Jefferson Davis Elec Coop, Inc (EIA ID 9682, LA) serves 9,366 customers at 14.8 c/kWh (+2.28 c/kWh vs Louisiana average) with no standalone IEEE SAIDI filing (5 counties served) with 86 net-metered residential solar systems (0.92% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 9682
- Res. Rate
- 14.8 c/kWh
- SAIDI (All Events)
- Not reported in EIA-861
- Net-Metered PV
- 86 systems
How Does Jefferson Davis Elec Coop, Inc Compare on Tariffs and Reliability?
EIA-861 rate delta (+2.28 c/kWh vs Louisiana average), customer scale (9,366), and 2026 solar payback benchmarks for Jefferson Davis Elec Coop, Inc.
Ranked #1,171 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 41.0% of peers), Jefferson Davis Elec Coop, Inc serves 9,366 accounts in Louisiana (Cooperative). Commercial power averages 14.38 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 271.6 min/yr), with 86 net-metered residential solar systems (0.92% customer adoption).
Where Does Jefferson Davis Elec Coop, Inc Sit Across US Utility Rates?
Positions Jefferson Davis Elec Coop, Inc (14.8 c/kWh) across 1,989 US electric utility residential tariffs. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.
How Does Jefferson Davis Elec Coop, Inc Rank Across Cost & Reliability?
Percentile placement of Jefferson Davis Elec Coop, Inc across retail kWh electricity cost and IEEE grid reliability outage metrics.
What Do EIA-861 Benchmarks Show for Jefferson Davis Elec Coop, Inc?
Four key EIA-861 rate, outage, and solar payback benchmarks for Jefferson Davis Elec Coop, Inc (Cooperative) in Louisiana.
14.8 c/kWh (+2.28 vs LA)
Commercial avg: 14.38 c/kWh; Industrial: 11.18 c/kWh; est. residential bill $182.77/mo.
271.6 min/yr (LA Avg)
Utility did not file separate IEEE SAIDI in 2025; Louisiana customer-weighted SAIDI is 271.6 min/yr.
14.8 Years @ 14.8 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,598/yr at 1,350 kWh/kW.
86 Net-Metered Systems
1.0 MW residential PV (0.92% of customers) across 5 counties; state FEMA declarations (2015-2026): 40.
Jefferson Davis Elec Coop, Inc Reliability & Solar Offset Calculation
Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1480 = $1,598/yr
EIA-861 2025 Utility ID 9682: Rate=14.8 c/kWh, Cust=9,366, PV=86.
Result: 14.8 yr 8 kW cash payback at 14.8 c/kWh (0% 25D).
What Are the EIA-861 Filing Metrics for Jefferson Davis Elec Coop, Inc?
Complete Form EIA-861 filing summary for Jefferson Davis Elec Coop, Inc (ID 9682) covering sales, PV, and counties.
| EIA Utility ID & BA Code | ID 9682 · MISO |
|---|---|
| State & Ownership Type | LA · Cooperative |
| Retail Electricity Rates | 14.8 c/kWh Res · 14.38 c Comm · 11.18 c Ind |
| Avg Monthly Usage & Bill | 1,235.2 kWh/mo ($182.77/mo est.) |
| Residential Net-Metered PV | 86 systems (1.0 MW) |
| Counties Served (Sample) | 5 counties (Allen, Calcasieu, Cameron, Jefferson Davis, Vermilion) |
Which Peer Electric Utilities Operate in LA?
Compare Jefferson Davis Elec Coop, Inc directly with City of Ruston - (LA) and nearby Louisiana electric utilities by customer base.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| City of Ruston - (LA) | 5.62 c | 133.2 min | 17 | 10,021 |
| Panola-Harrison Elec Coop, Inc | 9.92 c | — | 94 | 8,485 |
| Pointe Coupee Elec Member Corp | 14.78 c | — | 67 | 8,254 |
| Terrebonne Parish Consol Gov't | 10.73 c | — | 0 | 11,403 |
What Should Jefferson Davis Elec Coop, Inc Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Jefferson Davis Elec Coop, Inc (Cooperative, LA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Annual snapshot caveat: Jefferson Davis Elec Coop, Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in LA.
- Export credit rules: check Jefferson Davis Elec Coop, Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.
Jefferson Davis Elec Coop, Inc Solar & Battery Evaluators
Compare your actual Jefferson Davis Elec Coop, Inc monthly kWh statement against 14.8 c/kWh and verify current export tariffs in LA.
Jefferson Davis Elec Coop, Inc Outage & Generator Planners
Use Jefferson Davis Elec Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Jefferson Davis Elec Coop, Inc (Louisiana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Jefferson Davis Elec Coop, Inc's residential electricity rate and 2026 solar payback?
Jefferson Davis Elec Coop, Inc averages 14.8 c/kWh (+2.28 c/kWh vs Louisiana average vs. Louisiana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,598/yr (14.8-year payback).
How reliable is Jefferson Davis Elec Coop, Inc compared to peer Louisiana utilities?
Jefferson Davis Elec Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 271.6 min/yr); compare rates and outage history directly with City of Ruston - (LA) (5.62 c/kWh) across Louisiana.
Which counties and customers does Jefferson Davis Elec Coop, Inc serve in Louisiana?
EIA-861 filings list 9,366 customers across 5 counties including Allen, Calcasieu, Cameron, with 86 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Jefferson Davis Elec Coop, Inc.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)