Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Highline Electric Assn (CO) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Highline Electric Assn (EIA ID 8570, CO) serves 5,013 customers at 15.16 c/kWh (-0.53 c/kWh vs Colorado average) with no standalone IEEE SAIDI filing (7 counties served) with 63 net-metered residential solar systems (1.26% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
8570
Res. Rate
15.16 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
63 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Highline Electric Assn Compare on Tariffs and Reliability?

How Highline Electric Assn (Cooperative) performs across 7 counties on kWh rates and outage resilience. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Across 7 counties including Logan, Morgan, Phillips, Highline Electric Assn bills residential power at 15.16 c/kWh (-0.53 c/kWh vs Colorado average vs. Colorado), offsetting ~$1,637/yr on an 8 kW array compared to peer Y-W Electric Assn Inc (15.66 c/kWh). With 5,013 customer accounts (Cooperative), 2025 Form EIA-861 shows Highline Electric Assn did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 272.5 min/yr), with 63 net-metered residential solar systems (1.26% customer adoption).

Where Does Highline Electric Assn Sit Across US Utility Rates?

National utility tariff curve marking Highline Electric Assn at 15.16 c/kWh vs. 18.54 c/kWh US mean.

Highline Electric Assn Residential Tariff vs 1,989 US UtilitiesPositions Highline Electric Assn's 15.16 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhHighline Electric : 15.16 c

How Does Highline Electric Assn Rank Across Cost & Reliability?

Relative ranking of Highline Electric Assn on residential electricity pricing and annual IEEE SAIDI outage duration. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Highline Electric Assn Grid & Tariff BenchmarksShows where Highline Electric Assn ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate15.16 c/kWh

What Do EIA-861 Benchmarks Show for Highline Electric Assn?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Highline Electric Assn in Colorado. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #1,248 / 1,989

15.16 c/kWh (-0.53 vs CO)

Commercial avg: 13.38 c/kWh; Industrial: 9.96 c/kWh; est. residential bill $136.88/mo.

State Reliability Context

272.5 min/yr (CO Avg)

Utility did not file separate IEEE SAIDI in 2025; Colorado customer-weighted SAIDI is 272.5 min/yr.

Post-25D Payback

14.4 Years @ 15.16 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,637/yr at 1,350 kWh/kW.

Distributed PV

63 Net-Metered Systems

0.641 MW residential PV (1.26% of customers) across 7 counties; state FEMA declarations (2015-2026): 28.

Highline Electric Assn Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1516 = $1,637/yr

EIA-861 2025 Utility ID 8570: Rate=15.16 c/kWh, Cust=5,013, PV=63.

Result: 14.4 yr 8 kW cash payback at 15.16 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for Highline Electric Assn?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Highline Electric Assn. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for Highline Electric Assn (Utility ID 8570).
EIA Utility ID & BA CodeID 8570 · WACM
State & Ownership TypeCO · Cooperative
Retail Electricity Rates15.16 c/kWh Res · 13.38 c Comm · 9.96 c Ind
Avg Monthly Usage & Bill902.8 kWh/mo ($136.88/mo est.)
Residential Net-Metered PV63 systems (0.641 MW)
Counties Served (Sample)7 counties (Logan, Morgan, Phillips, Sedgwick, Washington, Weld, Yuma)

Which Peer Electric Utilities Operate in CO?

Nearby Colorado electric utilities of comparable customer size led by Y-W Electric Assn Inc (15.66 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Y-W Electric Assn Inc 15.66 c 699.7 min 35 4,878
City of Fort Morgan 7.31 c — 31 5,434
Morgan County Rural Elec Assn 14.46 c — 92 5,891
K C Electric Association 13.02 c — 22 3,411
What to Check & Best-Fit Scenarios

What Should Highline Electric Assn Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Highline Electric Assn (Cooperative, CO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Not a substitute for meter bills: tiered and seasonal kWh blocks inside Highline Electric Assn (CO) shift real bills away from 15.16 c/kWh.
  • Outage clustering: Major Event Days skew Highline Electric Assn annual minutes differently than routine non-storm reliability.

Highline Electric Assn Solar & Battery Evaluators

Compare your actual Highline Electric Assn monthly kWh statement against 15.16 c/kWh and verify current export tariffs in CO.

Highline Electric Assn Outage & Generator Planners

Use Highline Electric Assn's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Highline Electric Assn (Colorado) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

What is Highline Electric Assn's residential electricity rate and 2026 solar payback?

Highline Electric Assn averages 15.16 c/kWh (-0.53 c/kWh vs Colorado average vs. Colorado). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,637/yr (14.4-year payback).

How reliable is Highline Electric Assn compared to peer Colorado utilities?

Highline Electric Assn did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 272.5 min/yr); compare rates and outage history directly with Y-W Electric Assn Inc (15.66 c/kWh) across Colorado.

Which counties and customers does Highline Electric Assn serve in Colorado?

EIA-861 filings list 5,013 customers across 7 counties including Logan, Morgan, Phillips, with 63 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Highline Electric Assn.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.