Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Turlock Irrigation District (CA) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Turlock Irrigation District (EIA ID 19281, CA) serves 80,976 customers at 17.4 c/kWh (-13.95 c/kWh vs California average) with 61.5 min/yr SAIDI (1.02 hrs/yr) with 5,415 net-metered residential solar systems (6.69% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
19281
Res. Rate
17.4 c/kWh
SAIDI (All Events)
61.5 min/yr
Net-Metered PV
5,415 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Turlock Irrigation District Compare on Tariffs and Reliability?

Solar payback, residential tariff (17.4 c/kWh), and outage history inside Turlock Irrigation District territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Evaluating solar or generator backup under Turlock Irrigation District (California) starts with its 17.4 c/kWh residential baseline (-13.95 c/kWh vs California average) and 12.6-year 8 kW cash payback. EIA-861 records show Turlock Irrigation District recorded 61.5 SAIDI outage minutes (1.02 hrs/yr, rank #139 of 751 reporting utilities) across 80,976 accounts.

Where Does Turlock Irrigation District Sit Across US Utility Rates?

Benchmarking Turlock Irrigation District's 17.4 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Turlock Irrigation District Residential Tariff vs 1,989 US UtilitiesPositions Turlock Irrigation District's 17.4 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhTurlock Irrigation: 17.4 c

How Does Turlock Irrigation District Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Turlock Irrigation District across California utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Turlock Irrigation District Grid & Tariff BenchmarksShows where Turlock Irrigation District ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate17.4 c/kWhAnnual SAIDI61.5 min/yr

What Do EIA-861 Benchmarks Show for Turlock Irrigation District?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Turlock Irrigation District in 2025. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Lowest Rate #1,598 / 1,989

17.4 c/kWh (-13.95 vs CA)

Commercial avg: 14.35 c/kWh; Industrial: 13.23 c/kWh; est. residential bill $141.66/mo.

Reliability #139 / 751

61.5 min/yr (1.02 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 93.2 min (~2.8 kWh @ 1.8 kW).

Post-25D Payback

12.6 Years @ 17.4 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,879/yr at 1,350 kWh/kW.

Distributed PV

5,415 Net-Metered Systems

31.449 MW residential PV (6.69% of customers) across 3 counties; state FEMA declarations (2015-2026): 161.

Turlock Irrigation District Reliability & Solar Offset Calculation

Backup_Energy = (93.2 min / 60) * 1.8 kW = 2.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1740 = $1,879/yr

EIA-861 2025 Utility ID 19281: Rate=17.4 c/kWh, Cust=80,976, SAIDI=61.5 min, PV=5,415.

Result: 1.02 outage hrs/yr; 12.6 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Turlock Irrigation District?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 19281. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Turlock Irrigation District (Utility ID 19281).
EIA Utility ID & BA CodeID 19281 · TIDC
State & Ownership TypeCA · Political Subdivision
Retail Electricity Rates17.4 c/kWh Res · 14.35 c Comm · 13.23 c Ind
Avg Monthly Usage & Bill814.0 kWh/mo ($141.66/mo est.)
SAIDI (All Events w/ MED)61.5 min/yr (1.02 hrs/yr)
SAIDI (Without Major Events)61.5 min/yr (Storm share: 0.0%)
SAIFI & CAIDI (Per-Outage Avg)0.66 /yr · 93.2 min restore
Residential Net-Metered PV5,415 systems (31.449 MW)
Counties Served (Sample)3 counties (Merced, Stanislaus, Tuolumne)

Which Peer Electric Utilities Operate in CA?

Benchmark Turlock Irrigation District directly against City of Glendale - (CA) and peer California retail electric power providers. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City of Glendale - (CA) 35.51 c — 3,874 78,071
City of Roseville - (CA) 21.29 c — 13,362 64,556
SunPower Capital, LLC 25.7 c — 0 64,390
City of Riverside - (CA) 21.94 c 88.3 min 7,975 101,042
What to Check & Best-Fit Scenarios

What Should Turlock Irrigation District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Turlock Irrigation District (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether Turlock Irrigation District acts as a wires-only TDU or bundled utility in CA.
  • Transformer limits: Turlock Irrigation District interconnection engineering still checks neighborhood transformer kVA regardless of 61.5 SAIDI.

Turlock Irrigation District Solar & Battery Evaluators

Compare your actual Turlock Irrigation District monthly kWh statement against 17.4 c/kWh and verify current export tariffs in CA.

Turlock Irrigation District Outage & Generator Planners

Use Turlock Irrigation District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Turlock Irrigation District (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

What is Turlock Irrigation District's residential electricity rate and 2026 solar payback?

Turlock Irrigation District averages 17.4 c/kWh (-13.95 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,879/yr (12.6-year payback).

How reliable is Turlock Irrigation District compared to peer California utilities?

Turlock Irrigation District recorded 61.5 SAIDI outage minutes (1.02 hrs/yr, rank #139 of 751 reporting utilities); compare rates and outage history directly with City of Glendale - (CA) (35.51 c/kWh) across California.

Which counties and customers does Turlock Irrigation District serve in California?

EIA-861 filings list 80,976 customers across 3 counties including Merced, Stanislaus, Tuolumne, with 5,415 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Turlock Irrigation District.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.