Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Merced Irrigation District (CA) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Merced Irrigation District (EIA ID 12312, CA) serves 11,850 customers at 24.15 c/kWh (-7.20 c/kWh vs California average) with no standalone IEEE SAIDI filing (1 county served) with 3,623 net-metered residential solar systems (30.57% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
12312
Res. Rate
24.15 c/kWh
SAIDI (All Events)
Not reported in EIA-861
Net-Metered PV
3,623 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Merced Irrigation District Compare on Tariffs and Reliability?

How Merced Irrigation District (Political Subdivision) performs across 1 county on kWh rates and outage resilience. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Merced Irrigation District (Political Subdivision) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr). Typical residential meters drew 596.6 kWh/mo ($144.10/mo) in 2025, while its tariff carries a high 24.15 c/kWh residential tariff (-7.20 c/kWh vs California average), yielding strong ~$2,608/yr solar savings (9.0-yr cash payback)—compare rates directly with Rancho Mirage Energy Authority (13.58 c/kWh).

Where Does Merced Irrigation District Sit Across US Utility Rates?

National utility tariff curve marking Merced Irrigation District at 24.15 c/kWh vs. 18.54 c/kWh US mean.

Merced Irrigation District Residential Tariff vs 1,989 US UtilitiesPositions Merced Irrigation District's 24.15 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhMerced Irrigation : 24.15 c

How Does Merced Irrigation District Rank Across Cost & Reliability?

Relative ranking of Merced Irrigation District on residential electricity pricing and annual IEEE SAIDI outage duration. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Merced Irrigation District Grid & Tariff BenchmarksShows where Merced Irrigation District ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate24.15 c/kWh

What Do EIA-861 Benchmarks Show for Merced Irrigation District?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Merced Irrigation District in California. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Lowest Rate #1,889 / 1,989

24.15 c/kWh (-7.20 vs CA)

Commercial avg: 18.87 c/kWh; Industrial: 15.21 c/kWh; est. residential bill $144.10/mo.

State Reliability Context

358.3 min/yr (CA Avg)

Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.

Post-25D Payback

9.0 Years @ 24.15 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,608/yr at 1,350 kWh/kW.

Distributed PV

3,623 Net-Metered Systems

14.697 MW residential PV (30.57% of customers) across 1 county; state FEMA declarations (2015-2026): 161.

Merced Irrigation District Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.2415 = $2,608/yr

EIA-861 2025 Utility ID 12312: Rate=24.15 c/kWh, Cust=11,850, PV=3,623.

Result: 9.0 yr 8 kW cash payback at 24.15 c/kWh (0% 25D).

What Are the EIA-861 Filing Metrics for Merced Irrigation District?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Merced Irrigation District. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for Merced Irrigation District (Utility ID 12312).
EIA Utility ID & BA CodeID 12312 · CISO
State & Ownership TypeCA · Political Subdivision
Retail Electricity Rates24.15 c/kWh Res · 18.87 c Comm · 15.21 c Ind
Avg Monthly Usage & Bill596.6 kWh/mo ($144.10/mo est.)
Residential Net-Metered PV3,623 systems (14.697 MW)
Counties Served (Sample)1 county (Merced)

Which Peer Electric Utilities Operate in CA?

Nearby California electric utilities of comparable customer size led by Rancho Mirage Energy Authority (13.58 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Rancho Mirage Energy Authority 13.58 c — 0 12,995
San Jacinto Power 16.97 c — 0 13,631
Pico Rivera Innovative Municipal Energy 15.99 c — 0 14,772
City of Azusa 20.77 c — 464 15,646
What to Check & Best-Fit Scenarios

What Should Merced Irrigation District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Merced Irrigation District (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether Merced Irrigation District acts as a wires-only TDU or bundled utility in CA.
  • Transformer limits: Merced Irrigation District interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

Merced Irrigation District Solar & Battery Evaluators

Compare your actual Merced Irrigation District monthly kWh statement against 24.15 c/kWh and verify current export tariffs in CA.

Merced Irrigation District Outage & Generator Planners

Use Merced Irrigation District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Merced Irrigation District (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

What is Merced Irrigation District's residential electricity rate and 2026 solar payback?

Merced Irrigation District averages 24.15 c/kWh (-7.20 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,608/yr (9.0-year payback).

How reliable is Merced Irrigation District compared to peer California utilities?

Merced Irrigation District did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with Rancho Mirage Energy Authority (13.58 c/kWh) across California.

Which counties and customers does Merced Irrigation District serve in California?

EIA-861 filings list 11,850 customers across 1 county including Merced, with 3,623 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Merced Irrigation District.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.