Powervine Energy (EIA ID 62148, MD) serves 324 customers at 13.49 c/kWh (-6.04 c/kWh vs Maryland average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 62148
- Res. Rate
- 13.49 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- Unreported
How Does Powervine Energy Compare on Tariffs and Reliability?
Solar payback, residential tariff (13.49 c/kWh), and outage history inside Powervine Energy territory. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
Homeowners inside Powervine Energy's Maryland footprint (0 counties) face 13.49 c/kWh benchmark pricing (-5.05 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.2 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr).
Where Does Powervine Energy Sit Across US Utility Rates?
Benchmarking Powervine Energy's 13.49 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
How Does Powervine Energy Rank Across Cost & Reliability?
Residential electricity cost and IEEE outage reliability percentiles for Powervine Energy across Maryland utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
What Do EIA-861 Benchmarks Show for Powervine Energy?
Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Powervine Energy in 2025. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.
13.49 c/kWh (-6.04 vs MD)
est. residential bill $95.06/mo.
178.3 min/yr (MD Avg)
Utility did not file separate IEEE SAIDI in 2025; Maryland customer-weighted SAIDI is 178.3 min/yr.
16.2 Years @ 13.49 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,457/yr at 1,350 kWh/kW.
324 Customers · 0 Counties
Serves 0 counties in Maryland; state FEMA declarations (2015-2026): 8.
Powervine Energy Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1349 = $1,457/yr
EIA-861 2025 Utility ID 62148: Rate=13.49 c/kWh, Cust=324.
Result: 16.2 yr 8 kW cash payback at 13.49 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Powervine Energy?
2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 62148. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.
| EIA Utility ID & BA Code | ID 62148 · PJM |
|---|---|
| State & Ownership Type | MD · Retail Power Marketer |
| Retail Electricity Rates | 13.49 c/kWh Res |
| Avg Monthly Usage & Bill | 704.5 kWh/mo ($95.06/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
Which Peer Electric Utilities Operate in MD?
Benchmark Powervine Energy directly against Spark Energy, LP and peer Maryland retail electric power providers. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Spark Energy, LP | 16.06 c | — | 0 | 328 |
| Alpha Gas and Electric, LLC | 13.93 c | — | 0 | 311 |
| Viridian Energy PA LLC | 13.18 c | — | 0 | 280 |
| Interstate Gas Supply, Inc. | 12.3 c | — | 0 | 280 |
What Should Powervine Energy Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Powervine Energy (Retail Power Marketer, MD) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Powervine Energy (MD) shift real bills away from 13.49 c/kWh.
- Outage clustering: Major Event Days skew Powervine Energy annual minutes differently than routine non-storm reliability.
Powervine Energy Solar & Battery Evaluators
Compare your actual Powervine Energy monthly kWh statement against 13.49 c/kWh and verify current export tariffs in MD.
Powervine Energy Outage & Generator Planners
Use Powervine Energy's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Powervine Energy (Maryland) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
What is Powervine Energy's residential electricity rate and 2026 solar payback?
Powervine Energy averages 13.49 c/kWh (-6.04 c/kWh vs Maryland average vs. Maryland). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,457/yr (16.2-year payback).
How reliable is Powervine Energy compared to peer Maryland utilities?
Powervine Energy did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr); compare rates and outage history directly with Spark Energy, LP (16.06 c/kWh) across Maryland.
Which counties and customers does Powervine Energy serve in Maryland?
EIA-861 filings list 324 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Powervine Energy.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)