Does ALLETE, Inc. Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for ALLETE, Inc. across Minnesota utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

ALLETE, Inc. Grid & Tariff BenchmarksShows where ALLETE, Inc. ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate15.86 c/kWhAnnual SAIDI143.2 min/yrMajor-Storm Share28.5%

What Do EIA-861 Benchmarks Show for ALLETE, Inc.?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by ALLETE, Inc. in 2025. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #1,380 / 1,989

15.86 c/kWh (+0.03 vs MN)

Commercial avg: 14.75 c/kWh; Industrial: 9.37 c/kWh; est. residential bill $106.80/mo.

Reliability #320 / 751

143.2 min/yr (2.39 hrs)

28.5% (40.8 min) from Major Event Days; avg restore 116.4 min (~3.5 kWh @ 1.8 kW).

Post-25D Payback

13.8 Years @ 15.86 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,713/yr at 1,350 kWh/kW.

Distributed PV

1,210 Net-Metered Systems

11.832 MW residential PV (0.96% of customers) across 17 counties; state FEMA declarations (2015-2026): 15.

ALLETE, Inc. Reliability & Solar Offset Calculation

Backup_Energy = (116.4 min / 60) * 1.8 kW = 3.5 kWh/event | Solar_Offset = 10,800 kWh * $0.1586 = $1,713/yr

EIA-861 2025 Utility ID 12647: Rate=15.86 c/kWh, Cust=126,520, SAIDI=143.2 min, PV=1,210.

Result: 2.39 outage hrs/yr; 13.8 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for ALLETE, Inc.?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 12647. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for ALLETE, Inc. (Utility ID 12647).
EIA Utility ID & BA CodeID 12647 · MISO
State & Ownership TypeMN · Investor Owned
Retail Electricity Rates15.86 c/kWh Res · 14.75 c Comm · 9.37 c Ind
Avg Monthly Usage & Bill673.3 kWh/mo ($106.80/mo est.)
SAIDI (All Events w/ MED)143.2 min/yr (2.39 hrs/yr)
SAIDI (Without Major Events)102.4 min/yr (Storm share: 28.5%)
SAIFI & CAIDI (Per-Outage Avg)1.23 /yr · 116.4 min restore
Residential Net-Metered PV1,210 systems (11.832 MW)
Counties Served (Sample)17 counties (Aitkin, Benton, Carlton, Cass, Cook, Crow Wing, Hubbard, Itasca, Koochiching, Lake)

Which Peer Electric Utilities Operate in MN?

Benchmark ALLETE, Inc. directly against Connexus Energy and peer Minnesota retail electric power providers. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Connexus Energy 14.11 c 53.8 min 1,475 136,082
Dakota Electric Association 15.63 c 28.7 min 1,742 109,148
East Central Energy 17.63 c 97.0 min 682 55,839
Rochester Public Utilities 18.58 c 33.0 min 755 55,728
What to Check & Best-Fit Scenarios

What Should ALLETE, Inc. Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for ALLETE, Inc. (Investor Owned, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether ALLETE, Inc. acts as a wires-only TDU or bundled utility in MN.
  • Transformer limits: ALLETE, Inc. interconnection engineering still checks neighborhood transformer kVA regardless of 143.2 SAIDI.

ALLETE, Inc. Solar & Battery Evaluators

Compare your actual ALLETE, Inc. monthly kWh statement against 15.86 c/kWh and verify current export tariffs in MN.

ALLETE, Inc. Outage & Generator Planners

Use ALLETE, Inc.'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for ALLETE, Inc. (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

What is ALLETE, Inc.'s residential electricity rate and 2026 solar payback?

ALLETE, Inc. averages 15.86 c/kWh (+0.03 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,713/yr (13.8-year payback).

How reliable is ALLETE, Inc. compared to peer Minnesota utilities?

ALLETE, Inc. recorded 143.2 SAIDI outage minutes (2.39 hrs/yr, rank #320 of 751 reporting utilities); compare rates and outage history directly with Connexus Energy (14.11 c/kWh) across Minnesota.

Which counties and customers does ALLETE, Inc. serve in Minnesota?

EIA-861 filings list 126,520 customers across 17 counties including Aitkin, Benton, Carlton, with 1,210 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting ALLETE, Inc..

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.