Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Pilot Power Group, LLC (CA) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Pilot Power Group, LLC (EIA ID 14999, CA) serves 3,678 customers at 16.67 c/kWh (-14.68 c/kWh vs California average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
14999
Res. Rate
16.67 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
Unreported
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Pilot Power Group, LLC Compare on Tariffs and Reliability?

How Pilot Power Group, LLC (Retail Power Marketer) performs across 0 counties on kWh rates and outage resilience.

Across 0 counties, Pilot Power Group, LLC bills residential power at 16.67 c/kWh (-14.68 c/kWh vs California average vs. California), offsetting ~$1,800/yr on an 8 kW array compared to peer City & County of San Francisco - (CA) (27.13 c/kWh). With 3,678 customer accounts (Retail Power Marketer), 2025 Form EIA-861 shows Pilot Power Group, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr), with zero residential net-metered PV reported in 2025 filings.

Where Does Pilot Power Group, LLC Sit Across US Utility Rates?

National utility tariff curve marking Pilot Power Group, LLC at 16.67 c/kWh vs. 18.54 c/kWh US mean.

Pilot Power Group, LLC Residential Tariff vs 1,989 US UtilitiesPositions Pilot Power Group, LLC's 16.67 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhPilot Power Group,: 16.67 c

How Does Pilot Power Group, LLC Rank Across Cost & Reliability?

Relative ranking of Pilot Power Group, LLC on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Pilot Power Group, LLC Grid & Tariff BenchmarksShows where Pilot Power Group, LLC ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate16.67 c/kWh

What Do EIA-861 Benchmarks Show for Pilot Power Group, LLC?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Pilot Power Group, LLC in California.

Lowest Rate #1,505 / 1,989

16.67 c/kWh (-14.68 vs CA)

Commercial avg: 9.25 c/kWh; Industrial: 8.77 c/kWh; est. residential bill $82.59/mo.

State Reliability Context

358.3 min/yr (CA Avg)

Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.

Post-25D Payback

13.1 Years @ 16.67 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,800/yr at 1,350 kWh/kW.

Service Territory

3,678 Customers · 0 Counties

Serves 0 counties in California; state FEMA declarations (2015-2026): 161.

Pilot Power Group, LLC Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1667 = $1,800/yr

EIA-861 2025 Utility ID 14999: Rate=16.67 c/kWh, Cust=3,678.

Result: 13.1 yr 8 kW cash payback at 16.67 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for Pilot Power Group, LLC?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Pilot Power Group, LLC. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Pilot Power Group, LLC (Utility ID 14999).
EIA Utility ID & BA CodeID 14999 · CISO
State & Ownership TypeCA · Retail Power Marketer
Retail Electricity Rates16.67 c/kWh Res · 9.25 c Comm · 8.77 c Ind
Avg Monthly Usage & Bill495.5 kWh/mo ($82.59/mo est.)
Residential Net-Metered PVNot reported in 2025 EIA-861

Which Peer Electric Utilities Operate in CA?

Nearby California electric utilities of comparable customer size led by City & County of San Francisco - (CA) (27.13 c/kWh).

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
City & County of San Francisco - (CA) 27.13 c — 0 3,670
City of Shasta Lake - (CA) 22.91 c 79.5 min 146 4,278
Surprise Valley Electrification 13.5 c — 18 2,788
King City Community Power 14.2 c — 0 2,716
What to Check & Best-Fit Scenarios

What Should Pilot Power Group, LLC Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Pilot Power Group, LLC (Retail Power Marketer, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Not a substitute for meter bills: tiered and seasonal kWh blocks inside Pilot Power Group, LLC (CA) shift real bills away from 16.67 c/kWh.
  • Outage clustering: Major Event Days skew Pilot Power Group, LLC annual minutes differently than routine non-storm reliability.

Pilot Power Group, LLC Solar & Battery Evaluators

Compare your actual Pilot Power Group, LLC monthly kWh statement against 16.67 c/kWh and verify current export tariffs in CA.

Pilot Power Group, LLC Outage & Generator Planners

Use Pilot Power Group, LLC's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Pilot Power Group, LLC (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

What is Pilot Power Group, LLC's residential electricity rate and 2026 solar payback?

Pilot Power Group, LLC averages 16.67 c/kWh (-14.68 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,800/yr (13.1-year payback).

How reliable is Pilot Power Group, LLC compared to peer California utilities?

Pilot Power Group, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with City & County of San Francisco - (CA) (27.13 c/kWh) across California.

Which counties and customers does Pilot Power Group, LLC serve in California?

EIA-861 filings list 3,678 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Pilot Power Group, LLC.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.