Hagerstown Light Department (EIA ID 7908, MD) serves 14,878 customers at 11.23 c/kWh (-8.30 c/kWh vs Maryland average) with no standalone IEEE SAIDI filing (1 county served) with 38 net-metered residential solar systems (0.26% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 7908
- Res. Rate
- 11.23 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- 38 systems
How Does Hagerstown Light Department Compare on Tariffs and Reliability?
How Hagerstown Light Department (Municipal) performs across 1 county on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.
Hagerstown Light Department (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr). Typical residential meters drew 947.5 kWh/mo ($106.41/mo) in 2025, while its tariff offers a low 11.23 c/kWh residential rate (-7.31 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 19.5 years without federal 25D—compare rates directly with WGL Energy Services, Inc. (12.05 c/kWh).
Where Does Hagerstown Light Department Sit Across US Utility Rates?
National utility tariff curve marking Hagerstown Light Department at 11.23 c/kWh vs. 18.54 c/kWh US mean.
How Does Hagerstown Light Department Rank Across Cost & Reliability?
Relative ranking of Hagerstown Light Department on residential electricity pricing and annual IEEE SAIDI outage duration. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.
What Do EIA-861 Benchmarks Show for Hagerstown Light Department?
Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Hagerstown Light Department in Maryland. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.
11.23 c/kWh (-8.30 vs MD)
Commercial avg: 11.9 c/kWh; Industrial: 10.26 c/kWh; est. residential bill $106.41/mo.
178.3 min/yr (MD Avg)
Utility did not file separate IEEE SAIDI in 2025; Maryland customer-weighted SAIDI is 178.3 min/yr.
19.5 Years @ 11.23 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,213/yr at 1,350 kWh/kW.
38 Net-Metered Systems
0.282 MW residential PV (0.26% of customers) across 1 county; state FEMA declarations (2015-2026): 8.
Hagerstown Light Department Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1123 = $1,213/yr
EIA-861 2025 Utility ID 7908: Rate=11.23 c/kWh, Cust=14,878, PV=38.
Result: 19.5 yr 8 kW cash payback at 11.23 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Hagerstown Light Department?
Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Hagerstown Light Department. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
| EIA Utility ID & BA Code | ID 7908 · PJM |
|---|---|
| State & Ownership Type | MD · Municipal |
| Retail Electricity Rates | 11.23 c/kWh Res · 11.9 c Comm · 10.26 c Ind |
| Avg Monthly Usage & Bill | 947.5 kWh/mo ($106.41/mo est.) |
| Residential Net-Metered PV | 38 systems (0.282 MW) |
| Counties Served (Sample) | 1 county (Washington) |
Which Peer Electric Utilities Operate in MD?
Nearby Maryland electric utilities of comparable customer size led by WGL Energy Services, Inc. (12.05 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| WGL Energy Services, Inc. | 12.05 c | — | 0 | 14,898 |
| Inspire Energy Holdings, LLC | 15.47 c | — | 0 | 12,214 |
| Just Energy Solutions Inc. | 13.66 c | — | 0 | 9,665 |
| Easton Utilities Comm | 15.18 c | 30.5 min | 52 | 8,884 |
What Should Hagerstown Light Department Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Hagerstown Light Department (Municipal, MD) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- ERCOT / retail choice note or local riders: confirm whether Hagerstown Light Department acts as a wires-only TDU or bundled utility in MD.
- Transformer limits: Hagerstown Light Department interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.
Hagerstown Light Department Solar & Battery Evaluators
Compare your actual Hagerstown Light Department monthly kWh statement against 11.23 c/kWh and verify current export tariffs in MD.
Hagerstown Light Department Outage & Generator Planners
Use Hagerstown Light Department's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Hagerstown Light Department (Maryland) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.
What is Hagerstown Light Department's residential electricity rate and 2026 solar payback?
Hagerstown Light Department averages 11.23 c/kWh (-8.30 c/kWh vs Maryland average vs. Maryland). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,213/yr (19.5-year payback).
How reliable is Hagerstown Light Department compared to peer Maryland utilities?
Hagerstown Light Department did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr); compare rates and outage history directly with WGL Energy Services, Inc. (12.05 c/kWh) across Maryland.
Which counties and customers does Hagerstown Light Department serve in Maryland?
EIA-861 filings list 14,878 customers across 1 county including Washington, with 38 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Hagerstown Light Department.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)